Loading...
HomeMy WebLinkAboutL406 - SITE PLANTING PLAN866867868868869869865865870866866867868869871872(4) Phy-d(4) Pic-a(3) Phy-d(2) Pic-a(3) Jun-e(1) Pic-a(3) Pic-a(3) Pic-aExisting 10" HickoryRefer to LD100Existing Multi-leader Hackberry6" + 6"Refer to LD100Existing 6" HickoryRefer to LD100Existing 3" CherryRefer to LD100Existing 8" HickoryRefer to LD100Existing 10" HackberryRefer to LD100Existing 12" HickoryRefer to LD100Existing 10" HickoryRefer to LD100Existing 12" HickoryRefer to LD100Existing 12" HackberryRefer to LD100Existing Sapling Sweet GumRefer to LD100Existing 4" LindenRefer to LD100(2) Jun-e(3) Abi-c(5) Jun-o(3) Myr-p(6) Cor-a(3) Myr-p(5) Cor-a(3) Myr-p(5) Jun-o(4) Gin-p(3) Myr-p(2) Abi-c(3) Myr-p(3) Syr-r(3) Abi-c(2) Syr-r(4) Jun-o(3) Aro-a(3) Aro-a(3) Aro-a(6) Jun-o(3) AME-X(3) Syr-r(6) Aro-a(11) Jun-o(6) Aro-a(7) Jun-oExisting 15" HackberryRefer to LD100(1) Bet-n(1) Bet-nOHU OHU OHU OHUGGGGG GWWWWW W W W W WGGGGGGOHUOHUOHUOHU NO PARKING'A''C''C'CLAY CENTER ROAD Matchline - Refer to Sheet L405Matchline - Refer to Sheet L4050Scale 1" = 30'-0"60'30'15'NorthExisting Wooded Area :Refer to Sheet LD100 forTree Protection and Removal Plan1.Refer to Project Manual for Planting Specifications and Topsoil requirements.Refer to Plant Schedule and Planting Details for additional information.2.All materials are subject to the approval of the Landscape Architect and Owner atany time. Landscape Architect to inspect all plant locations and plant bedconditions prior to installation. On-site adjustments may be required.3.Rootballs shall meet or exceed size standards as set forth in 'AmericanStandards for Nursery Stock'. MAIN LEADERS OF ALL TREES SHALL REMAININTACT.4.Remove from the site any plant material that turns brown or defoliates within five(5) days after planting. Replace immediately with approved, specified material.5.Plant counts indicated on drawings are for Landscape Architect's use only.Contractor shall make own plant quantity takeoffs using drawings, specifications,and plant schedule requirements (i.e., spacing), unless otherwise directed byLandscape Architect. Contractor to verify bed measurements and installappropriate quantities as governed by plant spacing per schedule. Plant materialquantities shown on plan are minimum quantities. Additional material may beneeded to meet spacing requirements and field conditions.6.Seed all areas disturbed by construction activities that are not otherwise noted toreceive pavement, planting bed, or sod treatment.7.The Contractor shall install and/or amend topsoil in all proposed bed areas tomeet Specifications. Contractor shall coordinate quantity and placement oftopsoil. Landscaper shall verify depth of topsoil prior to plant installation. (Referto specifications for topsoil source and placement requirements)8.All tree locations shall be marked with 2x2" stakes prior to planting for review andapproval by the Landscape Architect. Any plant material installed in an incorrectlocation, by the judgment of the Landscape Architect, shall be reinstalled at theContractor's expense.9.All plant beds shall receive 3" minimum of shredded hardwood bark mulch(unless otherwise noted).10.Verify all utility locations in the field prior to beginning work. Repair all damagedutilities to Owner's satisfaction at no additional cost.11.The Contractor shall maintain all plant material and lawns until the project is fullyaccepted by the Landscape Architect, unless otherwise noted.12.All workmanship and materials shall be guaranteed by the Contractor for a periodof one calendar year after Final Acceptance.13.Install all plant material in accordance with all local codes and ordinances.Coordinate with the Owner to obtain any required permits necessary to completework.14.Contractor shall test all tree pits for drainage. Any tree pit that holds water formore than 24 hours shall be installed using tree pit drainage.15.Tree Protection Fencing is the responsibility of the Contractor. Minimum protectedarea shall include the full drip line of the canopy. NO construction activities,material storage, etc. may occur within that area. The Contractor shall ensure thatno soil compaction or tree damage occurs in any Protected areas, at any timeduring the construction process.16.Trees shall be matched in groups unless otherwise noted.17. LANDSCAPING MUST BE PLANTED ACCORDING TO THE DETAILS ON SHEET L410 - SEE PLANTING DETAILS.GENERAL LANDSCAPE ANDPLANTING NOTESORDINANCE CHARTLawn Seed MixRefer to Specification 32 92 00.PLANTING LEGENDZONING:S1 - INSTITUTIONAL / PUDBUFFER REQUIREMENTS:Level A: 5' width (front yard); 4 shade/evergreen + 10 shrubs / 100 l.f.Level D: 30' width; 8 shade/evergreen + (30% min. evergreen) + 2 ornamental + 20shrubs / 100 l.f.Substitutions: 3 shrubs / 1 evergreenOpen Space Afforestation: “Planting shall occur per the Urban Forester based on bestpractices and intent of bufferyard standards” Per Urban Forester: afforestation withstaggered row of native shade trees@10' o.c. Mature canopy to extend 30' width.PROPOSED:North West: 554 l.f. @ Level D; 63' existing wooded area to be protected and maintainedRequired: 44 shade / evergreen (of those min. 16 evergreen) + 11 ornamental + 111 shrubsProvided: 48 shade/evergreen+ 11 ornamental + 81 shrubs24 Existing shade trees + 4 new shade + 16 evergreen +10 evergreen (substitution 3shrubs/1 evergreen) = 54 total shade/evergreenShrub for Evergreen replacement (3x1): 111 required - 81 proposed = 30 shrubs = 10additional evergreensNorth East: 926 l.f. @ Level DRequired: 74 shade /evergreen + 19 ornamental + 185 shrubsProvided: Maintain existing wooded bufferEast: 754 l.f. @ Level DRequired: 61 shade /evergreen + 15 ornamental + 151 shrubsProvided: maintain existing wooded bufferSouth (West section): 906 l.f. @ Level D/ AfforestationRequired: staggered row of native shade trees@10' o.c. Mature canopy to extend 30'width.Afforestation: 906 / 10 (10'off center) = 90 shade treesProvided: 91 Shade treesSouth (Center section): 124 l.f. @ Level D/ AfforestationRequired: staggered row of native shade trees@10' o.c. Mature canopy to extend 30'width.Afforestation: 124 / 10 (10'off center) = 12 shade treesProvided: 12 ShadeSouth (East section): 369 l.f. @ Level DRequired: 37 shade / evergreen + 11 ornamental + 92 shrubsProvided: maintain existing wooded bufferWest: 1278 l.f. @ Level ARequired: 51 shade/ evergreen + 128 shrubsProvided: 51 shade + 23 evergreen + 59 shrubsShrub for Evergreen replacement (3x1): 128 required - 59 proposed = 69/3= 23additional evergreensPARKING REQUIREMENTS:INTERNAL PARKING: 1 shade + 5 shrubs / 10 parking spaces & no parking spacefarther than 66 ft. from shade treeInterior Parking: 148 parking spacesRequired: 15 shade tree + 74 shrubsProvided: 15 Shade + 74 shrubsFOUNDATION REQUIREMENTS:Planting beds min 5 ft. width except at driveways, courtyards, plazas, and pedestrianaccess; cover 75% of planting area; foundation shrub spacing shall not exceed 5 ft.intervalsRequired: (989 l.f. x 5 ft) = 4945 sq. ft. x 0.75 = 3708 sq. ft minimum coverageProvided: 4576 sq. ftSIGNAGE FOUNDATION REQUIREMENTS:Planting bed to match sign face sq. ft.Required: 63 sq. ft. x 2 sides = 126 sq. ft.Provided: 126 sq. ft.Prarie Seed MixRefer to Specification 32 92 00.Native Basin Edge PlugsRefer to Specification 32 92 16.Native Basin Seed MixRefer to Specification 32 92 16.