Loading...
HomeMy WebLinkAboutEngineering Cover Letter-03-06-19 160 West Carmel Drive, Suite 240 Carmel, IN 46032 Phone: 317-810-1677 Fax: 317-810-1679 March 6, 2019 Mr. Alex Jordan City of Carmel Engineering Department One Civic Square Carmel, IN 46032 Phone: 317-571-2305 Subject: Freddy’s Frozen Custard & Steakburgers Docket No. 18100012 DP / ADLS 9701/9703 North Michigan Road Dear Mr. Jordan, Please find attached final Construction Plans and administrative items. Per the approval e-mail received via ProjectDox on February 21, 2019 we have attached the following: 1. 9 final plan sets and one digital copy.  Please find attached nine (9) final sets of Construction Plans along with a CD containing digital files. 2. A signed Stormwater Management Permit Application.  Please find attached a signed Stormwater Management Permit Application along with a CD containing a digital copy. 3. A signed and recorded O&M manual and a digital copy.  Please find attached a signed and recorded copy of the O&M Manual along with a CD containing digital files. 4. One digital set submitted to Steve Cook with Carmel Utilities.  We have submitted a digital set of plans to Steve via e-mail as requested. Please find attached copy of transmittal e-mail. 5. Erosion control engineers estimate.  The erosion control estimate was previously submitted and approved. 6. Erosion control performance bond in amount of approved estimate once it is approved.  Please find attached erosion control performance bond. 7. A right-of-way improvement engineers estimate.  The right-of-way improvements estimate was previously submitted and approved. Mr. Alex Jordan City of Carmel March 6, 2019 Page 2 of 2 8. A right-of-way performance bond in amount of approved estimate.  Please find attached right-of-way improvement performance bond. 9. A BMP easement agreement with legal description and easement exhibit.  This property is being platted; therefore, the Perpetual Stormwater Quality Easement has been depicted on the Secondary Plat which is to be recorded. 10. Right-of-way Permit application and $5,000 license and permit bond.  Accel Construction, LLC is the general contractor for this project and they should be in the process of obtaining the required Right-of-Way Permit, if it has not already been obtained. 11. Applicable Utility fees have been paid.  The applicable utility fees have already been paid as requested. 12. Drainage approval from Crossroad Engineers.  Drainage approval from Crossroad Engineers was previously obtained via ProjectDox. I hope the above addresses your concerns and we look forward to receiving final approval for the project. Thank you. Sincerely, Civil Site Group, Inc. Eric A. Gleissner, P.E. Principal Attachments: CD Containing Digital Files Nine (9) Sets of Final Construction Plans Signed Stormwater Management Permit Application Signed and recorded copy of the O&M Manual Transmittal e-mail to Steve Cook Erosion Control Performance Bond Right-of-Way Performance Bond