HomeMy WebLinkAboutC601 DRAINAGE DETAILSSANITARY SEWER STRUCTURE DATA TABLE
STRUCTURE NUMBER
101
200
201
300
301
EXISTING
STRUCTURE TYPE
INLET TYPE A
???
INLET TYPE A
INLET TYPE A
INLET TYPE A
INLET TYPE A
TOP OF CASTING
868.25
865.73
869.00
868.50
869.00
867.28
CASTING TYPE
NEENAH R-3405
???
NEENAH R-3405
NEENAH R-4342
NEENAH R-3405
OPEN GRATE
INVERT
INV OUT = 865.26(NW)
INV IN = 864.60(S)
INV OUT = 864.65(N)
INV OUT = 864.65(S)
INV OUT = 864.50(E)
INV IN = 864.45(W)
INV OUT = 864.45(N)
INV IN = 865.08(SE)
INV IN = 865.08(NE)
INV IN = 865.18(SW)
END SECTION N/A
STORM SEWER PIPE DATA TABLE
DOWNSTREAM
STRUCTURE
101
201
300
UPSTREAM
STRUCTURE
EXISTING
200
301
SIZE
12"
12"
12"
MATERIAL
HDPE
HDPE
HDPE
LENGTH
83'
14'
10'
SLOPE
0.22%
0.36%
0.50%
C601DRAINAGE DETAILSREVISIONS AND ISSUESW17.0206PREPARED FOR:11128 CROOKED STICK LANE, CARMEL, IN 46032PROJECT NO.
SHEET NO.CHECKED BY:DRAWN BY:RAMDESIGNED BY:DWG NAME:PROJECT NO.:W17.0206DATEBY12.20.2017BJSDATE:RAMKnow what's below.
before you dig.Call
R MAINTENANCE BUILDINGISSUED FOR CARMEL TAC11.09.2017BJSISSUED FOR STATE RELEASE11.27.2017BJSSTEVEN SCOTT RUCKER P.E. 11300279ENGINEERS317 | 846 - 6611800 | 452 - 6408317 | 843 - 0546 faxWEIHELand Surveying | Civil EngineeringLandscape ArchitectureALLAN H. WEIHE, P.E., L.S. - FOUNDER10505 N. College AvenueIndianapolis, Indiana 46280weihe.netBuild with confidence.SM12/20/2017
Part of the NW/4 of Section 14, Township 16 North, Range 4 East, Hamilton County, IndianaCTRWD SANITARY PERMIT APPLICATION11.21.2017WACISSUED FOR DRAINAGE REVISIONS12.08.2017BJSISSUED FOR DRAINAGE REVISIONS12.13.2017BJSISSUED FOR FINAL CONSTRUCTION DRAWINGS12.20.2017BJS11"PAVED AREA INLET TYPE "A"
22"X22"
6" (TYP.)VARIES16" MIN.CLASS "A" CONCRETEDIA.SECTION VARIES(4.0' MAX.)DIA.INLET SET ON 6" BASE OF
#8 STONE OR #2 STONE
1.STRAIGHT-OUT CONNECTIONS SHOULD NOT BE
MADE TO EITHER PRECAST BOX OR INLET
WALL TOUCHED BY A SKEW/CORNER
CONNECTION UNLESS SUFFICIENT BOX INLET
WALL AREA REMAINS ON EACH SIDE OF THE
CONNECTING PIPE TO ENSURE STRUCTURAL
INTEGRITY OF THE PRECAST BOX.
2.A MAXIMUM OF TWO (2) SKEW/CORNER
CONNECTIONS WILL BE ALLOWED FOR EACH
PRECAST BOX INLET.
3.REFER TO PRECAST CONCRETE ADJUSTING
RING DETAIL AS REQUIRED
6" (TYP.)8"T.O.C. ELEVATION E.J. 5250
NEENAH R-3405
OR EQUAL
NOTES
1.6" CONCRETE PRECAST OR POURED IN PLACE.
2.REFER TO BEDDING DETAIL AS REQUIRED
E.J. 5250
NEENAH R-3405
OR EQUAL
SLOPESLOPESLOPE
6" CONCRETE SLOPE3'-6"3'-6"3'-6"3'-6"
"DUMP NO WASTE-DRAINS TO WATERWAY"
PAVEMENT
PIPE SIZES 12" TO 15"(NO SCALE)
6"6"6"6"℄
℄
STORM STRUCTURE TABLE
STORM PIPE TABLE
(2) "B" BORROW OR EQUIV.
GRANULAR MATERIAL
COMPACTED TO 95% STANDARD
PROCTOR DENSITY.
(NO SCALE)
1.25 Bc + 12" (MIN.)
Bc
d27" & SMALLER
30" TO 60"
66" & LARGER
3
4
6
D d(MIN.)
GREATER THAN 5' (1) 1.25 Bc + 24" (MIN.)
FOR > 42" DIA.
FOR < 42" DIA.
REGULAR BACKFILL(1)
SPRINGLINE (1)1/2 BcMIN. 12"TYPICAL BEDDING SECTION - HDPE
EDGE OF
PAVEMENT, CURB,
GUTTER OR SIMILAR
STRUCTURE IN THE
PUBLIC
RIGHT-OF-WAY.(1) WELL PLACED "B"
BORROW OR EQUIV.
GRANULAR MATERIAL.
NOTES:
1. ALL BEDDING & INITIAL BACKFILL SHALL BE
INSTALLED IN 6" TO 12" BALANCED LIFTS.
2. MIN. OF 9" CLEARANCE EACH SIDE OF PIPE FOR
42" DIA. AND LESS.
3. MIN. OF 12" CLEARANCE EACH SIDE OF PIPE FOR
LARGER THAN 42" DIA.
(1) "B" BORROW OR
EQUIV. GRANULAR
MATERIAL
COMPACTED TO 90%
STANDARD PROCTOR
DENSITY
5' OR LESS (2)
LEGEND:
DEPTH OF BEDDING
MATERIAL BELOW PIPE
Bc = OUTSIDE DIAMETER
D = INSIDE DIAMETER
d = DEPTH OF BEDDING
MATERIAL BELOW PIPE
SIDE
END
PLAN
METAL END SECTION
HOOK BOLT
SCALE: 1/2" = 1' - 0"
DETENTION POND OUTLET
CONTROL STRUCTURE
3:1 SLO
P
E
3:1 S
L
O
P
E
30'
6"
BANK EMERGENCY OVERFLOW WEIR
(NO SCALE)
INSTALLATION
1.REMOVE AND PROPERLY DISPOSE OF BRUSH, TREES, AND OTHER DEBRIS FROM THE FOUNDATION AREA.
2.EXCAVATE FOUNDATION SUBGRADES BELOW DESIGN ELEVATION TO ALLOW FOR THICKNESS OF THE FILTER
MEDIUM (GEOTEXTILE FABRIC OR WELL-GRADED AGGREGATE) AND RIPRAP.
3.SMOOTH THE SUBGRADE ENOUGH TO PROTECT GEOTEXTILE FABRIC FROM TEARING.
4.PLACE GEOTEXTILE FABRIC OR AGGREGATE FILTER MEDIUM ON THE COMPACTED AND SMOOTHED
FOUNDATION. IF MORE THAN ONE PIECE OF GEOTEXTILE FABRIC IS NEEDED, THE UPSTREAM PIECE SHOULD
OVERLAP THE DOWNSTREAM PIECE BY AT LEAST 12 INCHES.
5.INSTALL RIPRAP TO THE LINES AND ELEVATIONS SHOWN IN THE CONSTRUCTION PLANS. THE RIPRAP SHOULD
FORM A DENSE, UNIFORM, AND WELL-GRADED MASS WITH FEW VOIDS. SELECTIVE LOADING AT THE QUARRY
AND SOME HAND PLACEMENT MAY BE NECESSARY TO OBTAIN GOOD DISTRIBUTION OF STONE SIZES.
6.IF GEOTEXTILE FABRIC TEARS WHEN PLACING RIPRAP, REPAIR IMMEDIATELY BY LAYING AND STAPLING A
PIECE OF FABRIC OVER DAMAGED AREA, OVERLAPPING THE UNDAMAGED AREAS BY AT LEAST 12 INCHES.
7.BLEND RIPRAP SMOOTHLY TO SURROUNDING GRADE, AVOIDING OVERFILL OR CHANNEL OBSTRUCTION.
MAINTENANCE
1.INSPECT WITHIN 24 HOURS OF EACH RAIN EVENT AND AT LEAST ONCE EVERY SEVEN CALENDAR DAYS WHEN
WITNESSING FLOW THROUGH THE CHANNEL.
2.WHEN STONES HAVE BEEN DISPLACED, REMOVE DEBRIS AND REPLACE STONES IN SUCH A WAY AS TO NOT
RESTRICT THE FLOW AREA.
3.IF FILTER FABRIC IS DAMAGED, REMOVE THE RIPRAP AND REPAIR BY ADDING ANOTHER LAYER OF FABRIC,
OVERLAPPING ADJACENT, UNDAMAGED AREAS BY 12 INCHES. SECURE FABRIC WITH ANCHOR PINS SPACED
EVERY THREE FEET, THEN REPLACE RIPRAP AS NEEDED.
4.CHECK FOR SEDIMENT ACCUMULATION, BANK INSTABILITY, AND SCOUR HOLES AND MAKE NECESSARY
REPAIRS PROMPTLY.
5.REFERENCE THE INDIANA STORM WATER QUALITY MANUAL FOR MORE INFORMATION ON CONSTRUCTION
AND MAINTENANCE OF RIPRAP LINE CHANNELS.
6" DEPTH RIPRAP OVER
GEOTEXTILE FILTER FABRIC
OR BEDDING MATERIAL
6"
ELEV. = 868.50
ELEV. = 869.50
NOTE: SEE HAMILTON COUNTY
STANDARD DETAILS CT-6 AND CT-10 ON
SHEET C603 FOR TYPICAL STAMPED
LETTERING FOR ALL CASTINGS.