HomeMy WebLinkAboutC400 MAINTENANCE OF TRAFFIC PLANSTMST
M
STM
WWWWWWWWWWWWWWWWCCCCCCCCCCCCCCGGGN85°42'37"E (R)N55°31'24"E (R)N43°33'22"E (R)R=795.00'L 422.02'N56°19'19"E 66.08' (M)N48°10'22"E 110.00' (M)N36°15'44"E 50.04' (M)N05°40'17"E (R)N19°53'02"W 166.73' (M)N46°57'09"
W
9
8
.
6
3
'
(
M
)
N43°34'08"W
9
6
.
5
4
'
(
M
)S53°43'25"W 266.26' (M)S35°18'47"E 36.27' (M)N86°30'32"E 36.58' (M)N44°21'17"E 54.09' (M)S52°55'30"W (R)N47°22'27"E (R)N35°27'49"E (R)N06°28'12"E 31.36' (M)N20°40'57"W (R)N47°45'04"
W
(
R
)
N44°22'03"W
(
R
)S36°06'42"E (R)S18°40'04"E (R)S17°52'15"E 119.53' (M)=WWWWWWWWPROPOSED BUILDIN
G
GFA=31,808 SF
FFF=889.40
M.F.P.G.=887.13
M.L.A.G.=888.40
111423238149358410C
CC C
CCCCCCCCE
EWWWWWSTM STM
STMSTMSTMSTMSTMSTMSTMSTMSTMSTME
EEEEEEEROAD
WORK
100 FT
POSTED
SPEED
LIMIT
35
ROADCONS
T
R
U
C
T
I
O
N
AHEA
D
ROAD
WOR
K
100 FT
ROAD
CONSTRUCTION
AHEAD
END
ROAD WORK
END
ROAD WORK
C400MAINTENANCE OF TRAFFIC PLANPHASE ONE
MAINTENANCE OF TRAFFIC PLAN
MAINTENANCE OF TRAFFIC NOTES
1.DURING THE COURSE OF CONSTRUCTION, ONE LANE REDUCTION WILL BE ALLOWED BETWEEN THE HOURS OF
9am. AND 4pm. CONSTRUCTION MUST BE COMPLETE WITHIN THE PROVISIONS OF THE PERMIT AND THE LANE
MUST BE REOPENED AT THE END OF EACH DAY THAT IT IS CLOSED.
2.THE BARRICADES SHALL BE MOVED TO THE EDGE OF PAVEMENT AT TIMES OF NO CONSTRUCTION TO ALLOW
FOR UNOBSTRUCTED TRAFFIC FLOW THROUGH THE CONSTRUCTION AREA. MAINTAIN MINIMUM 10' LANE WIDTH
BETWEEN BARRICADES AND ADJACENT LANE STRIPING.
3.FENCING, BARRICADES AND/OR APPROPRIATELY SIZED STEEL PLATES SHALL BE PLACED SO AS TO
ENCOMPASS ANY EXPOSED TRENCH AREA AT TIMES OF NO CONSTRUCTION.
4.THE ADVANCED WARNING SIGNS SHALL ALSO BE COVERED OR TURNED AWAY FROM THE ROADWAY AT TIMES
OF NO CONSTRUCTION.
5.THE MAINTENANCE OF TRAFFIC SHALL CONFORM TO THE STANDARD SPECIFICATIONS OF THE INDIANA
DEPARTMENT OF TRANSPORTATION STANDARD DETOUR SHEETS AND THE INDIANA MANUAL ON UNIFORM
TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS DATED 2011 AND ALL SUBSEQUENT REVISIONS.
6.ANY DROP OFF ADJACENT TO THE TRAVEL LANE WHICH EXCEEDS 4" MUST HAVE TYPE II DRUMS WITH TYPE 'A'
FLASHERS SPACED AS NOTED.
7.ALL STAGING AND EQUIPMENT STORAGE WILL OCCUR OFF ROAD AND ON THE WORK SITE.
8.THE APPROVED PERMIT AND PLANS SHALL BE ONSITE DURING CONSTRUCTION.
9.ALL PAVEMENT MARKINGS WITHIN INDOT AND/OR CITY/COUNTY RIGHT-OF-WAY TO BE IN ACCORDANCE WITH
THE INDIANA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS DATED 2011
AND ALL SUBSEQUENT REVISIONS.
10.CONTRACTOR TO NOTIFY AUTHORITY HAVING JURISDICTION 5 DAYS PRIOR TO THE START OF WORK AND
WITHIN 7 DAYS OF COMPLETION OF WORK.REVISIONS AND ISSUESPart of the NE/4 of Section 7, Township 17 North, Range 3 East, Clay Township, Hamilton County, IndianaW18.0330PREPARED FOR:10255 COMMERCE DRIVEPROJECT NO.
SHEET NO.CHECKED BY:DRAWN BY:MLTDESIGNED BY:DWG NAME:PROJECT NO.:W18.0330DATEBY03.31.2019MLTDATE:RLWKnow what's below.
before you dig.Call
R LINK OFFICE SUITESSUBMITTAL TO CARMEL ADLS/DP09.21.2018MLTSTEVEN SCOTT RUCKER P.E. 11300279ENGINEERS317 | 846 - 6611800 | 452 - 6408317 | 843 - 0546 faxWEIHELand Surveying | Civil EngineeringLandscape ArchitectureALLAN H. WEIHE, P.E., L.S. - FOUNDER10505 N. College AvenueIndianapolis, Indiana 46280weihe.netBuild with confidence.SMREVISED FOR TAC COMMENTS11.21.2018MLTREVISED FOR TAC COMMENTS12.05.2018MLTREVISED FOR TAC COMMENTS01.02.2019RLWREVISED FOR TAC COMMENTS01.08.2019RLWREVISED SANITARY SEWER LATERAL03.13.2019RLWFINAL CONSTRUCTION PLANS03.31.2019RLW03.31.2019
W SNELEGEND
DRUM TYPE BARRICADES (ACCORDING TO
LOCAL D.O.T. SPEC) SPACED AS NOTED.
ADVANCED WARNING SIGN
WORK AREA