HomeMy WebLinkAboutC103 STORMWATER POLLUTION PREVENTION PLAN PHASE IIW
W W
W
WEST CAR
M
E
L
D
R
I
V
E
GGPROPOSED BUILDING
20,121SF± PER FLOOR
F.F.E. = 829.85
DDDDDDDDDDDDDDDDD
D
D
D
DDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDCSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMESMT. FOR BMP,
DETENTION, AND ACCESS
ESMT. FOR BMP,
DETENTION, AND ACCESS
ESMT. FOR BMP,
DETENTION, AND ACCESS
ESMT. FOR BMP,
DETENTION, AND ACCESS WWWWWWWWWWWWWWWWWWEE E EEEEEEEDRY POND RIP RAP REVETMENT PAD
IP
IP
IP
IP SDSDSDSDSDSDSDSDSDSDSDSDSDSDSFSFSFSFSFSFSFIP
SFSFSFSFSFSFSFSFSFSFSFSFSFSFSF
SF
6
5
4
1
1
1
1
7
8
9
2
3
10 11
12
13
CONTACT PERSON FOR EROSION
CONTROL & SEDIMENT PRACTICES
WEIHE ENGINEERS, INC.
10505 N. COLLEGE AVE.
INDIANAPOLIS, IN 46268
TELEPHONE: (317) 846-6611
FAX: (317) 843-0546
EMAIL: PARKERF@WEIHE.NET
CONTACT PERSON: FRED PARKER, CPESC
-WARNING-
THIS PLAN TO BE USED FOR EROSION CONTROL
PURPOSES ONLY. ADDITIONAL EROSION
CONTROL MEASURES MAY BE REQUIRED IN THE
FIELD BY THE INSPECTOR.
-NOTE-
THIS PLAN INDICATES EROSION CONTROL
MEASURES REQUIRED AFTER SOIL STRIPPING
AND PAD BUILDING HAS TAKEN PLACE.
COORDINATE WITH DEVELOPER FOR
MEASURES REQUIRED UNTIL PROPERTY
TURNED OVER FOR DEVELOPMENT.
COORDINATE WITH SOIL CONSERVATION
DISTRICT REPRESENTATIVE FOR ANY OTHER
MEASURES REQUIRED DUE TO SITE
CONDITIONS.
DISTURBED ACREAGE
=1.20± AC.
LAND DESCRIPTION
C103STORMWATER POLLUTION PREVENTION PLAN PHASE IIW190582-C101 swppp2SWPPP PHASE 2 LEGEND
- INLET PROTECTION - USE SUBSURFACE
INLET PROTECTION WITH OVERFLOW CAPABILITY
- PERMANENT/TEMPORARY SEEDING
USE PLANTING CHART
- THE DRY POND BASIN BOTTOM TO BE PLANTED WITH NATIVE
SEED MIX THEN TOPPED WITH AN EROSION BLANKET
- EROSION CONTROL BLANKET - USE S150BN BIO-NET AS
SUPPLIED BY NORTH AMERICAN GREEN OR APPROVED
EQUAL
- LIMITS OF DISTURBANCE (CONSTRUCTION LIMITS)
IP
D
LINE TYPES
UNDERGROUND GAS
UNDERGROUND WATER
AERIAL ELECTRIC
UNDERGROUND ELECTRIC
UNDERGROUND COMMUNICATIONS
AERIAL COMMUNICATIONS
OVERHEAD UTILITY
FORCE MAIN
RIGHT OF WAY LINE
CHAIN LINK FENCE
BOARD FENCE
WROUGHT IRON FENCE
GUARD RAIL
HAND RAIL
SILT FENCE
BUILDING SETBACK LINE
BOUNDARY LINE
FLOW LINE
G G G
W W
E(A)E(A)
E E E
C C C
C(A)C(A)
OHU OHU
FM FM
SF SF
AERIAL FIBER OPTIC CABLEFO(A)FO(A)
SECTION LINE
FARM FENCE
UNDERGROUND FIBER OPTICFOFO
INDEX CONTOUR
INTERMEDIATE CONTOUR
SANITARY SEWER
STORM SEWER
EROSION CONTROL NOTES
1.ALL DISTURBED AREAS SHALL BE SODDED OR SEEDED, EXCEPT
BUILDING PAD AND LANDSCAPE BEDS. SEE LANDSCAPE PLANS FOR
LOCATION OF LANDSCAPE BEDS.
2.INSTALL SILT FENCE ALONG ALL DOWNSTREAM SLOPES. SILT
FENCE TO FOLLOW CONTOUR.
3.THERE SHALL BE NO DIRT, DEBRIS OR STORAGE OF MATERIAL IN
THE STREET.
EROSION CONTROL SPECIFICATIONS
1.THIS PLAN IS DESIGNED AS AN ATTEMPT TO PREVENT ANY AND ALL
SEDIMENT FROM LEAVING THE CONSTRUCTION SITE BY WAY OF
EROSION. IF EROSION OF SEDIMENT FROM THE SITE IS TAKING
PLACE, THE CONTRACTOR AND/OR OWNER SHALL TAKE
PREVENTATIVE ACTION IMMEDIATELY. THE ENGINEER SHALL BE
CONSULTED IN THE EVENT THIS HAPPENS.
2.TEMPORARY SEEDING IS TO BE APPLIED TO ANY DISTURBED AREA
THAT WILL REMAIN UNALTERED IN EXCESS OF 15 DAYS.
3.PERMANENT SEEDING IS TO BE APPLIED IMMEDIATELY TO AREAS
THAT HAVE ACHIEVED FINAL AND FINISHED GRADE.
4.PRESERVE EXISTING VEGETATION ON THE SITE WHENEVER AND
WHEREVER POSSIBLE TO PREVENT TOPSOIL EROSION.
5.ALL SEDIMENT CAPTURING MEASURES SHALL BE IMPLEMENTED
PRIOR TO THE DISTURBANCE OF THE CONSTRUCTION AREA THEY
ARE INTENDED TO SERVICE. ALL EROSION CONTROL MEASURES
PROPOSED ARE TO BE PROPERLY MAINTAINED TO CONTINUE THEIR
EFFECTIVENESS.
6.IF GRADING OCCURS DURING THE MONTHS OF DECEMBER, JANUARY
OR FEBRUARY DORMANT SEEDING PROCEDURES SHALL BE USED.
7.DURING DRY WEATHER, KEEP LAWNS WATERED WITH SPRINKLERS
OR OTHER APPROVED METHODS. RESEED ANY AREAS NOT
GERMINATING OR DAMAGED AT INTERVALS AS MAY BE REQUIRED
ACCORDING TO SEASONAL CONDITION AND/OR CONSTRUCTION
ACTIVITY. WATER GRASS AND EXECUTE NECESSARY WEEDING UNTIL
FULL STAND OF GRASS HAS BEEN OBTAINED.
8.THE IMPLEMENTATION AND MAINTENANCE OF THE EROSION
CONTROL IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR
AND/OR OWNER.
9.IT SHALL BE THE CONTRACTOR'S AND/OR OWNER'S RESPONSIBILITY
TO MINIMIZE SEDIMENTATION (FROM ON-SITE CONSTRUCTION
ACTIVITIES) FROM BEING DEPOSITED ONTO ADJACENT PROPERTIES
AND RECEIVING STREAMS/DITCHES IN STRICT COMPLIANCE WITH
"RULE 5" (327 IAC 15-5, CONSTRUCTION ACTIVITY STORM WATER
RUNOFF CONTROL). IT SHALL ALSO BE THE CONTRACTOR'S AND/OR
OWNER'S RESPONSIBILITY TO OBTAIN ANY APPROVALS REQUIRED
FROM THE LOCAL AUTHORITY AND TO SUBMIT A COMPLETE NOTICE
OF INTENT LETTER TO THE OFFICE OF WATER MANAGEMENT,
INDIANA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT PRIOR TO
ANY CONSTRUCTION ACTIVITY.
10.FOR SEASONAL VARIATIONS - SEE SEASONAL SOIL PROTECTION
CHART IN THESE PLANS.
11.PORTABLE TOILETS MUST BE ANCHORED.REVISIONS AND ISSUESPart of Section 36, Township 18 North, Range 3 East, Hamilton County, IndianaW19.0582PREPARED FOR:147 & 155 WEST CARMEL DRIVE, CARMEL, INDIANAPROJECT NO.
SHEET NO.CHECKED BY:DRAWN BY:JSDESIGNED BY:DWG NAME:PROJECT NO.:W19.0582DATEBY08.17.2020SSRDATE:RLWKnow what's below.
before you dig.Call
R
EXTRA SPACE STORAGE - CARMELISSUED FOR CITY REVIEW01.13.2020BJSISSUED FOR TAC REVISIONS05.12.2020BJSW
S
N
E ENGINEERS317 | 846 - 6611800 | 452 - 6408317 | 843 - 0546 faxWEIHELand Surveying | Civil EngineeringLandscape ArchitectureALLAN H. WEIHE, P.E., L.S. - FOUNDER10505 N. College AvenueIndianapolis, Indiana 46280weihe.netBuild with confidence.SMSTEVEN SCOTT RUCKER, PE No. 11300279
08/17/2020TAC REVISIONS03.30.2020BJSISSUED FOR TAC REVISIONS06.08.2020ISSUED FOR TAC REVISIONS07.16.2020BJSWALL GRADING CLARIFICATION07.23.2020BJS100% BID AND PERMIT PLANS08.17.2020BJSPROJECT BM
HARRISON MONUMENT AT THE EAST QUARTER CORNER OF SECTION 36, TOWNSHIP18
NORTH, RANGE 03 EAST PER HAMILTON COUNTY SURVEYOR'S OFFICE CORNER
NUMBER 18033606. LOCATED IN THE SOUTHBOUND LANE OF RANGELINE ROAD
APPROXIMATELY 190 FEET NORTH OF THE INTERSECTION OF EXECUTIVE DRIVE AND
RANGELINE ROAD.
ELEV.844.55 (NAVD 88)
SITE TBM
CUT 'X' ON THE SOUTH BONNET BOLT OF A FIRE HYDRANT LOCATED APPROXIMATELY 22
FEET NORTHWEST OF THE NORTHWEST CORNER OF THE SURVEYED REAL ESTATE ON
THE SOUTH SIDE OF CARMEL DRIVE.
ELEV.831.54 (NAVD 88)
BENCHMARK INFORMATION
APPROXIMATELY 4.3 ACRES LOCATED AT 147 AND 155 WEST CARMEL DRIVE - PART
OF SOUTHEAST 14, SECTION 36, TOWNSHIP 18 NORTH, RANGE 3 EAST, CLAY
TOWNSHIP, HAMILTON COUNTY, INDIANA
DRAINAGE PLAN NOTES
DOWNSPOUTS TO CONNECT TO PROPOSED ROOF DRAIN. COORDINATE
WITH ARCHITECTURAL PLANS.
TRENCH DRAIN
CONNECT TRENCH DRAIN TO PROPOSED STRUCTURE
WATER QUALITY UNIT
CONTROL STRUCTURE
DIVERSION STRUCTURE
12' WIDE EMERGENCY OVERFLOW.
INSTALL NEW BEEHIVE STRUCTURE. CONNECT TO EXISTING 15" PIPE
AND EXTEND NEW 15" PIPE WEST TO NEW STRUCTURE WEST OF THE
PROPOSED SIDEWALK.
RECONNECT 6" OUTLET FROM THE DRAIN TO STRUCTURE 304.
NATIVE PLANTINGS WITHIN BASIN. REFER TO SPECS ON SHEET C601.
SIGN FOR NATIVE PLANTINGS. DETAIL ON SHEET C601.
CONNECT STRUCTURE 900 TO EXISTING 15" PIPE
STONE LEVEL SPREADER WITH UNDER DRAIN. REFER TO DETAIL ON
SHEET C601
1
2
3
4
5
6
7
8
9
10
11
12
13