HomeMy WebLinkAboutC801 UTILITY DETAILSGREATER THAN 5' (1)
LESS THAN 5' (2)
Bc= OUTSIDE DIAMETER
D = INSIDE DIAMETER
d = DEPTH OF BEDDING
MATERIAL BELOW PIPE
TYPICAL BEDDING SECTION - RCP PIPE
MIN. 6" TOPSOIL TO ENSURE
GRASS GROWTH IF NOT UNDER
PAVEMENT.
(1) MIN. 1.25 Bc
(2) 1.25 Bc + 12" (MIN.)
EDGE OF PAVEMENT,
CURB, GUTTER OR
SIMILAR STRUCTURE.
(1) REGULAR BACKFILL (2) "B" BORROW OR EQUIV.
GRANULAR MATERIAL
COMPACTED TO 95% STANDARD
PROCTOR DENSITY.
"B" BORROW OR EQUIV.
GRANULAR MATERIAL
COMPACTED TO 95% STANDARD
PROCTOR DENSITY.
NOTE:
ALL BEDDING & INITIAL
BACKFILL SHALL BE INSTALLED
IN 6" TO 12" BALANCED LIFTS. A
MIN. OF 9" CLEARANCE SHALL
BE PROVIDED ON EACH SIDE OF
THE INSTALLED PIPE.
(2) "B" BORROW OR EQUIV.
GRANULAR MATERIAL
COMPACTED TO 95%
STANDARD PROCTOR DENSITY
#8 CRUSHED STONE OR
APPROVED EQUIVALENT
CLASS I BEDDING MATERIAL
HAND TAMPED OR WALKED
INTO PLACE
TYPICAL BEDDING SECTION - PVC & HDPE
ALL BEDDING & INITIAL BACKFILL SHALL
BE INSTALLED IN 6" TO 12" BALANCED
LIFTS A MIN. 9" CLEARANCE SHALL BE
PROVIDED ON EACH SIDE OF THE
INSTALLED PIPE
Bc = OUTSIDE DIAMETER
D = INSIDE DIAMETER
D = DEPTH OF BEDDING
MATERIAL BELOW PIPE
(1) REGULAR BACKFILL
GREATER THAN 5' (1)
EDGE OF PAVEMENT,
CURB, GUTTER OR
SIMILAR STRUCTURE IN
THE PUBLIC
RIGHT-OF-WAY
MIN. 6" TOPSOIL TO ENSURE
GRASS GROWTH IF NOT UNDER
PAVEMENT
12" MIN.Bc
CONCRETE CRADLE DETAIL
NOTE:
CRADLE SHALL BEAR ON
UNDISTURBED EARTH
PERSPECTIVE VIEW
EARTH CUT AWAY
(NO SCALE)
D
27" & SMALLER
30" TO 60"
66" & LARGER 6
4
3
C801UTILITY DETAILSw180330-C801 util detBOTTOM OF TRENCH
(NO SCALE)
3500 PSI CONCRETE
(NO SCALE)
TYPICAL VALVE BOX INSTALLATION
SIMILAR INSTALLATION FOR CURB
BOX OR SERVICE LINE
COMPACTED BACKFILL
TO NATURAL GROUND
ADJUSTABLE
CAST IRON VALVE BOX
EAST JORDON NO. 6860
5.25" SHAFT
42" MIN."POSI-CAP"
VALVE COVER
(NO SCALE)4"d
1/6 Bc
d(MIN.)
Bc REVISIONS AND ISSUESPart of the NE/4 of Section 7, Township 17 North, Range 3 East, Clay Township, Hamilton County, IndianaW18.0330PREPARED FOR:10255 COMMERCE DRIVEPROJECT NO.
SHEET NO.CHECKED BY:DRAWN BY:MLTDESIGNED BY:DWG NAME:PROJECT NO.:W18.0330DATEBY03.31.2019MLTDATE:RLWLINK OFFICE SUITESSUBMITTAL TO CARMEL ADLS/DP09.21.2018MLTSTEVEN SCOTT RUCKER P.E. 11300279ENGINEERS317 | 846 - 6611800 | 452 - 6408317 | 843 - 0546 faxWEIHELand Surveying | Civil EngineeringLandscape ArchitectureALLAN H. WEIHE, P.E., L.S. - FOUNDER10505 N. College AvenueIndianapolis, Indiana 46280weihe.netBuild with confidence.SMREVISED FOR TAC COMMENTS11.21.2018MLTREVISED FOR TAC COMMENTS12.05.2018MLTREVISED FOR TAC COMMENTS01.02.2019RLWREVISED FOR TAC COMMENTS01.08.2019RLWREVISED SANITARY SEWER LATERAL03.13.2019RLWFINAL CONSTRUCTION PLANS03.31.2019RLW03.31.2019
(Must Be Red From The Factory)