HomeMy WebLinkAboutC001 TITLE SHEETNO SCALE
CONSTRUCTION PLANS FOR
MARTIN MARIETTA MATERIALS, INC.
NORTH INDY OFFICE BUILDING
5140 E 96TH ST
INDIANAPOLIS, IN 46062
PROJECT LOCATIONPROJECT LOCATION
LOCATION MAPAREA MAP
C001TITLE SHEETw193004-C001 titlePLANS PREPARED FOR
MARTIN MARIETTA MATERIALS, INC.
12220 N. MERIDIAN ST., SUITE 100
CARMEL, INDIANA 46032
TELEPHONE: (317) 428-5207
FAX: (317) 573-5975
CONTACT PERSON: DANIEL WILSON
EMAIL: DANIEL.WILSON@MARTINMARIETTA.COM
SITE BM
HCBR 246: HAMILTON COUNTY GEODETIC CONTROL DISK SET ON THE NORTHWEST
CONCRETE BRIDGE ABUTMENT OF THE 96TH STREET (COUNTY LINE ROAD) BRIDGE
OVER THE WHITE RIVER.
ELEV. - 745.66 (NGVD 29 DNR)
BENCHMARK INFORMATION
W
S
N
E
PLANS PREPARED BY
WEIHE ENGINEERS, INC.
10505 N. COLLEGE AVE.
INDIANAPOLIS, INDIANA 46280
TELEPHONE: (317) 846-6611
FAX: (317) 843-0546
CONTACT PERSON: FRED PARKER
EMAIL: PARKERF@WEIHE.NET
1.THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING, OR VERIFYING THAT ALL PERMITS AND
APPROVALS ARE OBTAINED FROM THE RESPECTIVE CITY, COUNTY, AND STATE AGENCIES PRIOR TO
STARTING CONSTRUCTION.
2.IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO DETERMINE THE EXACT LOCATION OF ALL
EXISTING UTILITIES IN THE VICINITY OF THE CONSTRUCTION AREA PRIOR TO STARTING
CONSTRUCTION
3.IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO NOTIFY AND COORDINATE CONSTRUCTION WITH
ALL RESPECTIVE UTILITIES.
4.ALL QUANTITIES GIVEN ON THESE PRINTS, VERBALLY OR IN THE SCOPE OF WORK SECTION ARE
ESTIMATES AND SHALL BE CONFIRMED BY THE BIDDING CONTRACTORS.
5.OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS FOR EXCAVATIONS; FINAL
RULE 29 CFR PART 1926, SUBPART "P" APPLIES TO ALL EXCAVATIONS EXCEEDING FIVE (5) FEET IN
DEPTH.
6.IN ADDITION, EXCAVATION EXCEEDING TWENTY (20) FEET IN DEPTH REQUIRE THE DESIGN OF A
TRENCH SAFETY SYSTEM BY A REGISTERED PROFESSIONAL ENGINEER.
7.IT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER AND CONTRACTOR TO MAINTAIN QUALITY
CONTROL THROUGHOUT THIS PROJECT.
8.TEMPORARY TRAFFIC CONTROL DURING CONSTRUCTION TO CONFORM TO APPLICABLE LOCAL
STANDARDS.
9.THE ENGINEER AND/OR OWNER DISCLAIM ANY ROLE IN THE CONSTRUCTION MEANS AND METHODS
ASSOCIATED WITH THE PROJECT AS SET FORTH IN THESE PLANS.
10.ANY FIELD TILES ENCOUNTERED DURING EXCAVATION SHALL BE REPAIRED AND CONNECTED TO NEW
STORM SEWERS AND POSITIVE DRAINAGE PRESERVED.
11.IT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER THAT ALL LANDSCAPE REQUIREMENTS ARE MET
AND CONFORM TO APPLICABLE LOCAL STANDARDS.
12.THE SITE DOES LIE IN SPECIAL FLOOD HAZARD AREAS CATEGORIZED AS ZONE "AE" AND SHADED ZONE
"X", AS ESTABLISHED BY THE FEDERAL EMERGENCY MANAGEMENT AGENCY - NATIONAL FLOOD
INSURANCE PROGRAM, WHEN PLOTTED BY SCALE ON FLOOD INSURANCE RATE MAP #18057C0237G,
DATED NOVEMBER 19, 2014.
13.BEARINGS, DIMENSIONS AND EASEMENTS ARE SHOWN FOR REFERENCE ONLY. SEE RECORD SURVEYS
& PLAT FOR EXACT INFORMATION.
14.THE SITE DOES NOT CONTAIN WETLANDS AS SHOWN ON THE U.S. DEPARTMENT OF THE INTERIOR FISH AND
WILDLIFE SERVICE, NATIONAL WETLANDS INVENTORY DIGITAL MAPPER FOR CARMEL INDIANA, UPDATED MARCH
13, 2019.
GENERAL NOTES REVISIONS AND ISSUESPart of Section 9, Township 17 North, Range 4 East, Clay Township, Hamilton County, IndianaW19.3004PREPARED FOR:5140 E 96TH ST, INDIANAPOLIS, IN 46240PROJECT NO.
SHEET NO.CHECKED BY:DRAWN BY:JLKDESIGNED BY:DWG NAME:PROJECT NO.:W19.03004DATEBY05.15.2019FAPDATE:FAPKnow what's below.
before you dig.Call
R APPROVAL PENDINGNOT FOR CONSTRUCTIONMARTIN MARIETTA MATERIALS, INC.ENGINEERS317 | 846 - 6611800 | 452 - 6408317 | 843 - 0546 faxWEIHELand Surveying | Civil EngineeringLandscape ArchitectureALLAN H. WEIHE, P.E., L.S. - FOUNDER10505 N. College AvenueIndianapolis, Indiana 46280weihe.netBuild with confidence.SMNORTH INDY OFFICE BUILDINGREVISED PER CARMEL TAC COMMENTS06.26.2019FAP1REVISED PER CARMEL TAC COMMENTS07.29.2019FAP2CITY OF CARMEL PLANNING
ONE CIVIC SQUARE
CARMEL, IN 46032
ANGIE CONN / ALEXIA LOPEZ
TEL: 317/571-2417
CITY OF CARMEL ENGINEERING
ONE CIVIC SQUARE
CARMEL, IN 46032
JOHN THOMAS / ALEX JORDAN
TEL: 317/571-2441
CITY OF CARMEL BLDG SERVICES
ONE CIVIC SQUARE
CARMEL, IN 46032
JIM BLANCHARD
TEL: 317/571-2444
CITY OF CARMEL FIRE DEPARTMENT
TWO CIVIC SQUARE
CARMEL, INDIANA 46032
CHRIS ELLISON
TEL: 317/571-2600
CARMEL CITY UTILITIES
30 W MAIN ST, SUITE 220
CARMEL, INDIANA 46032
JOHN DUFFY
TEL: 317/571-2648
HAMILTON COUNTY SURVEYOR
ONE HAMILTON COUNTY SQUARE
SUITE 188
NOBLESVILLE, INDIANA 46060
JERRY LISTON
TEL: 317/776-8495
CARMEL STREET DEPARTMENT
3400 W. 131ST ST.
CARMEL, IN 46074
DAVE HUFFMAN
TEL: 317/733-2001
INDIANAPOLIS POWER & LIGHT
1230 W. MORRIS ST.
INDIANAPOLIS, INDIANA 46221
LINDA LOHMILLER
TEL: 317/261-5274
SPECTRUM
3030 ROOSEVELT AVE.
INDIANAPOLIS, INDIANA 46218
TEL: 317/429-6691
VECTREN ENERGY - CENTERPOINT
P.O. BOX 1700
NOBLESVILLE, INDIANA, 46061
CHAD MILLER
TEL: 317/776-5590
AT&T
240 N. MERIDIAN ST.
INDIANAPOLIS, INDIANA 46204
BRIAN WENTE
TEL: 317/525-4894
OPERATING AUTHORITIES
Sheet List Table
Sheet Number Sheet Title
C001 TITLE SHEET
C100 SITE PREPARATION & SWPPP PHASE 1
C101 SITE PREPARATION & SWPPP PHASE 1
C102 SITE PREPARATION & SWPPP PHASE 1
C103 STORMWATER POLLUTION PREVENTION PLAN PHASE 2
C104 STORMWATER POLLUTION PREVENTION PLAN PHASE 2
C105 STORMWATER POLLUTION PREVENTION PLAN PHASE 2
C106 SWPPP DETAILS
C107 SWPPP DETAILS
C108 SWPPP SPECIFICATIONS
C200 SITE PLAN
C201 SITE DETAILS
C202 SITE DETAILS
C300 GRADING PLAN
C301 GRADING PLAN
C302 DRAINAGE PLAN
C303 DRAINAGE PLAN
C400 MAINTANANCE OF TRAFFIC
C500 SANITARY FORCE MAIN PLAN AND PROFILE
C501 SANITARY SEWER DETAILS
C502 SANITARY GRINDER STATION SPECIFICATIONS
C600 STORM SEWER PLAN AND PROFILE
C601 STORM SEWER PLAN AND PROFILE
C602 STORM SEWER PLAN AND PROFILE
C603 STORM SEWER DETAILS
C800 UTILITY PLAN
C801 UTILITY PLAN
C802 UTILITY DETAILS
C900 SPECIFICATIONS
C901 SPECIFICATIONS
C902 SPECIFICATIONS
L100 LANDSCAPE PLAN
L200 LANDSCAPE DETAILS
SITE TBM
TBM#1 IS A CUT '£' ON THE SE CORNER OF CONCRETE BASE NORTH OF IMI BATCH
PLANT. (SITE TBM HAS BEEN CONVERTED TO NAVD 88 DATUM)
ELEV. - 740.04 (NAVD 88)
LAND DESCRIPTION
THE SOUTHWEST QUARTER OF SECTION 9, TOWNSHIP 17 NORTH, RANGE
4 EAST OF THE SECOND PRINCIPAL MERIDIAN, IN CLAY TOWNSHIP,
HAMILTON COUNTY, INDIANA, AND CONTAINING 160 ACRES MORE OR
LESS.
SUBJECT TO THE RIGHT OF WAY FOR GRAY ROAD AND 96TH STREET
CONTAINING 6.70 ACRES MORE OR LESS.
ALSO, THE WEST HALF OF THE NORTHWEST QUARTER OF SECTION 9,
TOWNSHIP 17 NORTH, RANGE 4 EAST, IN CLAY TOWNSHIP, HAMILTON
COUNTY, INDIANA AND CONTAINING 80 ACRES, MORE OR LESS.
SUBJECT TO THE RIGHT OF WAY FOR GRAY ROAD AND 106TH STREET
CONTAINING 5.69 ACRES, MORE OR LESS.
EXCEPT THAT TRACT OF REAL ESTATE CONVEYED TO THE CITY OF
CARMEL, INDIANA AND AS DESCRIBED IN INSTRUMENT #2009027537,
BEING PART OF THE NORTH HALF OF THE WEST HALF OF THE
NORTHWEST QUARTER OF SECTION 9, TOWNSHIP 17 NORTH, RANGE 4
EAST, IN CLAY TOWNSHIP, HAMILTON COUNTY, INDIANA AND
CONTAINING 20 ACRES, MORE OR LESS.
DESIGN DATA
EXISTING ZONING:S-1
ZONING OVERLAY: N/A
TOTAL ACREAGE:207.61 ACRES
NET ACREAGE:207.61 ACRES
BUILDING COVER RATIO:.01%
BUILDING SQUARE FOOTAGE: 4,000 W/2,000 FUTURE
SQUARE FEET
DISTURBED ACREAGE: 11.60 AC.+/-
IMPERVIOUS COVER RATIO: .05%
SETBACKS:40' FRONT, 20' SIDE, 15' REAR
CITY OF CARMEL STANDARD NOTES
1.NO EARTH DISTURBING ACTIVITY MAY TAKE PLACE WITHOUT AN APPROVED STORM WATER MANAGEMENT
PERMIT
2.THESE PLANS COMPLY WITH ALL ADA REQUIREMENTS.
3.UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER.
UTILITY LINE RELOCATIONS REQUIRED FOR ROAD PROJECTS THAT RESULT IN A CONFLICT WITH PROPOSED
DEVELOPMENT SHALL BE THE DEVELOPER TO RESOLVE WITH THE UTILITY. EXISTING POLE LINES REQUIRED
TO BE RELOCATED TO WITHIN ONE FOOT OF PROPOSED RIGHT-OF-WAY LINE.
4.ALL EXISTING PERIMETER ROAD DRAINAGE STRUCTURES AND BRIDGES ACROSS THE FRONTAGE OF THIS
DEVELOPMENT ARE INDICATED ON THE PLANS. PROVISIONS HAVE BEEN MADE TO IMPROVE OR REPLACE ANY
DRAINAGE STRUCTURES AND BRIDGES AS NECESSARY OR AS REQUEST BY THE CITY TO ACCOMMODATE THE
PAVEMENT WIDENING, AUXILIARY LANES, MULTI-USE PATH, AND ANY OTHER REQUIRED IMPROVEMENTS TO
THE PROPERTY OR THE ROADWAY. THE COST TO IMPROVE OR REPLACE ANY DRAINAGE STRUCTURES AND
BRIDGES WILL BE BORNE BY THE DEVELOPER.
5.DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL BE RESTORED/REPAIRED TO THE SATISFACTION OF THE
CITY AT THE COMPLETION OF THE PROJECT. THE CONTRACTOR IS ENCOURAGED TO INSPECT THE
RIGHT-OF-WAY WITH THE CITY PRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THE EXISTING
CONDITION OF THE RIGHT-OF-WAY.
6.ALL PAVING WITHIN THE EXISTING AND PROPOSED CITY RIGHT -OF-WAY SHALL CONFORM TO THE
REQUIREMENTS OF THE DEPARTMENT OF ENGINEERING. THE CONTRACTOR SHALL CONTACT THE
DEPARTMENT OF ENGINEERING TO SCHEDULE A PRE-CONSTRUCTION MEETING TO REVIEW THE
DEPARTMENT'S CONSTRUCTION REQUIREMENTS, STAFF NOTIFICATION REQUIREMENTS, REQUIRED
INSPECTIONS FOR CERTAIN STAGES OF THE WORK AND TO REVIEW THE AUTHORITY OF THE DEPARTMENT AS
IT RELATES TO WORK WITHIN THE EXISTING AND PROPOSED RIGHT-OF-WAY.