Loading...
HomeMy WebLinkAboutC801 UTILITY DETAILSGREATER THAN 5' (1) LESS THAN 5' (2) Bc= OUTSIDE DIAMETER D = INSIDE DIAMETER d = DEPTH OF BEDDING MATERIAL BELOW PIPE TYPICAL BEDDING SECTION - RCP PIPE MIN. 6" TOPSOIL TO ENSURE GRASS GROWTH IF NOT UNDER PAVEMENT. (1) MIN. 1.25 Bc (2) 1.25 Bc + 12" (MIN.) EDGE OF PAVEMENT, CURB, GUTTER OR SIMILAR STRUCTURE. (1) REGULAR BACKFILL (2) "B" BORROW OR EQUIV. GRANULAR MATERIAL COMPACTED TO 95% STANDARD PROCTOR DENSITY. "B" BORROW OR EQUIV. GRANULAR MATERIAL COMPACTED TO 95% STANDARD PROCTOR DENSITY. NOTE: ALL BEDDING & INITIAL BACKFILL SHALL BE INSTALLED IN 6" TO 12" BALANCED LIFTS. A MIN. OF 9" CLEARANCE SHALL BE PROVIDED ON EACH SIDE OF THE INSTALLED PIPE. (2) "B" BORROW OR EQUIV. GRANULAR MATERIAL COMPACTED TO 95% STANDARD PROCTOR DENSITY #8 CRUSHED STONE OR APPROVED EQUIVALENT CLASS I BEDDING MATERIAL HAND TAMPED OR WALKED INTO PLACE TYPICAL BEDDING SECTION - PVC & HDPE ALL BEDDING & INITIAL BACKFILL SHALL BE INSTALLED IN 6" TO 12" BALANCED LIFTS A MIN. 9" CLEARANCE SHALL BE PROVIDED ON EACH SIDE OF THE INSTALLED PIPE Bc = OUTSIDE DIAMETER D = INSIDE DIAMETER D = DEPTH OF BEDDING MATERIAL BELOW PIPE (1) REGULAR BACKFILL GREATER THAN 5' (1) EDGE OF PAVEMENT, CURB, GUTTER OR SIMILAR STRUCTURE IN THE PUBLIC RIGHT-OF-WAY MIN. 6" TOPSOIL TO ENSURE GRASS GROWTH IF NOT UNDER PAVEMENT 12" MIN.Bc CONCRETE CRADLE DETAIL NOTE: CRADLE SHALL BEAR ON UNDISTURBED EARTH PERSPECTIVE VIEW EARTH CUT AWAY (NO SCALE) D 27" & SMALLER 30" TO 60" 66" & LARGER 6 4 3 C801UTILITY DETAILSw180330-C801 util detBOTTOM OF TRENCH (NO SCALE) 3500 PSI CONCRETE (NO SCALE) TYPICAL VALVE BOX INSTALLATION SIMILAR INSTALLATION FOR CURB BOX OR SERVICE LINE COMPACTED BACKFILL TO NATURAL GROUND ADJUSTABLE CAST IRON VALVE BOX EAST JORDON NO. 6860 5.25" SHAFT 42" MIN."POSI-CAP" VALVE COVER (NO SCALE)4"d 1/6 Bc d(MIN.) Bc REVISIONS AND ISSUESPart of the NE/4 of Section 7, Township 17 North, Range 3 East, Clay Township, Hamilton County, IndianaW18.0330PREPARED FOR:10255 COMMERCE DRIVEPROJECT NO. SHEET NO.CHECKED BY:DRAWN BY:MLTDESIGNED BY:DWG NAME:PROJECT NO.:W18.0330DATEBY03.31.2019MLTDATE:RLWLINK OFFICE SUITESSUBMITTAL TO CARMEL ADLS/DP09.21.2018MLTSTEVEN SCOTT RUCKER P.E. 11300279ENGINEERS317 | 846 - 6611800 | 452 - 6408317 | 843 - 0546 faxWEIHELand Surveying | Civil EngineeringLandscape ArchitectureALLAN H. WEIHE, P.E., L.S. - FOUNDER10505 N. College AvenueIndianapolis, Indiana 46280weihe.netBuild with confidence.SMREVISED FOR TAC COMMENTS11.21.2018MLTREVISED FOR TAC COMMENTS12.05.2018MLTREVISED FOR TAC COMMENTS01.02.2019RLWREVISED FOR TAC COMMENTS01.08.2019RLWREVISED SANITARY SEWER LATERAL03.13.2019RLWFINAL CONSTRUCTION PLANS03.31.2019RLW03.31.2019 (Must Be Red From The Factory)