HomeMy WebLinkAboutThoroughfare EstimateHampstead GardensCarmel Thoroughfare Payment EstimateAs of 8/23/2019Total number of lots = 12Unit quan unit priceCost PerResidential Collector (/sy) ($/sy) costLot3.0 in. of Asphalt Base (Type C) SYS 720 $10.60 $7,630.002.5 in. of Asphalt Intermediate (Type C) SYS 720 $7.90 $5,690.003.5 in. of Asphalt Base (Type C) SYS 720 $10.60 $7,630.002.5 in. of Asphalt Intermediate (Type C) SYS 720 $7.90 $5,690.001.5 in. of Surface Coat (Type C) SYS 720 $6.50 $4,680.00 Asphalt Sub-Total$31,320.00Auxiliary Lane and Decel Taper (CREDIT)3.0 in. of Asphalt Base (Type C) SYS 586 $10.60 -$6,210.002.5 in. of Asphalt Intermediate (Type C) SYS 586 $7.90 -$4,630.003.5 in. of Asphalt Base (Type C) SYS 586 $10.60 -$6,210.002.5 in. of Asphalt Intermediate (Type C) SYS 586 $7.90 -$4,630.001.5 in. of Surface Coat (Type C) SYS 586 $6.50 -$3,810.00 Asphalt Sub-TotalCredit-$25,490.00Multi-use PathSF NA - credit during constructionCreditChairback Curb LF 645 $14.50 $9,350.006" SSD Under Curb LF 645 $9.25 $5,970.00EngineeringLS 1 $1,500.00 $1,500.00Total$16,820.00 Total Cost$22,650.001,900$ Towne Road