Loading...
HomeMy WebLinkAbout2018.02759.CE.C710.LD-C7104"12"CULTIVATED SOIL UNDISTURBED SOIL NOTE: BREAK THROUGH ANY EXISTING "HARD-PAN" AND REMOVE AS NECESSARY TO PROVIDE GOOD PERCOLATION AND POSITIVE DRAINAGE. 12" U.N.O. SLOPE 3" MULCH LAYER (SEE GENERAL NOTES) GROUNDCOVER (PER PLAN) PLANTING SOIL MIX (SEE GENERAL NOTES) SPADE EDGE PLANTING PROCEDURE 1. LAYOUT BED AND OUTLINE WITH SPADE EDGE. PLACE SOIL FROM SPADE EDGE WITHIN BED. 2. ROTOTILL BED TO 12" DEPTH. SPREAD 4" MIN. LAYER OF PLANTING SOIL MIX OVER BED. ROTOTILL PLANTING SOIL MIX INTO TOP OF BED. 3. INSTALL PLANTS, MULCH AND WATER THOROUGHLY. DO NOT ALLOW AIR POCKETS TO FORM WHEN BACKFILLING. FINISH GRADE ROW SPACING MULCH (SEE GENERAL NOTES) 2 1 VERTICAL EDGE 4"3" NOTE: SPADE EDGE SHALL CREATE A CLEAN SEPARATION BETWEEN AREAS; AND SHALL CREATE SMOOTH & EVEN LINES (AS INDICATED ON THE PLANS) NOTE: SPADE EDGE DETAIL SHALL BE USED AT ALL LAWN EDGES & AT EDGES OF MULCHED AREAS (FOR CONTAINMENT) LAWN AREA PLANTING OR MULCHED AREA EXISTING GRADE OR GRADE OF PLANTING AREA EQ 2' MIN.EQ SEE SCHEDULE TYPICAL PARKING LOT TREE TO BE CENTERED IN PLANTING ISLANDS; SEE TREE PLANTING DETAILS, THIS SHEET 2' MIN. ALL SHRUBS AND PERENNIALS ARE TO MAINTAIN A MINIMUM DISTANCE OF 24" FROM ALL CURBS SEE PLANTING DETAILS, THIS SHEET. ALL SHRUBS ARE TO BE PLANTED A MINIMUM DISTANCE OF 24" FROM ALL PARKING LOT CURBING. HARDWOOD BARK MULCH AND SPADE EDGE PER GENERAL NOTES AND DETAILS, THIS SHEET NOTES: 1.ALL AGGREGATE AND COMPACTED STONE IS TO BE REMOVED TO 24" DEPTH BELOW FINISHED GRADE TO ALLOW PROPER PLANTING CONDITIONS. 2.HARDPAN SOIL IS TO BE BROKEN UP TO ALLOW WATER TO DRAIN PROPERLY. 3.ALL PARKING LOT ISLANDS ARE TO MAINTAIN A MINIMUM OF 24" TOPSOIL FILL 4.ALL PLANTINGS ARE TO BE SPACED ACCORDING TO PLANT SCHEDULES AND ARE TO MAINTAIN A MINIMUM OF 24" FROM ALL CURBS. PARKING ISLAND TREES ARE TO BE INSTALLED WITHIN BACK THIRD OF ALL PARKING STALLS FOR IMPROVED VISIBILITY PLOT DATE: 10/7/2019 4:37 PMPLOT SCALE: 1:2.5849EDIT DATE: 6/14/2019EDITED BY: NHORGANDRAWING FILE: P:\2018\02759\D. Drawings\Civil\Construction Documents\2018.02759.CE.C710.LD.dwg9025 River Road, Suite 200 | Indianapolis, Indiana 46240 TEL 317.547.5580 | FAX 317.543.0270 www.structurepoint.com Project Number CERTIFIED BY ISSUANCE INDEX DATE: PROJECT PHASE: REVISION SCHEDULE NO.DESCRIPTION DATE 04/17/2019 DP/ADLS 2018.02759 INDIANAPOLIS REHABILITATION HOSPITAL 1260 CITY CENTER DRIVE CARMEL, INDIANA 46032 WB DEVELOPMENT PARTNERS 4441 W AIRPORT FREEWAY SUITE 330 IRVING, TEXAS 75062 PHONE: (214) 699-5137 C710 LANDSCAPE DETAILS SHRUB PLANTING DETAIL02 C710 SCALE: NTS PERENNIAL PLANTING DETAIL03 C710 SCALE: NTS SPADE EDGE DETAIL04 C710 SCALE: NTS PARKING LOT PLANTING DETAIL05 C710 SCALE: NTS TREE PLANTING DETAIL01 C710 SCALE: NTS TREE PRESERVATION DETAIL06 C710 SCALE: NTS