Loading...
HomeMy WebLinkAboutLD100 - TREE PROTECTION AND REMOVAL PLANG G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G GWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW W W W W WOHUOHUOHUOHUOHUOHUOHUOHUOHU W W W W W W W W W W W W W W W W W W W OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHUBC CDEFGHIAJCCDBCCDEFGHIAJCCD0Scale 1" = 100'-0"200'100'50'North1.For more detail on tree protection and fencing refer to specifications.2. Tree Protection Fencing locations are fixed. Install exactly where shown on these plans. Any adjustments to fencinglocations must be approved by the Owner. Damages will be assessed if tree protection fence location is adjusted withoutOwner approval. Fence deviation from this plan or approved change will be corrected by the General Contractor prior tothe start of construction.3.All tree pruning and limb restraint will be performed under the direct supervision of a Certified Arborist. Contractor shall notprune trees or restrain limbs.4.No staging, equipment, material storage, or vehicles are allowed on non-paved areas unless indicated otherwise on plan.5.Abandon all utilities to be removed when located within a Protected Root Zone.6.Backfill all depressed and void areas with top soil following removal of vegetation. Soil shall be free of debris. Compactsoils to ensure settling and sedimentation do not occur.7.Owner is responsible for transplanting identified trees, as noted. Coordinate with Owner if trees to be transplanted remainon site when mobilization begins.8.Cleanly cut all roots encountered during construction. Contractor to Air-knife all roots around trees around all indicated asbeing essential to the campus landscape vocabulary and any tree over 18" in diameter.9.Coordinate locations of Tree Protection Fencing and Construction Fencing prior to the start of construction activities. Inareas where Tree Protection and Construction Fences overlap, the Contractor may elect to install the more restrictivefence type of the two provided that the single fence accommodates the requirements of both fences.10.Trimming of existing trees shall occur no later than March 15th. All tree trimming shall be under the direct supervision of acertified arborist.11. If construction fencing limits access to tree area then tree protection fencing is not necessary.TREE PROTECTIONGENERAL NOTESTREE PRESERVATION LEGENDWooded Area to be ProtectedTrees to be RemovedTree Protection Fence Locations -To be installed PRIOR TO DEMOLITIONTree Protection FenceRefer to detail this sheet.Tree Protection FenceRefer to detail this sheet.TREE PRESERVATION CHARTSYMBOLWOODED AREA LOCATIONTREATMENTANorth Tree LineREFER TO LD101BNorth EastREMOVECNorth East PropertylineSAVEDSouth East GroupingSAVEESouth Center Single TreeSAVEFSouth Central GroupingSAVEGSouth Central/ West GroupingSAVEHSouth WestSAVEISouth WestREMOVEJSouth WestREMOVE1NOT TO SCALETREE PROTECTION FENCINGRemove trees tagged by Landscape Architect.Refer to LD101 for detail.