Loading...
HomeMy WebLinkAboutC505 - PLAN AND PROFILE (SANITARY)20'W BMP ACCESS ESMT 20' W B M P A C C E S S E S M T 25' W S A N S W R E S M T 25'W SAN SWR ESMT 20' BMP ACCESS EASEMENT20'W SAN SWR ESMTDOMIN O D RI V E WWW717 RIM=862.20 RIM=864.00 716 RIM=862.70 715 RIM=861.00 720 RIM=865.60 12' OF 42" RCP @0.49% 184' OF 42" RCP @0.46% 368' OF 42" RCP @0.46% 156' OF 42" RCP @0.42% STR. #714 42" PIPE END SECTION INV. IN 851.00 (42" RCP (N)) 446' OF 12" PVC @0.25% 22 3 ' O F 1 2 " P V C @ 0 . 2 5 %169' OF 24" RCP@0.51%STR. #CCCE-603 OUTSIDE DROP 4'DIA MHTC: 862.02INV. IN 836.55 (12" PVC (NW))INV. IN 846.00 (8" SDR-35 PVC (N))INV. OUT 836.45 (12" PVC (E))STR. #CCCE-602 CONCENTRIC STRUCTURE 48 DIA.TC: 862.58INV. IN 835.34 (12" PVC (W))INV. OUT 835.24 (12" PVC (SE))STR. #CCCE-601 CONCENTRIC STRUCTURE 48 DIA.TC: 856.14INV. IN 834.68 (12" PVC (NW)) 223' 0.25% 12" PVC 446' 0.25% 12" PVC EX 12" PVC SDR26 STUB INV= 834.56SDR21 SDR21 24" RCP INV. ELEV:853.81 42" RCP INV. ELEV:851.59 18095 Project Number: Drawing Number: Certified By: Checked ByDrawn ByIssue Date Revisions:PROJECT:Scope Drawings:CARMEL, INDIANANEWFORCARMEL CLAY SCHOOLSCARMEL ELEMENTARY SCHOOLSDrawing Title: 06-21-19 SO MK Rev. #Revision Description Issue Date 1 ADDENDUM 7/9/2019 3 ASI #1 8/28/2019 1. TEMPORARY TRAFFIC CONTROL DURING CONSTRUCTION TO CONFORM TO APPLICABLE LOCAL AND STATE STANDARDS. 2. ALL CONSTRUCTION ACTIVITY ON THIS SITE TO BE PERFORMED IN COMPLIANCE WITH APPLICABLE 0.S.H.A. STANDARDS FOR WORKER SAFETY. 3. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY ALL UTILITY LOCATIONS BEFORE CONSTRUCTION BEGINS. 4. CONTRACTORS SHALL MINIMIZE DAMAGE TO EXISTING TREES. SANITARY SEWER PLAN SANITARY SEWER PROFILE GENERAL NOTES SCALE: 1" =30' ALIGNMENT 604-601 SCALE:HORZ.: 1"=30' VERT.: 1"=5' LEGEND Existing Grade New Grade Granular Backfill C505 PLAN & PROFILE (SANITARY) NOTE* INSTALL FULL DEPTH GRANULAR BACKFILL WHEN UTILITY IS WITHIN 5' OF PAVEMENT. 4 4 2 TAC COMMENTS 8/12/2019 4 ASI #2 9/20/2019