Loading...
HomeMy WebLinkAboutC603 OVERFLOW ROUTING PLANE OHUOHUOHUOHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU G W W W G G W WEST CAR M E L D R I V E GGG PROPOSED BUILDING 20,121SF± PER FLOOR F.F.E. = 829.85CSTMSTMSTMSTMSTMSTMSTM STMSTMSTMSTMSTMSTMESMT. FOR BMP, DETENTION, AND ACCESS ESMT. FOR BMP, DETENTION, AND ACCESS ESMT. FOR BMP, DETENTION, AND ACCESS ESMT. FOR BMP, DETENTION, AND ACCESS WWWWWWWWWWWWWWWWWWEE E EEEEEEEDRY POND C603OVERFLOW ROUTING PLANW190582-C601 OVERFLOW ROUTING PLANREVISIONS AND ISSUESPart of Section 36, Township 18 North, Range 3 East, Hamilton County, IndianaW19.0582PREPARED FOR:147 & 155 WEST CARMEL DRIVE, CARMEL, INDIANAPROJECT NO. SHEET NO.CHECKED BY:DRAWN BY:JSDESIGNED BY:DWG NAME:PROJECT NO.:W19.0582DATEBY08.17.2020SSRDATE:RLWKnow what's below. before you dig.Call R EXTRA SPACE STORAGE - CARMELISSUED FOR CITY REVIEW01.13.2020BJSISSUED FOR TAC REVISIONS05.12.2020BJSW S N E ENGINEERS317 | 846 - 6611800 | 452 - 6408317 | 843 - 0546 faxWEIHELand Surveying | Civil EngineeringLandscape ArchitectureALLAN H. WEIHE, P.E., L.S. - FOUNDER10505 N. College AvenueIndianapolis, Indiana 46280weihe.netBuild with confidence.SMSTEVEN SCOTT RUCKER, PE No. 11300279 08/17/2020TAC REVISIONS03.30.2020BJSISSUED FOR TAC REVISIONS06.08.2020ISSUED FOR TAC REVISIONS07.16.2020BJSWALL GRADING CLARIFICATION07.23.2020BJS100% BID AND PERMIT PLANS08.17.2020BJSELECTRICAL RISER GUY ANCHOR ELECTRIC JUNCTION BOX ORNAMENTAL LIGHT GENERATOR STREET LIGHT ELECTRIC MANHOLE ELECTRIC OUTLET UTILITY POLE UTILITY POLE W/ TRANSFORMER TRANSFORMER COMMUNICATIONS JUNCTION BOX COMMUNICATIONS MANHOLE COMMUNICATIONS PEDESTAL RIGHT OF WAY LINE FENCE GUARD RAIL BOUNDARY LINE FIRE DEPT HOOKUP FIRE HYDRANT POST INDICATOR VALVE WATER METER WATER VALVE GAS METER GAS VALVE ELECTRIC METER LIQUID PROPANE GAS TANK MONITORING WELL TRAFFIC SIGNAL POLE TRAFFIC SIGNAL BOLLARD POST SIGN PARKING WHEEL STOP DOWN SPOUT ACCESSIBLE SPACE GATE POST COMMUNICATIONS RISER STORM CLEANOUT BEEHIVE INLET CURB INLET FLOOR DRAIN ROUND INLET SQUARE INLET STORM MANHOLE SANITARY SEWER CLEANOUT LIFT STATION SANITARY SEWER MANHOLE SANITARY STUB MARKER PARKING LOT LIGHT (1 HEAD) ROW RIGHT OF WAY ESMT EASEMENT D.&U.E.DRAINAGE AND UTILITY EASEMENT FFE FINISH FLOOR ELEVATION TOC TOP OF CASTING CMP CORRUGATED METAL PIPE RCP REINFORCED CONCRETE PIPE PVC POLYVINYL CHLORIDE PIPE VCP VITRIFIED CLAY PIPE HDPE HIGH DENSITY POLYETHYLENE PIPE DIP DUCTILE IRON PIPE SSD SUB SURFACE DRAIN PIPE STM STORM SAN SANITARY STR STRUCTURE CO CLEANOUT DRAINAGE PLAN LEGEND UTILITIES ABBREVIATIONS OTHER LINE TYPES FLOW LINE INDEX CONTOUR INTERMEDIATE CONTOUR SANITARY SEWER MAIN STORM SEWER MAIN UNDERGROUND GAS UNDERGROUND WATER AERIAL ELECTRIC UNDERGROUND ELECTRIC UNDERGROUND COMMUNICATIONS AERIAL COMMUNICATIONS OVERHEAD UTILITY FORCE MAIN G G G W W E(A)E(A) E E E C C C C(A)C(A) OHU OHU FM FM AERIAL FIBER OPTIC CABLEFO(A)FO(A) UNDERGROUND FIBER OPTICFOFO EMERGENCY FLOOD ROUTE SANITARY SEWER LATERALSANSAN ROOF DRAINSTMSTM SUB SURFACE DRAIN FLOW DIRECTION AND SLOPE D D LIMITS OF DISTURBANCE 100 YEAR CLOGGED INLET PONDING LIMITS GENERAL NOTES THE SITE DOES NOT LIE IN A SPECIAL FLOOD HAZARD AREA AS ESTABLISHED BY THE FEDERAL EMERGENCY MANAGEMENT AGENCY - NATIONAL FLOOD INSURANCE PROGRAM, WHEN PLOTTED BY SCALE ON FLOOD INSURANCE RATE MAP #18057C0209 G, DATED NOVEMBER 19, 2014. BENCHMARK DATA BM G 54 - ISHC BRONZE DISK ON A CONCRETE POST PROJECTING 1.5 FT. OUT OF THE GROUND ALONG U.S. 31, 1.4 MILES NORTH OF I-465, 0.4 MILES SOUTH OF 116TH STREET, 100 FT. WEST OF CENTERLINE OF SOUTH BOUND LANE OF U.S. 31, AND 2 FT. EAST OF R/W FENCE. BM G 55 - ISHC BRONZE DISK ON A CONCRETE POST PROJECTING 1.5 FT. OUT OF THE GROUND ALONG U.S. 31, 2.6 MILES NORTH OF I-465, 0.7 MILES SOUTH OF 131ST STREET, 83 FT. WEST OF CENTERLINE OF SOUTH BOUND LANE OF U.S. 31. BM Y 42 - CGS DISK IN CONCRETE SLAB ON THE EAST SIDE OF THE MONON TRAIL 218 FT. SOUTH OF 111TH STREET. M.F.P.G. = 828.90 M.L.A.G. = 828.85