HomeMy WebLinkAboutC101 STORMWATER POLLUTION PREVENTION PLAN PHASE II*GGGT(U)T(U)T(U)T(U)T(U)E(U)T(U)T(U)T(U)T(U)E(U)E(U)T(U)T(U)T(U)T(U)T(U)E(U)E(U)E(U)E(U)E(U)E(U)E(U)T(U)T(U)T(U)T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)T(U)T(U)
T(U)
T(U)
T(U)
T(U)
T(U)T(U)
T(U)T(U)T(U)T(U)T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
E(U)
E(U)
E(U)
E(U)
E(U)
E(U)
E(U)
E(U)
E(U)
E(U)
E(U)
E(U)
E(U)
E(U)
E(U)
E(U)
E(U)
E(U)GGGGGGGGGGG
G
G
G
G
G
G
G
G
G
G
G
G
SPRING RUN ESTATESCROOKED STICK SECTION 5C
C
C
C
C
C
C
C
C
C C C C C C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
E
E E E E E
E E E E E
E
E
E
E
E
E
E
E EEEEEEEEEEEEPROPOSED MAINT. BLDG.
5000 SF
F.F.E. 869.0
MFPG=869±
MLAG=869.0
PROPOSED
ADMIN. BLDG.
3600 SF
F.F.E. 874.8
MFPG=866±
MLAG=874.75
STAIR WELL &
STORAGE
413 SF
F.F.E. 874.8
MFPG=866±
MLAG=874.80
DDD DDDD
D DDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDD
DDDDDD
D DD
D
D
DDDDDD EEEECCCCCFMFMFMFMFM FM
FM
FM
FM
FM
FM FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FMWWWW
W WWWW
W
W
WW SANSANSANSANSANEEEEDDDDDDDDDDDDDDDD
GGGT(U)T(U)T(U)T(U)T(U)EET(U)T(U)T(U)T(U)EET(U)T(U)T(U)T(U)T(U)EEEEEEE
ET(U)T(U)T(U)T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)T(U)T(U)
T(U)
T(U)
T(U)
T(U)
T(U)T(U)
T(U)T(U)T(U)T(U)T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
T(U)
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
GGGGGGGGGGG
G
G
G
G
G
G
G
G
G
G
G
G
SPRING RUN ESTATES
SPRING RUN ESTATESCROOKED STICK SECTION 5WWW
W
W
W
W
W
W
W W W W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
IP
IP
IP
IP
IP
SF SF SF
S
F
SF
SF SF
SFSF SFSF
SF
SF
SF SF
SF
SF SFSFSFSFSFSFSFSFSFSFSFSFSFSF
SF
SF
SFSFSFSFSFSF CONTACT PERSON FOR EROSION
CONTROL & SEDIMENT PRACTICES
WEIHE ENGINEERS, INC.
10505 N. COLLEGE AVE.
INDIANAPOLIS, IN 46268
TELEPHONE: (317) 846-6611
FAX: (317) 843-0546
EMAIL: PARKERF@WEIHE.NET
CONTACT PERSON: FRED PARKER, CPESC
-WARNING-
THIS PLAN TO BE USED FOR EROSION CONTROL
PURPOSES ONLY. ADDITIONAL EROSION
CONTROL MEASURES MAY BE REQUIRED IN THE
FIELD BY THE INSPECTOR.
-NOTE-
THIS PLAN INDICATES EROSION CONTROL
MEASURES REQUIRED AFTER SOIL STRIPPING
AND PAD BUILDING HAS TAKEN PLACE.
COORDINATE WITH DEVELOPER FOR
MEASURES REQUIRED UNTIL PROPERTY
TURNED OVER FOR DEVELOPMENT.
COORDINATE WITH SOIL CONSERVATION
DISTRICT REPRESENTATIVE FOR ANY OTHER
MEASURES REQUIRED DUE TO SITE
CONDITIONS.
DISTURBED ACREAGE
= 0.97± AC.
C101STORMWATER POLLUTION PREVENTION PLAN PHASE IIW170206-C101 swppp2SWPPP PHASE 2 LEGEND
- INLET PROTECTION - USE SUBSURFACE
INLET PROTECTION WITH OVERFLOW CAPABILITY ONSITE
AND THE COCONUT MATS (OR EQUAL) IN THE RIGHT OF WAY
- PERMANENT/TEMPORARY SEEDING
USE PLANTING CHART
- LIMITS OF DISTURBANCE (CONSTRUCTION LIMITS)
- SITE DISCHARGE POINT
- SILT FENCE
- EROSION CONTROL BLANKET - USE S150BN BIO-NET AS
SUPPLIED BY NORTH AMERICAN GREEN OR APPROVED
EQUAL
IP
*
D
LINE TYPES
UNDERGROUND GAS
UNDERGROUND WATER
UNDERGROUND ELECTRIC
UNDERGROUND COMMUNICATIONS
OVERHEAD UTILITY
FORCE MAIN
RIGHT OF WAY LINE
CHAIN LINK FENCE
BOARD FENCE
WROUGHT IRON FENCE
GUARD RAIL
HAND RAIL
SILT FENCE
BUILDING SETBACK LINE
BOUNDARY LINE
FLOW LINE
G G G
W W
E E E
C C C
OHU OHU
FM FM
SF SF
SECTION LINE
FARM FENCE
UNDERGROUND FIBER OPTICFOFO
INDEX CONTOUR
INTERMEDIATE CONTOUR
SANITARY SEWER
STORM SEWER
EROSION CONTROL NOTES
1.ALL DISTURBED AREAS SHALL BE SODDED OR SEEDED, EXCEPT
BUILDING PAD AND LANDSCAPE BEDS. SEE LANDSCAPE PLANS FOR
LOCATION OF LANDSCAPE BEDS.
2.INSTALL SILT FENCE ALONG ALL DOWNSTREAM SLOPES. SILT
FENCE TO FOLLOW CONTOUR.
3.THERE SHALL BE NO DIRT, DEBRIS OR STORAGE OF MATERIAL IN
THE STREET.
EROSION CONTROL SPECIFICATIONS
1.THIS PLAN IS DESIGNED AS AN ATTEMPT TO PREVENT ANY AND ALL
SEDIMENT FROM LEAVING THE CONSTRUCTION SITE BY WAY OF
EROSION. IF EROSION OF SEDIMENT FROM THE SITE IS TAKING
PLACE, THE CONTRACTOR AND/OR OWNER SHALL TAKE
PREVENTATIVE ACTION IMMEDIATELY. THE ENGINEER SHALL BE
CONSULTED IN THE EVENT THIS HAPPENS.
2.TEMPORARY SEEDING IS TO BE APPLIED TO ANY DISTURBED AREA
THAT WILL REMAIN UNALTERED IN EXCESS OF 15 DAYS.
3.PERMANENT SEEDING IS TO BE APPLIED IMMEDIATELY TO AREAS
THAT HAVE ACHIEVED FINAL AND FINISHED GRADE.
4.PRESERVE EXISTING VEGETATION ON THE SITE WHENEVER AND
WHEREVER POSSIBLE TO PREVENT TOPSOIL EROSION.
5.ALL SEDIMENT CAPTURING MEASURES SHALL BE IMPLEMENTED
PRIOR TO THE DISTURBANCE OF THE CONSTRUCTION AREA THEY
ARE INTENDED TO SERVICE. ALL EROSION CONTROL MEASURES
PROPOSED ARE TO BE PROPERLY MAINTAINED TO CONTINUE THEIR
EFFECTIVENESS.
6.IF GRADING OCCURS DURING THE MONTHS OF DECEMBER, JANUARY
OR FEBRUARY DORMANT SEEDING PROCEDURES SHALL BE USED.
7.DURING DRY WEATHER, KEEP LAWNS WATERED WITH SPRINKLERS
OR OTHER APPROVED METHODS. RESEED ANY AREAS NOT
GERMINATING OR DAMAGED AT INTERVALS AS MAY BE REQUIRED
ACCORDING TO SEASONAL CONDITION AND/OR CONSTRUCTION
ACTIVITY. WATER GRASS AND EXECUTE NECESSARY WEEDING UNTIL
FULL STAND OF GRASS HAS BEEN OBTAINED.
8.THE IMPLEMENTATION AND MAINTENANCE OF THE EROSION
CONTROL IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR
AND/OR OWNER.
9.IT SHALL BE THE CONTRACTOR'S AND/OR OWNER'S RESPONSIBILITY
TO MINIMIZE SEDIMENTATION (FROM ON-SITE CONSTRUCTION
ACTIVITIES) FROM BEING DEPOSITED ONTO ADJACENT PROPERTIES
AND RECEIVING STREAMS/DITCHES IN STRICT COMPLIANCE WITH
"RULE 5" (327 IAC 15-5, CONSTRUCTION ACTIVITY STORM WATER
RUNOFF CONTROL). IT SHALL ALSO BE THE CONTRACTOR'S AND/OR
OWNER'S RESPONSIBILITY TO OBTAIN ANY APPROVALS REQUIRED
FROM THE LOCAL AUTHORITY AND TO SUBMIT A COMPLETE NOTICE
OF INTENT LETTER TO THE OFFICE OF WATER MANAGEMENT,
INDIANA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT PRIOR TO
ANY CONSTRUCTION ACTIVITY.
10.FOR SEASONAL VARIATIONS - SEE SEASONAL SOIL PROTECTION
CHART IN THESE PLANS.
11.PORTABLE TOILETS MUST BE ANCHORED.REVISIONS AND ISSUESW17.0206PREPARED FOR:11128 CROOKED STICK LANE, CARMEL, IN 46032PROJECT NO.
SHEET NO.CHECKED BY:DRAWN BY:RAMDESIGNED BY:DWG NAME:PROJECT NO.:W17.0206DATEBY12.20.2017BJSDATE:RAMKnow what's below.
before you dig.Call
R MAINTENANCE BUILDINGISSUED FOR CARMEL TAC11.09.2017BJSISSUED FOR STATE RELEASE11.27.2017BJSW
S
N
E
STEVEN SCOTT RUCKER P.E. 11300279ENGINEERS317 | 846 - 6611800 | 452 - 6408317 | 843 - 0546 faxWEIHELand Surveying | Civil EngineeringLandscape ArchitectureALLAN H. WEIHE, P.E., L.S. - FOUNDER10505 N. College AvenueIndianapolis, Indiana 46280weihe.netBuild with confidence.SM12/20/2017
Part of the NW/4 of Section 14, Township 16 North, Range 4 East, Hamilton County, IndianaCTRWD SANITARY PERMIT APPLICATION11.21.2017WACISSUED FOR DRAINAGE REVISIONS12.08.2017BJSISSUED FOR DRAINAGE REVISIONS12.13.2017BJSISSUED FOR FINAL CONSTRUCTION DRAWINGS12.20.2017BJSSF