HomeMy WebLinkAboutC800 UTILITY PLANSTM
STMST
M
WWWWWWWWWWWWWWWWCCCCCCCCCCCCCCGGGW
W
W
W
W
W
W
WPROPOSED BU
ILD
INGGFA=31,808
SFFFF=889.40M.F
.P
.G
.=887
.13M.L
.A
.G
.=888
.40CCCCCCCCCCCCEEW
W
W
W
WSTMSTM
STM
STMSTMSTMSTMSTMSTM
STM
STM
STM
POND
N.P. = 883.00
100 YR. = 887.13
T.O.B. = 887.13
POND
N.P. = 879.00
100 YR. = 883.67
T.O.B. = 888.67
D DDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDD D
D DD
DDDD
D
D
D
D
D DDDD DDDDDEEEEEEEECONTRACTOR TO INVESTIGATE PIPE TO
DETERMINE THE EXTENTS. PIPE TO BE
REMOVED IF DRAINING ON SITE WATER. PIPE
TO BE TIED INTO STORM SYSTEM IF
DRAINING OFF-SITE WATER. NO PIPES TO
RUN UNDER PROPOSED BUILDING.
W
W
W
W
WWC
CCCCEEEEW
W
W
W WWSTMSTMSTMSTMSTMGENERAL UTILITY NOTES
1.THE CONTRACTOR SHALL CONTACT APPLICABLE STATE UNDERGROUND
LOCATION SERVICE AT LEAST 72 HOURS PRIOR TO ANY WORK AND SHALL
CONTACT THE OWNER AND/OR ENGINEER SHOULD UTILITIES APPEAR TO BE IN
CONFLICT WITH THE PROPOSED IMPROVEMENTS. IT SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES
WHICH CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS.
2.THE PLANS SHOW THE LOCATION OF ALL KNOWN UTILITIES LOCATED WITHIN THE
LIMITS OF CONSTRUCTION ACCORDING TO INFORMATION PROVIDED BY THE
VARIOUS UTILITY COMPANIES, PREVIOUS CONSTRUCTION PLANS AND AS
EVIDENCED BY OBSERVATION OF ABOVE GROUND CONDITIONS BY THE
SURVEYOR. THE ACCURACY OF THIS INFORMATION IS NOT GUARANTEED.
3.THE CONTRACTOR SHALL CONTACT ALL UTILITY COMPANIES TO LOCATE MAINS,
CONDUITS, SERVICE LINES, ETC. WITHIN THE CONSTRUCTION LIMITS. THE
LOCATION AND PROTECTION OF UTILITY STRUCTURES, THEIR SUPPORT AND
MAINTENANCE DURING CONSTRUCTION (IN COOPERATION WITH APPLICABLE
UTILITY COMPANY) IS THE EXPRESSED RESPONSIBILITY OF THE CONTRACTOR.
4.THE CONTRACTOR SHALL CONTACT ALL APPLICABLE UTILITIES AND VERIFY ANY
AND ALL FEES ASSOCIATED WITH THE INSTALLATION OF ALL UTILITIES.
5.ALL CONSTRUCTION ON THIS SITE TO BE PERFORMED IN COMPLIANCE WITH
O.S.H.A. STANDARDS FOR WORKER SAFETY.
6.ANY PART OF SANITARY OR STORM SEWER TRENCHES RUNNING UNDER OR
WITHIN 5' OF PAVEMENT TO BE BACKFILLED WITH GRANULAR MATERIAL.
7.IT IS THE CONTRACTORS RESPONSIBILITY TO VERIFY LOCATION, SIZE, AND
ELEVATION OF EXISTING UTILITIES, STRUCTURES, PIPES, PAVEMENTS, ETC. AS
RELATED TO THEIR WORK. NOTIFY ENGINEER OF ANY CONFLICT AND/OR
DISCREPANCIES IN THE CONSTRUCTION DOCUMENTS.
8.MAINTAIN 10' HORIZONTAL AND 18" VERTICAL CLEARANCE BETWEEN STORM /
SANITARY SEWER SYSTEMS AND DOMESTIC/FIRE LINE SERVICE. SANITARY
SEWER LINE IN PROXIMITY OF WATER LINE SHALL BE C900 WATER MAIN GRADE
PVC.
9.CONTRACTOR TO INSTALL CONCRETE CRADLES WHEN THE VERTICAL
SEPARATION (AS MEASURED FROM THE EXTERIOR OF THE PIPES) BETWEEN
SANITARY SEWERS, WATER MAINS AND STORM SEWERS IS 18" OR LESS.
10.IF ANY EXISTING STRUCTURES TO REMAIN ARE DAMAGED DURING
CONSTRUCTION, IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO REPAIR
AND/OR REPLACE THE EXISTING STRUCTURE AS NECESSARY TO RETURN IT TO
EXISTING CONDITIONS OR BETTER.
11.WHEN PERFORMING EXCAVATIONS DURING PERIODS OF WET WEATHER,
PROVIDE ADEQUATE DEWATERING, DRAINAGE AND GROUND WATER
MANAGEMENT TO CONTROL MOISTURE OF SOILS.
12.COMPACTED "B" BORROW BACK FILL REQUIRED OVER ALL UTILITIES IN PAVED
AREAS.
13.ALL UTILITY STRUCTURES IN PAVED AREAS SHALL BE FLUSH WITH PAVEMENT
AND SHALL HAVE TRAFFIC BEARING RING AND COVERS.
14.PROVIDE THRUST BLOCKS FOR ALL WATER LINE BENDS AND TEES, INCLUDING
TAP CONNECTION.
15.CONTRACTOR SHALL COORDINATE WITH WATER COMPANY FOR DOMESTIC AND
FIRE SERVICE. CONNECT TO BUILDING DOMESTIC AND FIRE LINE. COORDINATE
WITH PLUMBING DRAWINGS.
16.COORDINATE LOCATION OF ELECTRICAL AND COMMUNICATION LINES WITH
LOCAL UTILITIES.
17.COORDINATE LOCATION OF REQUIRED CONDUITS FOR ELECTRIC SERVICE, LIGHT
POLES, COMMUNICATION SERVICE AND IRRIGATION SYSTEM.
18.COORDINATE LOCATION AND SIZE OF GAS SERVICE CONNECTION AND
INSTALLATION OF SERVICE LINE AND METER WITH GAS COMPANY.
19.COORDINATE LOCATIONS AND CONNECTIONS OF BUILDING STORM LINES WITH
PLUMBING DRAWINGS.
20.FOLLOW ALL LOCAL AND STATE CODES IN REFERENCE TO DOMESTIC/FIRE LINE
INSTALLATION AND STORM SEWER / SANITARY SEWER INSTALLATION.
21.SANITARY SEWER LATERAL, WATER SERVICE, & ELECTRICAL/COMMUNICATION
CONDUITS SHALL BE GRANULAR BACKFILL FOR ENTIRE RUN.
22.ALL EXISTING MANHOLE AND CATCH BASIN GRATES, WATER OR GAS VALVES
SHALL BE ADJUSTED TO NEW FINISH GRADE ELEVATIONS.
23.PROVIDE 18" MINIMUM VERTICAL CLEARANCE BETWEEN SANITARY/WATER/STORM
SEWER PIPES AND ALL OTHER PIPES. INSTALL CONCRETE CRADLE IF CLEARANCE
IS LESS THAN 18".
24.ALL DETAILS & SPECS FOR WATER NEED TO BE CARMEL UTILITY DETAILS AND
SPECS.
25.ANY EXISTING FIELD TILE ENCOUNTERED DURING THE CONSTRUCTION SHALL BE
ALSO INCORPORATED INTO THE PROPOSED STORMWATER DRAINAGE SYSTEM
OR TIED TO AN ACCEPTABLE OUTLET.
UTILITY PLAN NOTES
SANITARY SEWER NOTES
CONNECT PROPOSED 6" SANITARY SEWER LATERAL TO EXISTING
SANITARY SEWER MANHOLE. CORE DRILL MANHOLE THROUGH
BENCH TO CREATE LATERAL BENCH FLOW LINE.
EXISTING 8" SANITARY SEWER.
PROPOSED SANITARY LATERAL CLEANOUT TYPE 1 (IN LANDSCAPE
AREAS WITHIN 3' OF BUILDING). REFER TO DETAIL ON SHEET C801.
PROPOSED SANITARY LATERAL CLEANOUT TYPE 3 (IN NON-PAVED
AREAS ONLY). REFER TO DETAIL ON SHEET C801.
PROVIDE 18" MINIMUM VERTICAL CLEARANCE BETWEEN
SANITARY/WATER/STORM SEWER PIPES AND ALL OTHER PIPES.
INSTALL CONCRETE CRADLE IF CLEARANCE IS LESS THAN 18"
CONNECT 6" SANITARY TO BUILDING. COORDINATE CONNECTION
WITH MEP.
PROPOSED SANITARY LATERAL CLEANOUT TYPE 2. REFER TO DETAIL
ON SHEET C801.
WATER SERVICE NOTES:
COORDINATE AND CONNECT 6" WATER SERVICE LINE TO EXISTING
WATER MAIN. WET TAP REQUIRED PER CARMEL UTILITY STANDARDS.
WATER LINE TO BE INSTALLED PER CARMEL UTILITY STANDARDS.
COORDINATE CONNECTION OF 112" DOMESTIC SERVICE LINE AND 6"
FIRE SERVICE LINE WITH PLUMBING DRAWINGS.
COORDINATE CONNECTION AND LOCATION OF DOMESTIC METER
WITH LOCAL SERVICE PROVIDER. [1 1/2" WATER METER SET W/
BACKFLOW PREVENTION INSIDE THE BUILDING ANTICIPATED].
EXISTING FIRE HYDRANT.
PROPOSED FIRE HYDRANT ASSEMBLY. REFER TO DETAIL ON SHEET
C801. THIS WILL BE PRIVATE.
PROPOSED POST INDICATOR VALVE (PIV).
PROPOSED FIRE DEPARTMENT CONNECTION 5" STORZ.
PROPOSED 6" PVC FIRE SERVICE LINE.
PROPOSED 11
2" DOMESTIC SERVICE LINE
PROPOSED 11
2" VALVE
PROPOSED 6" WATER LINE TO FIRE DEPARTMENT CONNECTION.
ELECTRIC NOTES:
COORDINATE AND CONNECT BUILDING ELECTRICAL LINE FROM
SERVICE DROP LOCATION TO TRANSFORMER. COORDINATE
CONNECTION WITH POWER COMPANY AND ELECTRICAL DRAWINGS.
ADJUST AS REQUIRED. [2-4" EC CONDUITS TO BE INSTALLED WITH
PULL STRINGS.
PROPOSED TRANSFORMER PAD LOCATION. COORDINATE WITH
UTILITY PROVIDER IF A NEW TRANSFORMER IS REQUIRED.
BUILDING ELECTRICAL LINE POINT OF CONNECTION. COORDINATE
CONNECTION WITH POWER COMPANY AND ELECTRICAL DRAWINGS.
ADJUST AS REQUIRED.
COMMUNICATION NOTES:
COORDINATE AND CONNECT BUILDING COMMUNICATION SERVICE
LINE(S) TO CONNECTION POINT AS SHOWN. ADJUST AS REQUIRED.
[4"] PVC CONDUIT TO BE INSTALLED WITH PULL STRINGS.
CONTRACTOR TO PROVIDE #6 GROUND WIRE AT THE D-MARC
LOCATION.
COORDINATE CONNECTION WITH SITE DRAWINGS AND SERVICE
PROVIDER.
W4
W2
W3
SS3
SS2
W1
SS4
E1
E2
C1
SS5
SS1
W5
W6
W7
W8
W9
C800UTILITY PLANELECTRICAL RISER
GUY ANCHOR
ELECTRIC JUNCTION BOX
ORNAMENTAL LIGHT
GENERATOR
STREET LIGHT
ELECTRIC MANHOLE
ELECTRIC OUTLET
UTILITY POLE
UTILITY POLE W/ TRANSFORMER
TRANSFORMER
COMMUNICATIONS JUNCTION BOX
COMMUNICATIONS MANHOLE
COMMUNICATIONS PEDESTAL
RIGHT OF WAY LINE
FENCE
GUARD RAIL
BOUNDARY LINE
FIRE DEPT HOOKUP
FIRE HYDRANT
POST INDICATOR VALVE
WATER METER
WATER VALVE
GAS METER
GAS VALVE
ELECTRIC METER
LIQUID PROPANE GAS TANK
MONITORING WELL
TRAFFIC SIGNAL POLE
TRAFFIC SIGNAL
DOWN SPOUT
COMMUNICATIONS RISER
STORM CLEANOUT
BEEHIVE INLET
CURB INLET
FLOOR DRAIN
ROUND INLET
SQUARE INLET
STORM MANHOLE
SANITARY SEWER CLEANOUT
LIFT STATION
SANITARY SEWER MANHOLE
SANITARY STUB MARKER
SEPTIC TANK
PARKING LOT LIGHT (1 HEAD)
DISTRIBUTION BOX
ROW RIGHT OF WAY
ESMT EASEMENT
D.&U.E.DRAINAGE AND UTILITY EASEMENT
FFE FINISH FLOOR ELEVATION
TOC TOP OF CASTING
CMP CORRUGATED METAL PIPE
RCP REINFORCED CONCRETE PIPE
PVC POLYVINYL CHLORIDE PIPE
VCP VITRIFIED CLAY PIPE
HDPE HIGH DENSITY POLYETHYLENE PIPE
DIP DUCTILE IRON PIPE
SSD SUB SURFACE DRAIN PIPE
STM STORM
SAN SANITARY
STR STRUCTURE
CO CLEANOUT
UTILITY PLAN LEGEND
UTILITIES
ABBREVIATIONS
LINE TYPES
FLOW LINE
SANITARY SEWER MAIN
STORM SEWER MAIN
UNDERGROUND GAS
UNDERGROUND WATER
AERIAL ELECTRIC
UNDERGROUND ELECTRIC
UNDERGROUND COMMUNICATIONS
AERIAL COMMUNICATIONS
OVERHEAD UTILITY
FORCE MAIN
G G G
W W
E(A)E(A)
E E E
C C C
C(A)C(A)
OHU OHU
FM FM
AERIAL FIBER OPTIC CABLEFO(A)FO(A)
UNDERGROUND FIBER OPTICFOFO
SANITARY SEWER LATERALSANSAN
ROOF DRAINSTMSTM
SUB SURFACE DRAIN
C2
E3
REVISIONS AND ISSUESPart of the NE/4 of Section 7, Township 17 North, Range 3 East, Clay Township, Hamilton County, IndianaW18.0330PREPARED FOR:10255 COMMERCE DRIVEPROJECT NO.
SHEET NO.CHECKED BY:DRAWN BY:MLTDESIGNED BY:DWG NAME:PROJECT NO.:W18.0330DATEBY03.31.2019MLTDATE:RLWKnow what's below.
before you dig.Call
R LINK OFFICE SUITESSUBMITTAL TO CARMEL ADLS/DP09.21.2018MLTW
S
N
E
STEVEN SCOTT RUCKER P.E. 11300279ENGINEERS317 | 846 - 6611800 | 452 - 6408317 | 843 - 0546 faxWEIHELand Surveying | Civil EngineeringLandscape ArchitectureALLAN H. WEIHE, P.E., L.S. - FOUNDER10505 N. College AvenueIndianapolis, Indiana 46280weihe.netBuild with confidence.SMREVISED FOR TAC COMMENTS11.21.2018MLTREVISED FOR TAC COMMENTS12.05.2018MLTREVISED FOR TAC COMMENTS01.02.2019RLWREVISED FOR TAC COMMENTS01.08.2019RLWREVISED SANITARY SEWER LATERAL03.13.2019RLWFINAL CONSTRUCTION PLANS03.31.2019RLW03.31.2019
SS6
W10
SS7
W11