Loading...
HomeMy WebLinkAboutFlowing Well Park ImprovementsGeneral Notes Nothing set forth in these Drawings shall release any Contractor from responsibility to provide appropriate quantities, field measurements, dimensional stability, installation, anchorage and coordination with other trades, or waive the Contractor's responsibility to identify and resolve deviations from the requirements of the Contract Documents, or waive the Contractor's responsibility to alert the Architect to errors or omissions contained therein. Each Contractor shall verify in the field all existing applicable conditions and dimensions shown on the Drawings and as pertinent to the intent of these Drawings. Any discrepancy discovered shall be brought to the attention of the Architect prior to the commencement of any Work affected by, or related to, such discrepancy. Each Contractor shall be responsible for all costs associated with, or caused by failure to comply with requirement. Each Contractor shall review in advance all portions of the Work to verify that the Work will not prohibit completion of the Project as intended in these Contract Documents. Any questions shall be promptly referred to the Architect for resolution. Vicinity Map Thoroughfare Map Each Contractor shall refer to the Project Manual for cleaning and disposal requirements. Each Contractor shall be responsible for the protection of all surfaces and finishes at interior and exterior of building. Damaged surfaces and finishes resulting from the performance of the Work shall be repaired at no cost to the Owner by the responsible Contractor to match existing to the satisfaction of the Owner. Each Contractor shall coordinate respective cutting and patching Work with the other Prime Contracts. Each Contractor shall become completely familiar with all aspects of the Work, even those areas designated to be provided by others. This familiarization includes full and complete understanding of the Work described on all Sheets of the Drawings and in all Sections of the Project Manual. Failure by the Contractor to become completely familiar and cognizant of all aspects of the Work shall not relieve the Contractor of the responsibility to provide materials, assemblies, or services indicated in the Contract Documents.2019-004.FWP03.03.2020Flowing Well Park ImprovementsCarmel/Clay ParksCarmel/Clay Parks Flowing Well Park Improvements 5100 E 116th Street Carmel , IN 46033 2019-004.FWP G-000 VARIANCE APPROVAL Variance 20-02-07 approval to not require the building to comply with the Indiana Energy Code BUILDING ELEMENTS: Building elements are permitted to be of nonrated combustible construction [Table 601] Actual: 246 sq. ft.ALLOWABLE AREA:Tabular: 9,000 sq. ft. [Table 503] CONSTRUCTION TYPE:Type VB Construction permitted based upon allowable area [503.1] OCCUPANCY CLASSIFICATION:B Occupancy [304.1] SCOPE OF WORK:The project involves construction of a restroom building of 250 sq ft for use by people using the Flowing Well Park. Indianapolis - Marion County Fire Protection Code (MCFPC) ICC/ANSI A-117.1 Standard, 2009 Edition 2014 Indiana Mechanical Code (IMC)APPLICABLE CODE: 2014 Indiana Building Code (IBC) CODE SUMMARYSHEET INDEX Number Sheet Name 1 - General G-000 COVER SHEET 2 - Civil C-001 GENERAL NOTES & ABBREVIATIONS SV101 BOUNDARY & TOPO SURVEY CD101 SITE DEMOLITION PLAN CD102 SITE DEMOLITION PLAN CL101 SITE LAYOUT PLAN CL102 SITE LAYOUT PLAN CL501 SITE LAYOUT DETAILS CL502 SITE LAYOUT DETAILS CG101 SITE GRADING PLAN CG102 SITE GRADING PLAN CU101 SITE UTILITY PLAN CU501 SITE UTILITY DETAILS CU502 SITE UTILITY DETAILS CE101 STORMWATER POLLUTION PREVENTION PLAN CE102 STORMWATER POLLUTION PREVENTION PLAN CE501 SWPPP NOTES & DETAILS CE502 SWPPP NOTES & DETAILS 3 - Structure SF101 FOUNDATION PLAN, ROOF FRAMING PLANS & STRUCTURAL NOTES S-401 FOUNDATION & FRAMING SECTIONS & DETAILS 4 - Architectural A-001 ARCHITECTURAL GENERAL NOTES AND ABBREVIATIONS AF101 OVERALL FIRST FLOOR PLAN A-200 OVERALL ELEVATIONS A-310 WALL SECTIONS & DETAILS A-311 PERGOLA DETAILS 7 - Mechanical M-001 MECHANICAL SYMBOLS AND ABBREVIATIONS MH1A1 FIRST FLOOR HVAC PLAN 8 - Plumbing P-001 PLUMBING SYMBOLS AND ABBREVIATIONS PF1A1 FIRST FLOOR PLUMBING PLAN 9 - Electrical E-001 SYMBOLS & ABBREVIATIONS E-101 SITE, POWER, AND LIGHTING PLANS E-601 DETAILS AND SCHEDULES 01/19/21 GENERAL NOTES & ABBREVIATIONS C-001 Project Date Produced Project No. 12 3 4 5 D C B A D C B A 12 3 4 5 N These Drawings and Specifications, and all copies thereof are and shall remain the property and copyright of the Architect. They shall be used only with respect to this Project and are not to be used on any other Project or Work without prior written permission from the Architect. E 6 6 03.03.2020 2019-004.FWP Carmel Clay Parks & Recreation Flowing Well Park Improvements 5100 East 116th Street Carmel, IN 46033 ATJ 10001136REGISTERE D INDI AN A STATE OFALLENT.JACOBS ENPROFESSION AL E NGINE ERN0. # Revision Date E GENERAL UTILITY NOTES: GENERAL SITE GRADING AND DRAINAGE NOTES: ABBREVIATIONS: GENERAL EROSION CONTROL NOTES: GENERAL SITE STAKING AND LAYOUT NOTES: GENERAL TRAFFIC CONTROL NOTES: GENERAL SITE DEMOLITION NOTES: GENERAL SITE NOTES: Coordinate Reference Point Sanitary sewer structure number Storm structure number Top of curb Elevation target Match existing elevation Rim Edge of pavement Proposed contour Section reference Proposed spot elevation Note and Mark Top of curb SYMBOL LEGEND Plant note Detail reference Demolition note Plan note PROJECT LOCATION 1" = 100' Flowing Well Park 5100 East 116th Street Stonewick RunPe b b l e p o i nte Wood Creek Dr4A East 116th StreetGray RoadCreekside LnPas s Shadow Rock Circle Whisper Bay CtWindp oi nt e Pass 01/19/21 SV101BOUNDARY & TOPOGRAPHIC SURVEY 01/19/21 SANI TARY0AN HOLE : E SITE DEMOLITION PLAN CD101 Project Date Produced Project No. 12 3 4 5 D C B A D C B A 12 3 4 5 N These Drawings and Specifications, and all copies thereof are and shall remain the property and copyright of the Architect. They shall be used only with respect to this Project and are not to be used on any other Project or Work without prior written permission from the Architect. E 6 6 03.03.2020 2019-004.FWP Carmel Clay Parks & Recreation Flowing Well Park Improvements 5100 East 116th Street Carmel, IN 46033 ATJ 10001136REGISTERED INDI AN A STATE OFALLENT.JACOBS ENPROFESSIONAL E NGINE ERN0. # Revision Date E OVERALL SITE DEMOLITION PLAN 1" = 50'2B DEMOLITION NOTES DEMOLITION LEGEND DEMOLITION KEY NOTES GENERAL NOTES PR8 PROPOSAL REQUEST 008PR8 08.17.2020 PR8 PR8 PR8 01/19/21 SANITAR Y0A N HO LE : E SITE DEMOLITION PLAN CD102 Project Date Produced Project No. 12 3 4 5 D C B A D C B A 12 3 4 5 N These Drawings and Specifications, and all copies thereof are and shall remain the property and copyright of the Architect. They shall be used only with respect to this Project and are not to be used on any other Project or Work without prior written permission from the Architect. E 6 6 03.03.2020 2019-004.FWP Carmel Clay Parks & Recreation Flowing Well Park Improvements 5100 East 116th Street Carmel, IN 46033 ATJ 10001136 R E G I STERE DINDI A N A STATE OFALLEN T .JACOBS ENPROFESSIONAL E NGINE ERN0. # Revision Date E DEMOLITION NOTES DEMOLITION KEY NOTES GENERAL NOTES DEMOLITION LEGEND SITE DEMOLITION PLAN 1" = 20'2A PROPOSAL REQUEST 005PR5 06.19.2020 PR5 01/19/21 TELEPHONE 0ANHOLET SANI TARY0AN HOLE : TELEPH O NE0ANH O L ET SITE LAYOUT PLAN CL101 Project Date Produced Project No. 12 3 4 5 D C B A D C B A 12 3 4 5 N These Drawings and Specifications, and all copies thereof are and shall remain the property and copyright of the Architect. They shall be used only with respect to this Project and are not to be used on any other Project or Work without prior written permission from the Architect. E 6 6 03.03.2020 2019-004.FWP Carmel Clay Parks & Recreation Flowing Well Park Improvements 5100 East 116th Street Carmel, IN 46033 ATJ 10001136REGISTERE D INDI AN A STATE OFALLENT.JACOBS ENPROFESSION AL E NGINE ERN0. # Revision Date E OVERALL SITE LAYOUT PLAN 1" = 50'1B GRAY RD TRAILHEAD DETAIL PLAN 1" = 20'5A PROPOSAL REQUEST 002PR2 06.19.2020 PR2 PR2 PR2 PR3 PROPOSAL REQUEST 003PR3 08.17.2020 PR3 PROPOSAL REQUEST 008PR8 08.17.2020 PR8 PR8 PR8 PR8 PR8 PROPOSAL REQUEST 011PR11 09.08.2020 PR11 PR11 PR11 PR11 01/19/21 TELEPHON E0ANHO LET SANITAR Y0A N HO LE : SITE LAYOUT PLAN CL102 Project Date Produced Project No. 12 3 4 5 D C B A D C B A 12 3 4 5 N These Drawings and Specifications, and all copies thereof are and shall remain the property and copyright of the Architect. They shall be used only with respect to this Project and are not to be used on any other Project or Work without prior written permission from the Architect. E 6 6 03.03.2020 2019-004.FWP Carmel Clay Parks & Recreation Flowing Well Park Improvements 5100 East 116th Street Carmel, IN 46033 ATJ 10001136REGISTERE D INDI AN A STATE OFALLEN T .JACOBS ENPROFESSION AL E NGINE ERN0. # Revision Date E SITE LAYOUT PLAN 1" = 20' 2A PROPOSAL REQUEST 005PR5 06.19.2020 PR5 PR5 PR5 PROPOSAL REQUEST 003PR3 08.17.2020 PR3 PR9 PR3 PR8 PR8 PROPOSAL REQUEST 008PR8 08.17.2020 PROPOSAL REQUEST 009PR9 08.18.2020 PR9 PR9M:\2019\2019-004.FWP\05-Models\5.1-Sheets\5.2-C\CL101.dwg, CL102, 9/9/2020 1:17:09 PM,ajacobsen, _AutoCAD PDF (General Documentation).pc3, ARCH full bleed E1 (30.00 x 42.00 Inches), 1:1, Schmidt Associates01/19/21 01/19/21 SITE LAYOUT DETAILS CL502 Project Date Produced Project No. 12 3 4 5 D C B A D C B A 12 3 4 5 N These Drawings and Specifications, and all copies thereof are and shall remain the property and copyright of the Architect. They shall be used only with respect to this Project and are not to be used on any other Project or Work without prior written permission from the Architect. E 6 6 03.03.2020 2019-004.FWP Carmel Clay Parks & Recreation Flowing Well Park Improvements 5100 East 116th Street Carmel, IN 46033 ATJ 10001136REGISTERE D INDI AN A STATE OFALLEN T .JACOBS ENPROFESSION AL E NGINE ERN0. # Revision Date E 3A 2D 1D 1A 5B 5A A3 ADDENDUM 3 04.01.2020 A3 5C 3D M:\2019\2019-004.FWP\05-Models\5.1-Sheets\5.2-C\CL501.dwg, CL502, 9/9/2020 1:17:34 PM,ajacobsen, _AutoCAD PDF (General Documentation).pc3, ARCH full bleed E1 (30.00 x 42.00 Inches), 1:1, Schmidt Associates01/19/21 TELEPHONE 0ANHOLET SANI TARY0AN HOLE TELEPH O NE0ANH O L ET SITE GRADING PLAN CG101 Project Date Produced Project No. 12 3 4 5 D C B A D C B A 12 3 4 5 N These Drawings and Specifications, and all copies thereof are and shall remain the property and copyright of the Architect. They shall be used only with respect to this Project and are not to be used on any other Project or Work without prior written permission from the Architect. E 6 6 03.03.2020 2019-004.FWP Carmel Clay Parks & Recreation Flowing Well Park Improvements 5100 East 116th Street Carmel, IN 46033 ATJ 10001136REGISTERE D INDI AN A STATE OFALLENT.JACOBS ENPROFESSION AL E NGINE ERN0. # Revision Date E OVERALL SITE GRADING PLAN 1" = 50'1B 828 GRAY RD TRAILHEAD GRADING PLAN 1" = 20'5A PR11 PROPOSAL REQUEST 011 09.08.2020 PR11 PR11 M:\2019\2019-004.FWP\05-Models\5.1-Sheets\5.2-C\CG101.dwg, CG101, 9/9/2020 1:17:53 PM,ajacobsen, _AutoCAD PDF (General Documentation).pc3, ARCH full bleed E1 (30.00 x 42.00 Inches), 1:1, Schmidt Associates01/19/21 TELEPHON E0ANHO LET SANITAR Y0A N HO LE SITE GRADING PLAN CG102 Project Date Produced Project No. 12 3 4 5 D C B A D C B A 12 3 4 5 N These Drawings and Specifications, and all copies thereof are and shall remain the property and copyright of the Architect. They shall be used only with respect to this Project and are not to be used on any other Project or Work without prior written permission from the Architect. E 6 6 03.03.2020 2019-004.FWP Carmel Clay Parks & Recreation Flowing Well Park Improvements 5100 East 116th Street Carmel, IN 46033 ATJ 10001136REGISTERE D INDI AN A STATE OFALLEN T .JACOBS ENPROFESSION AL E NGINE ERN0. # Revision Date E SITE GRADING PLAN 1" = 20'2A 828M:\2019\2019-004.FWP\05-Models\5.1-Sheets\5.2-C\CG101.dwg, CG102, 9/9/2020 1:17:59 PM,ajacobsen, _AutoCAD PDF (General Documentation).pc3, ARCH full bleed E1 (30.00 x 42.00 Inches), 1:1, Schmidt Associates01/19/21 UNISEX RESTROOM 101 UNISEX RESTROOM102 CUSTODIAL 103 1' - 5" 4' - 8"2' - 9" 3' - 4"0' - 11"0' - 11" 3' - 4" 2' - 9"1' - 4" 8' - 6"20' - 10"7' - 0" 7' - 0"SITE UTILITY PLAN CU101 Project Date Produced Project No. 12 3 4 5 D C B A D C B A 12 3 4 5 N These Drawings and Specifications, and all copies thereof are and shall remain the property and copyright of the Architect. They shall be used only with respect to this Project and are not to be used on any other Project or Work without prior written permission from the Architect. E 6 6 03.03.2020 2019-004.FWP Carmel Clay Parks & Recreation Flowing Well Park Improvements 5100 East 116th Street Carmel, IN 46033 ATJ 10001136REGISTERE D INDI AN A STATE OFALLEN T .JACOBS ENPROFESSION AL E NGINE ERN0. # Revision Date E SITE UTILITY PLAN 1" = 20'2B GENERAL UTILITY NOTES NORTH DRAINAGE IMPROVEMENTS 1" = 20' 4A PROPOSAL REQUEST 003PR3 08.17.2020 PR3 PR3 M:\2019\2019-004.FWP\05-Models\5.1-Sheets\5.2-C\CU101.dwg, CU101, 9/9/2020 1:18:11 PM,ajacobsen, _AutoCAD PDF (General Documentation).pc3, ARCH full bleed E1 (30.00 x 42.00 Inches), 1:1, Schmidt Associates01/19/21 SITE UTILITY DETAILS CU501 Project Date Produced Project No. 12 3 4 5 D C B A D C B A 12 3 4 5 N These Drawings and Specifications, and all copies thereof are and shall remain the property and copyright of the Architect. They shall be used only with respect to this Project and are not to be used on any other Project or Work without prior written permission from the Architect. E 6 6 03.03.2020 2019-004.FWP Carmel Clay Parks & Recreation Flowing Well Park Improvements 5100 East 116th Street Carmel, IN 46033 ATJ 10001136REGISTERE D INDI AN A STATE OFALLEN T .JACOBS ENPROFESSION AL E NGINE ERN0. # Revision Date E 1A 1C 1D 3A 3B 2C 3C 2D 3D 5A 5B 5D M:\2019\2019-004.FWP\05-Models\5.1-Sheets\5.2-C\CU501.dwg, CU501, 9/9/2020 1:18:28 PM,ajacobsen, _AutoCAD PDF (General Documentation).pc3, ARCH full bleed E1 (30.00 x 42.00 Inches), 1:1, Schmidt Associates01/19/21 SITE UTILITY DETAILS CU502 Project Date Produced Project No. 12 3 4 5 D C B A D C B A 12 3 4 5 N These Drawings and Specifications, and all copies thereof are and shall remain the property and copyright of the Architect. They shall be used only with respect to this Project and are not to be used on any other Project or Work without prior written permission from the Architect. E 6 6 03.03.2020 2019-004.FWP Carmel Clay Parks & Recreation Flowing Well Park Improvements 5100 East 116th Street Carmel, IN 46033 ATJ 10001136REGISTERE D INDI AN A STATE OFALLEN T .JACOBS ENPROFESSION AL E NGINE ERN0. # Revision Date E 1A3A M:\2019\2019-004.FWP\05-Models\5.1-Sheets\5.2-C\CU501.dwg, CU502, 9/9/2020 1:18:33 PM,ajacobsen, _AutoCAD PDF (General Documentation).pc3, ARCH full bleed E1 (30.00 x 42.00 Inches), 1:1, Schmidt Associates01/19/21 SANI TARY0AN HOLE : CW SF SF VF LS LS BB BB BB BB BB LS LS BB BB BB BB BB SCSC SC AR AR AR AR AR AR AR AR AR AR AR AR PD VF VF VF VF VF VF VF VF VF VF VF VF VF VF VF VF VF VF VF VF VF VF VF VF VF VF VF VF VF BB FB VF VF VF SE SE STORMWATER POLLUTION PREVENTION PLAN CE101 Project Date Produced Project No. 12 3 4 5 D C B A D C B A 12 3 4 5 N These Drawings and Specifications, and all copies thereof are and shall remain the property and copyright of the Architect. They shall be used only with respect to this Project and are not to be used on any other Project or Work without prior written permission from the Architect. E 6 6 03.03.2020 2019-004.FWP Carmel Clay Parks & Recreation Flowing Well Park Improvements 5100 East 116th Street Carmel, IN 46033 ATJ 10001136REGISTERE D INDI AN A STATE OFALLEN T .JACOBS ENPROFESSION AL E NGINE ERN0. # Revision Date E OVERALL SWPPP PLAN 1" = 50'1B GRAY RD TRAILHEAD SWPP PLAN 1" = 20'5A SS SF CW SE VF FB LS AR SC PD BB PR11 PROPOSAL REQUEST 011 09.08.2020 PR11 PR11 PR11M:\2019\2019-004.FWP\05-Models\5.1-Sheets\5.2-C\CE101.dwg, CE101, 9/9/2020 1:18:46 PM,ajacobsen, _AutoCAD PDF (General Documentation).pc3, ARCH full bleed E1 (30.00 x 42.00 Inches), 1:1, Schmidt Associates01/19/21 SANITAR Y0A N HO LE : SS SS SF SS CW SE SE SE SE SE SE SE SE SE SE SE SE SE FB SE SE SE SE AR AR AR AR SC PD PD PD VF VF VF VF VF VF VF VF VF VF VF VF VF VF FB FB FB SE SE STORMWATER POLLUTION PREVENTION PLAN CE102 Project Date Produced Project No. 12 3 4 5 D C B A D C B A 12 3 4 5 N These Drawings and Specifications, and all copies thereof are and shall remain the property and copyright of the Architect. They shall be used only with respect to this Project and are not to be used on any other Project or Work without prior written permission from the Architect. E 6 6 03.03.2020 2019-004.FWP Carmel Clay Parks & Recreation Flowing Well Park Improvements 5100 East 116th Street Carmel, IN 46033 ATJ 10001136REGISTERE D INDI AN A STATE OFALLEN T .JACOBS ENPROFESSION AL E NGINE ERN0. # Revision Date E SWPP PLAN 1" = 20'2A SS SF CW SE VF FB LS AR SC PD BBM:\2019\2019-004.FWP\05-Models\5.1-Sheets\5.2-C\CE101.dwg, CE102, 9/9/2020 1:18:54 PM,ajacobsen, _AutoCAD PDF (General Documentation).pc3, ARCH full bleed E1 (30.00 x 42.00 Inches), 1:1, Schmidt Associates01/19/21 SWPPP NOTES & DETAILS CE501 Project Date Produced Project No. 12 3 4 5 D C B A D C B A 12 3 4 5 N These Drawings and Specifications, and all copies thereof are and shall remain the property and copyright of the Architect. They shall be used only with respect to this Project and are not to be used on any other Project or Work without prior written permission from the Architect. E 6 6 03.03.2020 2019-004.FWP Carmel Clay Parks & Recreation Flowing Well Park Improvements 5100 East 116th Street Carmel, IN 46033 ATJ 10001136REGISTERE D INDI AN A STATE OFALLEN T .JACOBS ENPROFESSION AL E NGINE ERN0. # Revision Date E STORMWATER POLLUTION PREVENTION PLAN STORMWATER POLLUTION PREVENTION PLAN- POST CONSTRUCTION COMPONENT “ ” RULE 5 CHECKLIST INFORMATION CONSTRUCTION PLAN ELEMENTS SEEDING SCHEDULE AND NOTES EROSION CONTROL CONTROL MEASURE MAINTENANCE INSTALLATION SEQUENCE EROSION CONTROL SEQUENCING & MAINTENANCE M:\2019\2019-004.FWP\05-Models\5.1-Sheets\5.2-C\CE501.dwg, CE501, 9/9/2020 1:19:06 PM,ajacobsen, _AutoCAD PDF (General Documentation).pc3, ARCH full bleed E1 (30.00 x 42.00 Inches), 1:1, Schmidt Associates01/19/21 SWPPP NOTES & DETAILS CE502 Project Date Produced Project No. 12 3 4 5 D C B A D C B A 12 3 4 5 N These Drawings and Specifications, and all copies thereof are and shall remain the property and copyright of the Architect. They shall be used only with respect to this Project and are not to be used on any other Project or Work without prior written permission from the Architect. E 6 6 03.03.2020 2019-004.FWP Carmel Clay Parks & Recreation Flowing Well Park Improvements 5100 East 116th Street Carmel, IN 46033 ATJ 10001136REGISTERE D INDI AN A STATE OFALLEN T .JACOBS ENPROFESSION AL E NGINE ERN0. # Revision Date E 1A 1B 1C 1D 2A 2B 4A 2C M:\2019\2019-004.FWP\05-Models\5.1-Sheets\5.2-C\CE501.dwg, CE502, 9/9/2020 1:19:09 PM,ajacobsen, _AutoCAD PDF (General Documentation).pc3, ARCH full bleed E1 (30.00 x 42.00 Inches), 1:1, Schmidt Associates01/19/21