HomeMy WebLinkAboutC100 STORMWATER POLLUTION PREVENTION PLAN PHASE I12
GGGT(U)T(U)T(U)T(U)T(U)E(U)T(U)T(U)T(U)T(U)E(U)E(U)T(U)T(U)T(U)T(U)T(U)E(U)E(U)E(U)E(U)E(U)E(U)E(U)T(U)T(U)T(U)T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)T(U)T(U)
T(U)
T(U)
T(U)
T(U)
T(U)T(U)
T(U)T(U)T(U)T(U)T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)T(U)T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
E(U)
E(U)
E(U)
E(U)
E(U)
E(U)
E(U)
E(U)
E(U)
E(U)
E(U)
E(U)
E(U)
E(U)
E(U)
E(U)
E(U)
E(U)GGGGGGGGGGG
G
G
G
G
G
G
G
G
G
G
G
G
SPRING RUN ESTATESCROOKED STICK SECTION 5C
C
C
C
C
C
C
C
C
C C C C C C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
E
E E E E E
E E E E E
E
E
E
E
E
E
E
E EEEEEEEEEEEEDDD DDDD
D DDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDD
DDDDDD
D
D
D
D
D
DDDDDD DDDDDDDDDDDDDDDD
GGGT(U)T(U)T(U)T(U)T(U)EET(U)T(U)T(U)T(U)EET(U)T(U)T(U)T(U)T(U)EEEEEEE
ET(U)T(U)T(U)T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)T(U)T(U)
T(U)
T(U)
T(U)
T(U)
T(U)T(U)
T(U)T(U)T(U)T(U)T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)T(U)T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
GGGGGGGGGGG
G
G
G
G
G
G
G
G
G
G
G
G
SPRING RUN ESTATES
SPRING RUN ESTATESCROOKED STICK SECTION 5WWW
W
W
W
W
W
W
W W W W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
SF SF SF
S
F
SF
SF SF
SFSF SFSF
SF
SF
SF SF
SF
SF SFSFSFSFSFSFSFIP
IP
IP
IP
1
4
11
4
5
2
6
8
9
10
13
13
SFSFSFSFSFSFSF
SF
SF
SF
4
3
7
7
7
14
4SFSFSFSFSF4
15
GENERAL NOTES
1.IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO
VERIFY WITH THE OWNER DURING BIDDING AND DURING
CONSTRUCTION ACTIVITIES ALL ITEMS TO BE REMOVED. IT IS THE
RESPONSIBILITY OF THE CONTRACTOR TO REMOVE ANY
MATERIALS AND/OR STRUCTURES NOT LOCATED ON THIS SURVEY
FOR THE INSTALLATION OF THE NEW WORK.
2.IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO
VERIFY ALL EXISTING UTILITIES PERTAINING TO THEIR PHASE OF
WORK, AND TO VERIFY WHICH UTILITIES WILL BE REMOVED BY
UTILITY COMPANY. ANY AND ALL UTILITIES NOT REMOVED BY THE
UTILITY COMPANY SHALL BE REMOVED BY THE CONTRACTOR.
3.UTILITIES ARE SHOWN TO BE APPROXIMATE AND SHALL BE
RELOCATED AND/OR CAPPED AND ABANDONED BEFORE
CONSTRUCTION AT NO ADDITIONAL COST TO THE OWNER.
4.ALL DEMOLITION MATERIAL AND SALVAGEABLE MATERIAL IS THE
PROPERTY OF THE DEMOLITION CONTRACTOR AND SHALL BE
PROPERLY DISPOSED OF OFF THE SITE.
5.SLABS ON GRADE MUST BE REMOVED COMPLETELY AND TAKEN
OFF THE SITE.
6.ALL UTILITIES MUST REMAIN ACTIVE FOR AREA TENANTS THAT
ARE REMAINING. NO UTILITY SERVICE SHALL BE INTERRUPTED
DURING THE CONSTRUCTION PROCESS.
7.BEARINGS, DIMENSIONS, AND EASEMENTS ARE SHOWN FOR
REFERENCE ONLY. SEE RECORD SURVEYS AND PLATS FOR
EXACT INFORMATION.
8.ANY EXISTING TREE(S) THAT MAY REQUIRE REMOVAL BUT ARE
NOT SHOWN ON THE PLAN AS BEING REMOVED MAY BE DONE SO,
AS LONG AS THE TREE(S) ARE RELOCATED TO AN APPROVED
ALTERNATIVE LOCATION ON SITE.
9.IF THERE ARE ANY QUESTIONS CONCERNING THIS DEMOLITION
PLAN, PLEASE CONTACT THE ENGINEER BEFORE CONTINUING
WORK.
SITE PREPARATION / SWPPP PHASE 1 NOTES
INSTALL PERMIT POSTING AREA. 4" PVC TUBE WITH END CAPS ATTACHED TO
PROJECT CONSTRUCTION SIGN TO CONTAIN APPROVED CONSTRUCTION
DRAWINGS AND PERMITS FOR INSPECTORS.
USE EXISTING DRIVE FOR CONSTRUCTION ENTRANCE. REFER TO DETAIL ON
SHEET C103
INSTALL CONCRETE WASHOUT. REFER TO DETAIL ON SHEET C103
INSTALL SILT FENCE. REFER TO DETAIL ON SHEET C103
LIMITS OF PROPOSED BUILDING
STORM SEWER INLET TO BE MODIFIED TO RECIEVE ADDITIONAL STORM SEWER
CONNECTION.
PAVEMENT SAWCUT LIMITS.
REMOVE BUILDING, ELECTRIC SERVICE LINE(S) AND APPURTENANCES FROM
EXISTING BUILDING LOCATION.
REUSE SECONDARY (EMPTY) METER PIT FOR NEW DOMESTIC WATER SERVICE.
REMOVE EXISTING PAVEMENT FULL DEPTH.
REMOVE EXISTING TIMBER RETAINING WALL.
STAGING AREA. PROVIDE CONSTRUCTION DUMPSTER, FUELING AREA, AND
PORT-O-LET AS NEEDED.
REMOVE STONE DRIVE SURFACE AND STOCK PILE FOR REUSE ON STONE DRIVE
AREAS.
10'x20' BORING PIT FOR SANITARY SEWER AND GRINDER PUMP INSTALLATION (SEE
SHEET C500 FOR DETAILS).
REMOVE SECTION OF EX. 12" HDPE STORM SEWER - SEE DRAINAGE PLAN, SHEET
C600 FOR MORE INFORMATION. VERIFY INVERTS AT CUT LINES AND REPORT ANY
DISCREPANCY TO THE ENGINEER BEFORE CUTTING.
EXISTING AREAS
TOTAL SITE = 184.66 AC.
DISTURBED = 0.97 AC.
PERVIOUS = 0.085 AC.
IMPERVIOUS = 0.553 AC.
REMOVED ASPHALT PAVEMENT
REMOVED STONE AREA
HATCH LEGEND
OPEN CUT PAVEMENT FOR UTILITY TAPS
C100STORMWATER POLLUTION PREVENTION PLAN PHASE IW170206-C100 swppp1SWPPP PHASE 1 LEGEND
-INLET PROTECTION - USE SUBSURFACE
INLET PROTECTION WITH OVERFLOW
CAPABILITY ONSITE AND THE COCONUT
MATS (OR EQUAL) IN THE RIGHT OF WAY
- CONSTRUCTION ENTRANCE (USE EXISTING
ASPHALT DRIVE)
- STAGING AREA
- POSTING AREA - 4" PVC TUBE WITH END CAPS
ATTACHED TO PROJECT CONSTRUCTION SIGN
TO CONTAIN APPROVED CONSTRUCTION
DRAWINGS AND PERMITS FOR INSPECTORS.
- CONCRETE WASHOUT
- STOCKPILE AREA (TEMPORARY SEEDING
REQUIRED)
- SILT FENCE
- LIMITS OF DISTURBANCE
IP
SF
1
2
3
4
5
6
7
8
9
10
D
EROSION CONTROL NOTES
1.ALL DISTURBED AREAS SHALL BE SODDED OR SEEDED, EXCEPT
BUILDING PAD AND LANDSCAPE BEDS. SEE LANDSCAPE PLANS FOR
LOCATION OF LANDSCAPE BEDS.
2.INSTALL SILT FENCE ALONG ALL DOWNSTREAM SLOPES. SILT
FENCE TO FOLLOW CONTOUR.
3.THERE SHALL BE NO DIRT, DEBRIS OR STORAGE OF MATERIAL IN
THE STREET.
CONTACT PERSON FOR EROSION
CONTROL & SEDIMENT PRACTICES
EROSION CONTROL SPECIFICATIONS
1.THIS PLAN IS DESIGNED AS AN ATTEMPT TO PREVENT ANY AND ALL
SEDIMENT FROM LEAVING THE CONSTRUCTION SITE BY WAY OF
EROSION. IF EROSION OF SEDIMENT FROM THE SITE IS TAKING
PLACE, THE CONTRACTOR AND/OR OWNER SHALL TAKE
PREVENTATIVE ACTION IMMEDIATELY. THE ENGINEER SHALL BE
CONSULTED IN THE EVENT THIS HAPPENS.
2.TEMPORARY SEEDING IS TO BE APPLIED TO ANY DISTURBED AREA
THAT WILL REMAIN UNALTERED IN EXCESS OF 15 DAYS.
3.PERMANENT SEEDING IS TO BE APPLIED IMMEDIATELY TO AREAS
THAT HAVE ACHIEVED FINAL AND FINISHED GRADE.
4.PRESERVE EXISTING VEGETATION ON THE SITE WHENEVER AND
WHEREVER POSSIBLE TO PREVENT TOPSOIL EROSION.
5.ALL SEDIMENT CAPTURING MEASURES SHALL BE IMPLEMENTED
PRIOR TO THE DISTURBANCE OF THE CONSTRUCTION AREA THEY
ARE INTENDED TO SERVICE. ALL EROSION CONTROL MEASURES
PROPOSED ARE TO BE PROPERLY MAINTAINED TO CONTINUE THEIR
EFFECTIVENESS.
6.IF GRADING OCCURS DURING THE MONTHS OF DECEMBER, JANUARY
OR FEBRUARY DORMANT SEEDING PROCEDURES SHALL BE USED.
7.DURING DRY WEATHER, KEEP LAWNS WATERED WITH SPRINKLERS
OR OTHER APPROVED METHODS. RESEED ANY AREAS NOT
GERMINATING OR DAMAGED AT INTERVALS AS MAY BE REQUIRED
ACCORDING TO SEASONAL CONDITION AND/OR CONSTRUCTION
ACTIVITY. WATER GRASS AND EXECUTE NECESSARY WEEDING UNTIL
FULL STAND OF GRASS HAS BEEN OBTAINED.
8.THE IMPLEMENTATION AND MAINTENANCE OF THE EROSION
CONTROL IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR
AND/OR OWNER.
9.IT SHALL BE THE CONTRACTOR'S AND/OR OWNER'S RESPONSIBILITY
TO MINIMIZE SEDIMENTATION (FROM ON-SITE CONSTRUCTION
ACTIVITIES) FROM BEING DEPOSITED ONTO ADJACENT PROPERTIES
AND RECEIVING STREAMS/DITCHES IN STRICT COMPLIANCE WITH
"RULE 5" (327 IAC 15-5, CONSTRUCTION ACTIVITY STORM WATER
RUNOFF CONTROL). IT SHALL ALSO BE THE CONTRACTOR'S AND/OR
OWNER'S RESPONSIBILITY TO OBTAIN ANY APPROVALS REQUIRED
FROM THE LOCAL AUTHORITY AND TO SUBMIT A COMPLETE NOTICE
OF INTENT LETTER TO THE OFFICE OF WATER MANAGEMENT,
INDIANA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT PRIOR TO
ANY CONSTRUCTION ACTIVITY.
10.FOR SEASONAL VARIATIONS - SEE SEASONAL SOIL PROTECTION
CHART IN THESE PLANS.
11.PORTABLE TOILETS MUST BE ANCHORED.
WEIHE ENGINEERS, INC.
10505 N. COLLEGE AVE.
INDIANAPOLIS, IN 46268
TELEPHONE: (317) 846-6611
FAX: (317) 843-0546
EMAIL: PARKERF@WEIHE.NET
CONTACT PERSON: FRED PARKER, CPESC
LINE TYPES
UNDERGROUND GAS
UNDERGROUND WATER
UNDERGROUND ELECTRIC
UNDERGROUND COMMUNICATIONS
OVERHEAD UTILITY
FORCE MAIN
RIGHT OF WAY LINE
CHAIN LINK FENCE
BOARD FENCE
WROUGHT IRON FENCE
GUARD RAIL
HAND RAIL
SILT FENCE
BUILDING SETBACK LINE
BOUNDARY LINE
FLOW LINE
G G G
W W
E E E
C C C
OHU OHU
FM FM
SF SF
SECTION LINE
FARM FENCE
UNDERGROUND FIBER OPTICFOFO
INDEX CONTOUR
INTERMEDIATE CONTOUR
SANITARY SEWER
STORM SEWER REVISIONS AND ISSUESW17.0206PREPARED FOR:11128 CROOKED STICK LANE, CARMEL, IN 46032PROJECT NO.
SHEET NO.CHECKED BY:DRAWN BY:RAMDESIGNED BY:DWG NAME:PROJECT NO.:W17.0206DATEBY12.20.2017BJSDATE:RAMKnow what's below.
before you dig.Call
R MAINTENANCE BUILDINGISSUED FOR CARMEL TAC11.09.2017BJSISSUED FOR STATE RELEASE11.27.2017BJSW
S
N
E
STEVEN SCOTT RUCKER P.E. 11300279ENGINEERS317 | 846 - 6611800 | 452 - 6408317 | 843 - 0546 faxWEIHELand Surveying | Civil EngineeringLandscape ArchitectureALLAN H. WEIHE, P.E., L.S. - FOUNDER10505 N. College AvenueIndianapolis, Indiana 46280weihe.netBuild with confidence.SM12/20/2017
Part of the NW/4 of Section 14, Township 16 North, Range 4 East, Hamilton County, IndianaCTRWD SANITARY PERMIT APPLICATION11.21.2017WACISSUED FOR DRAINAGE REVISIONS12.08.2017BJSISSUED FOR DRAINAGE REVISIONS12.13.2017BJSISSUED FOR FINAL CONSTRUCTION DRAWINGS12.20.2017BJS11
12
13
14
DRY DETENTION
POND LOCATION
15