Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
C320 PERM EROSION CONTROL PLAN
830.0 829.3829.4 829.2 828.8 828.5 828.5 828.8 829.1 829.1 831.5 832.1 832.1 831.5 830.7 830.3 830.6 831.2 831.6 831.6 834.7 834.7 834.5 833.9 834.1 834.0 834.4 834.6 834.6 834.0 825.7 825.2824.8824.8825.2825.5 834.0 833.1 832.5 833.0 833.0 832.3 829.2 831.0 831.6 832.4 833.0 833.7 834.1 825.9 831.0 830.1 826.2 826.7 827.4 829.5 827.4826.8 891011121314 15 16 17 18 19 20 22 23 24 25 26 27 63 6564 66 6967 68 70 71 73 72 74 76 75 79 77 78 80 81 82 83 84 85 86 87 88 89 90 91 92 93 95 96 97 98 99 100 148149 833.421 C.A.#2-1 C.A.#2-2 C.A.#2-3 C.A.#2-4 C.A.#2-5 EX. LAKE #1 EX. LAKE #2 OU OUOU OUOU o o oo o o o o ooo o o o o ooo oo ooo o o o o o o o o o o oo o o o o o o o o o o oo MILLGATE DRIVE MILLGA T E C O U R T K E Y S T O N E P A R KW A Y ( U S 4 3 1 ) o oo o o oo o o ooo oooo o o o o o o o o o oo oo o o o oo ooW W W W W WW Wo o oo o oo o o o o o o o oo o oo o oo o o o o oo o oo o oo o oo o oo o o o o oo o oo o oo o oo o o o o oo o o o o o o o o > o o o> o o o> o o o> o o o> o o o> o o o > o o o > o o o > o o o > o o o > o o o> o o o > o o o > o o o > o o o > o o o > o o o > o o o 6.0' SUMP W/ SNOUT 3.5' SUMP W/ SNOUT CONTRACTOR TO REMOVE TEMP. EXIST. CONSTRUCTION ENTRANCE AND PIPE UPON COMPLETION OF SECTION 2 CONSTRUCTION & GRADE AS SHOWN ON SHEET C200 TO PROVIDE POSITIVE DRAINAGE ©THE COURTYARDSOF CARMELSECTION 2NORTH C320PERM EROSIONCONTROL PLANPS SF 620 620 EROSION CONTROL LEGEND EB TS EXISTING CONTOURS PROPOSED CONTOURS LD LIMITS OF DISTURBANCE TEMPORARY SEEDING (SEE EROSION CONTROL DETAILS, SHEET C331) EROSION CONTROL BLANKET (SEE EROSION CONTROL NOTE #3) PERMANENT SEEDING (SEE EROSION CONTROL DETAILS, SHEET C331) SILT FENCE (SEE EROSION CONTROL DETAILS, SHEET C332) 11/16/21