HomeMy WebLinkAbout2018.02759.CE.C710.LD-C7104"12"CULTIVATED SOIL
UNDISTURBED SOIL
NOTE: BREAK THROUGH ANY EXISTING "HARD-PAN" AND
REMOVE AS NECESSARY TO PROVIDE GOOD PERCOLATION
AND POSITIVE DRAINAGE.
12" U.N.O.
SLOPE
3" MULCH LAYER (SEE GENERAL NOTES)
GROUNDCOVER (PER PLAN)
PLANTING SOIL MIX (SEE GENERAL NOTES)
SPADE EDGE
PLANTING PROCEDURE
1. LAYOUT BED AND OUTLINE WITH SPADE EDGE. PLACE SOIL FROM SPADE EDGE WITHIN BED.
2. ROTOTILL BED TO 12" DEPTH. SPREAD 4" MIN. LAYER OF PLANTING SOIL MIX OVER BED. ROTOTILL
PLANTING SOIL MIX INTO TOP OF BED.
3. INSTALL PLANTS, MULCH AND WATER THOROUGHLY. DO NOT ALLOW AIR POCKETS TO FORM WHEN
BACKFILLING.
FINISH GRADE
ROW SPACING
MULCH
(SEE GENERAL NOTES)
2
1
VERTICAL EDGE
4"3"
NOTE:
SPADE EDGE SHALL CREATE A
CLEAN SEPARATION BETWEEN
AREAS; AND SHALL CREATE
SMOOTH & EVEN LINES (AS
INDICATED ON THE PLANS)
NOTE:
SPADE EDGE DETAIL
SHALL BE USED AT ALL
LAWN EDGES & AT EDGES
OF MULCHED AREAS (FOR
CONTAINMENT)
LAWN AREA PLANTING OR MULCHED AREA
EXISTING GRADE OR
GRADE OF PLANTING AREA
EQ
2' MIN.EQ
SEE
SCHEDULE
TYPICAL PARKING LOT TREE TO BE CENTERED IN PLANTING
ISLANDS; SEE TREE PLANTING DETAILS, THIS SHEET
2' MIN.
ALL SHRUBS AND PERENNIALS ARE TO MAINTAIN
A MINIMUM DISTANCE OF 24" FROM ALL CURBS
SEE PLANTING DETAILS, THIS SHEET.
ALL SHRUBS ARE TO BE PLANTED A
MINIMUM DISTANCE OF 24" FROM
ALL PARKING LOT CURBING.
HARDWOOD BARK MULCH AND
SPADE EDGE PER GENERAL NOTES
AND DETAILS, THIS SHEET
NOTES:
1.ALL AGGREGATE AND COMPACTED STONE IS TO BE REMOVED TO 24" DEPTH
BELOW FINISHED GRADE TO ALLOW PROPER PLANTING CONDITIONS.
2.HARDPAN SOIL IS TO BE BROKEN UP TO ALLOW WATER TO DRAIN PROPERLY.
3.ALL PARKING LOT ISLANDS ARE TO MAINTAIN A MINIMUM OF 24" TOPSOIL FILL
4.ALL PLANTINGS ARE TO BE SPACED ACCORDING TO PLANT SCHEDULES AND
ARE TO MAINTAIN A MINIMUM OF 24" FROM ALL CURBS.
PARKING ISLAND TREES ARE TO BE
INSTALLED WITHIN BACK THIRD OF ALL
PARKING STALLS FOR IMPROVED VISIBILITY
PLOT DATE: 10/7/2019 4:37 PMPLOT SCALE: 1:2.5849EDIT DATE: 6/14/2019EDITED BY: NHORGANDRAWING FILE: P:\2018\02759\D. Drawings\Civil\Construction Documents\2018.02759.CE.C710.LD.dwg9025 River Road, Suite 200 | Indianapolis, Indiana 46240
TEL 317.547.5580 | FAX 317.543.0270
www.structurepoint.com
Project Number
CERTIFIED BY
ISSUANCE INDEX
DATE:
PROJECT PHASE:
REVISION SCHEDULE
NO.DESCRIPTION DATE
04/17/2019
DP/ADLS
2018.02759
INDIANAPOLIS
REHABILITATION
HOSPITAL
1260 CITY CENTER DRIVE
CARMEL, INDIANA 46032
WB DEVELOPMENT PARTNERS
4441 W AIRPORT FREEWAY
SUITE 330
IRVING, TEXAS 75062
PHONE: (214) 699-5137
C710
LANDSCAPE
DETAILS
SHRUB PLANTING DETAIL02
C710 SCALE: NTS
PERENNIAL PLANTING DETAIL03
C710 SCALE: NTS
SPADE EDGE DETAIL04
C710 SCALE: NTS
PARKING LOT PLANTING DETAIL05
C710 SCALE: NTS
TREE PLANTING DETAIL01
C710 SCALE: NTS
TREE PRESERVATION DETAIL06
C710 SCALE: NTS