HomeMy WebLinkAboutC102 SITE PREPARATION & SWPPP PHASE 1EEE
EC
OHU
OHU
OHU
OHU
OHUOHUOHUOHUOHUOHUOHUOHUOHUWCCCCCCFOFOGGGFOFOWWWWWOHUOHUOHUOHUWWWWWWWWWWWWWOHU OHU OHU OHU OHU
FMFMFMFMFMFMOHU OHU
OHU OHU
OHU
OHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUGGGGGGGGGGGGGGGGFOFOFOFOFOFOFOFOFOFOFOFOFOFOFMFM MATCH LINE C101
MATCH LINE C102
EXISTI
N
G
S
T
O
N
E
D
R
I
V
E
DDD
DDDDDDDDDDDDDDDDDDDDDDDDDD D D D D D D D D DDDDDDDDDDDDDDDDSF
SF SF SF SF SF
11
12
5
5
IP
IP
IP
14
13
13
13
C102SITE PREPARATION & SWPPP PHASE 1w193004-C100 SurveyREVISIONS AND ISSUESPart of Section 9, Township 17 North, Range 4 East, Clay Township, Hamilton County, IndianaW19.3004PREPARED FOR:5140 E 96TH ST, INDIANAPOLIS, IN 46240PROJECT NO.
SHEET NO.CHECKED BY:DRAWN BY:JLKDESIGNED BY:DWG NAME:PROJECT NO.:W19.03004DATEBY05.15.2019FAPDATE:FAPKnow what's below.
before you dig.Call
R
APP
R
O
V
AL P
E
N
DI
N
G
NOT FOR CONSTRUCTIONMARTIN MARIETTA MATERIALS, INC.ENGINEERS317 | 846 - 6611800 | 452 - 6408317 | 843 - 0546 faxWEIHELand Surveying | Civil EngineeringLandscape ArchitectureALLAN H. WEIHE, P.E., L.S. - FOUNDER10505 N. College AvenueIndianapolis, Indiana 46280weihe.netBuild with confidence.SMNORTH INDY OFFICE BUILDINGREVISED PER CARMEL TAC COMMENTS06.26.2019FAP1W
S
N
E
GENERAL NOTES
1.IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO
VERIFY WITH THE OWNER DURING BIDDING AND DURING
CONSTRUCTION ACTIVITIES ALL ITEMS TO BE REMOVED. IT IS THE
RESPONSIBILITY OF THE CONTRACTOR TO REMOVE ANY
MATERIALS AND/OR STRUCTURES NOT LOCATED ON THIS SURVEY
FOR THE INSTALLATION OF THE NEW WORK.
2.IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO
VERIFY ALL EXISTING UTILITIES PERTAINING TO THEIR PHASE OF
WORK, AND TO VERIFY WHICH UTILITIES WILL BE REMOVED BY
UTILITY COMPANY. ANY AND ALL UTILITIES NOT REMOVED BY THE
UTILITY COMPANY SHALL BE REMOVED BY THE CONTRACTOR.
3.UTILITIES ARE SHOWN TO BE APPROXIMATE AND SHALL BE
RELOCATED AND/OR CAPPED AND ABANDONED BEFORE
CONSTRUCTION AT NO ADDITIONAL COST TO THE OWNER.
4.ALL DEMOLITION MATERIAL AND SALVAGEABLE MATERIAL IS THE
PROPERTY OF THE DEMOLITION CONTRACTOR AND SHALL BE
PROPERLY DISPOSED OF OFF THE SITE.
5.SLABS ON GRADE MUST BE REMOVED COMPLETELY AND TAKEN
OFF THE SITE.
6.BEARINGS, DIMENSIONS, AND EASEMENTS ARE SHOWN FOR
REFERENCE ONLY. SEE RECORD SURVEYS AND PLATS FOR
EXACT INFORMATION.
7.ANY EXISTING TREE(S) THAT MAY REQUIRE REMOVAL BUT ARE
NOT SHOWN ON THE PLAN AS BEING REMOVED MAY BE DONE SO,
AS LONG AS THE TREE(S) ARE RELOCATED TO AN APPROVED
ALTERNATIVE LOCATION ON SITE.
8.IF THERE ARE ANY QUESTIONS CONCERNING THIS DEMOLITION
PLAN, PLEASE CONTACT THE ENGINEER BEFORE CONTINUING
WORK.
REMOVED ASPHALT PAVEMENT
HATCH LEGEND
EROSION CONTROL NOTES
1.ALL DISTURBED AREAS SHALL BE SODDED OR SEEDED, EXCEPT
BUILDING PAD AND LANDSCAPE BEDS. SEE LANDSCAPE PLANS FOR
LOCATION OF LANDSCAPE BEDS.
2.INSTALL SILT FENCE ALONG ALL DOWNSTREAM SLOPES. SILT
FENCE TO FOLLOW CONTOUR.
3.THERE SHALL BE NO DIRT, DEBRIS OR STORAGE OF MATERIAL IN
THE STREET.
CONTACT PERSON FOR EROSION
CONTROL & SEDIMENT PRACTICES
EROSION CONTROL SPECIFICATIONS
1.THIS PLAN IS DESIGNED AS AN ATTEMPT TO PREVENT ANY AND ALL
SEDIMENT FROM LEAVING THE CONSTRUCTION SITE BY WAY OF
EROSION. IF EROSION OF SEDIMENT FROM THE SITE IS TAKING
PLACE, THE CONTRACTOR AND/OR OWNER SHALL TAKE
PREVENTATIVE ACTION IMMEDIATELY. THE ENGINEER SHALL BE
CONSULTED IN THE EVENT THIS HAPPENS.
2.TEMPORARY SEEDING IS TO BE APPLIED TO ANY DISTURBED AREA
THAT WILL REMAIN UNALTERED IN EXCESS OF 15 DAYS.
3.PERMANENT SEEDING IS TO BE APPLIED IMMEDIATELY TO AREAS
THAT HAVE ACHIEVED FINAL AND FINISHED GRADE.
4.PRESERVE EXISTING VEGETATION ON THE SITE WHENEVER AND
WHEREVER POSSIBLE TO PREVENT TOPSOIL EROSION.
5.ALL SEDIMENT CAPTURING MEASURES SHALL BE IMPLEMENTED
PRIOR TO THE DISTURBANCE OF THE CONSTRUCTION AREA THEY
ARE INTENDED TO SERVICE. ALL EROSION CONTROL MEASURES
PROPOSED ARE TO BE PROPERLY MAINTAINED TO CONTINUE THEIR
EFFECTIVENESS.
6.IF GRADING OCCURS DURING THE MONTHS OF DECEMBER, JANUARY
OR FEBRUARY DORMANT SEEDING PROCEDURES SHALL BE USED.
7.DURING DRY WEATHER, KEEP LAWNS WATERED WITH SPRINKLERS
OR OTHER APPROVED METHODS. RESEED ANY AREAS NOT
GERMINATING OR DAMAGED AT INTERVALS AS MAY BE REQUIRED
ACCORDING TO SEASONAL CONDITION AND/OR CONSTRUCTION
ACTIVITY. WATER GRASS AND EXECUTE NECESSARY WEEDING UNTIL
FULL STAND OF GRASS HAS BEEN OBTAINED.
8.THE IMPLEMENTATION AND MAINTENANCE OF THE EROSION
CONTROL IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR
AND/OR OWNER.
9.IT SHALL BE THE CONTRACTOR'S AND/OR OWNER'S RESPONSIBILITY
TO MINIMIZE SEDIMENTATION (FROM ON-SITE CONSTRUCTION
ACTIVITIES) FROM BEING DEPOSITED ONTO ADJACENT PROPERTIES
AND RECEIVING STREAMS/DITCHES IN STRICT COMPLIANCE WITH
"RULE 5" (327 IAC 15-5, CONSTRUCTION ACTIVITY STORM WATER
RUNOFF CONTROL). IT SHALL ALSO BE THE CONTRACTOR'S AND/OR
OWNER'S RESPONSIBILITY TO OBTAIN ANY APPROVALS REQUIRED
FROM THE LOCAL AUTHORITY AND TO SUBMIT A COMPLETE NOTICE
OF INTENT LETTER TO THE OFFICE OF WATER MANAGEMENT,
INDIANA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT PRIOR TO
ANY CONSTRUCTION ACTIVITY.
10.FOR SEASONAL VARIATIONS - SEE SEASONAL SOIL PROTECTION
CHART IN THESE PLANS.
11.PORTABLE TOILETS MUST BE ANCHORED.
WEIHE ENGINEERS, INC.
10505 N. COLLEGE AVE.
INDIANAPOLIS, IN 46268
TELEPHONE: (317) 846-6611
FAX: (317) 843-0546
EMAIL: PARKERF@WEIHE.NET
CONTACT PERSON: FRED PARKER, CPESC
EXISTING AREAS
TOTAL SITE = 207.61± AC.
DISTURBED = 11.35± AC.
PERVIOUS = 7.15± AC.
IMPERVIOUS = 4.20± AC.
SWPPP PHASE 1 LEGEND
- INLET PROTECTION - USE SUBSURFACE
INLET PROTECTION WITH OVERFLOW
CAPABILITY WITHIN CITY RIGHT-OF-WAY
- CONSTRUCTION ENTRANCE
- STAGING AREA
- POSTING AREA - 4" PVC TUBE WITH END CAPS
ATTACHED TO PROJECT CONSTRUCTION SIGN
TO CONTAIN APPROVED CONSTRUCTION
DRAWINGS AND PERMITS FOR INSPECTORS.
- INSTALL COIR LOGS (GRASS AREA) OR SILT
DIKES (PAVEMENT AREA) AS SHOWN.
CONTRACTOR TO ADD ADDITIONAL MEASURES
AS CONSTRUCTION PHASING AND SITE
CONDITIONS DICTATE
- CONCRETE WASHOUT
- STOCKPILE AREA (TEMPORARY SEEDING
REQUIRED)
- SILT FENCE / COIR LOG
- LIMITS OF DISTURBANCE
SD
IP
SF
D
SITE PREPARATION / SWPPP PHASE 1 NOTES
INSTALL PERMIT POSTING AREA. 4" PVC TUBE WITH END CAPS ATTACHED TO
PROJECT CONSTRUCTION SIGN TO CONTAIN APPROVED CONSTRUCTION
DRAWINGS AND PERMITS FOR INSPECTORS.
UTILIZE EXISTING PAVED ENTRANCE OFF GRAY ROAD AND EXISTING STONE HAUL
ROAD AS THE CONSTRUCTION ENTRANCE. IF TRACKING OCCURS ON GRAY ROAD,
CONTRACTOR SHALL BE REQUIRED TO INSTALL A CONSTRUCTION ENTRANCE AS
SHOWN. REFER TO DETAIL SHEET C106.
SUGGESTED STAGING AREA. PROVIDE CONSTRUCTION DUMPSTER, FUELING
AREA, AND PORT-O-LET AS NEEDED. COORDINATE FINAL LOCATION WITH OWNER
INSTALL CONCRETE WASHOUT. REFER TO DETAIL ON SHEET C106. CONTRACTOR
TO PROVIDE STABILIZED ACCESS (STONE) TO WASHOUT TO PREVENT TRACKING.
INSTALL SILT FENCE OR COIR LOG. REFER TO DETAILS ON SHEET C106
LIMITS OF PROPOSED BUILDING
REMOVE EXISTING TREE(S) AND VEGETATION. REFER TO SHEET C300 FOR LIMITS
OF REMOVAL.
SAWCUT ASPHALT FULL DEPTH FOR REMOVAL.
SAWCUT CURB/ASPHALT JOINT FULL DEPTH FOR CURB REMOVAL. SAWCUT CURB
TO NEAREST JOINT AS REQUIRED. CONTRACTOR TO PROTECT EDGE OF ASPHALT
PRIOR TO NEW CURB BEING INSTALLED.
NOTE:
EXISTING CURB IS PLACED ON ASPHALT SUBBASE AND UNDERDRAINS.
CONTRACTOR TO USE CAUTION REMOVING CURB TO AVOID DAMAGE TO BASE AND
UNDERDRAINS.
REMOVE EXISTING CURB INLET CASTING AND FRAME. SAWCUT ASPHALT AS
REQUIRED FOR REMOVAL. REPLACE WITH NEENAH R-3067-028B FRAME, TYPE C
GRATE & CURB BACK. REFER TO DETAIL SHEET C603.
REMOVE EXISTING EVERGREEN YEWS (3-3'-4' DIA.) FOR ACCESS TO SANITARY
MANHOLE FOR FORCE MAIN CONNECTION. CONTRACTOR TO SALVAGE FOR
REPLANTING OR REPLACE WITH LIKE SPECIES AND SIZE.
CORE DRILL MANHOLE FOR 2" D.I. PIPE. REFER TO SHEET C500 FOR LOCATION.
COORDINATE WITH CITY OF CARMEL UTILITIES.
EXISTING INFILTRATION SWALE TO REMAIN.
EXISTING WHEEL WASH TO REMAIN.
1
2
3
4
5
6
7
8
9
LINE TYPES
G G G
W W
E(A)E(A)
E E E
C C C
OHU OHU
FM FM
FO FO
UNDERGROUND GAS
UNDERGROUND WATER
AERIAL ELECTRIC
UNDERGROUND ELECTRIC
UNDERGROUND COMMUNICATIONS
OVERHEAD UTILITY
FORCE MAIN
RIGHT OF WAY LINE
CHAIN LINK FENCE
BUILDING SETBACK LINE
BOUNDARY LINE
FLOW LINE
SECTION LINE
UNDERGROUND FIBER OPTIC
INDEX CONTOUR
INTERMEDIATE CONTOUR
SANITARY SEWER
STORM SEWER
10
11
13
14
12