Loading...
HomeMy WebLinkAboutC104 STORMWATER POLLUTION PREVENTION PLAN PHASE 2EC OHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUWWWWWWWWWWWWWWWWWWWWWWWWWWWONLY ONLY OHUOHUGGGGGGGGGGGGGGGGGGGGGGGFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOGGGGFOFOFOFOW FMFMW W W W WWG G G G G G GC C C C C C CSANSANSANSANSANSANSANSANSANSANSANW W WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWE E E E E E E E W W W WFMFMFMFMFMFMFMEEEEEEEE5 MATCH LINE C104 MATCH LINE C105 MATCH LINE C103 MATCH LINE C104 EXISTING STONE DRIVEEXISTING STONE DRIVEEXISTI N G S T O N E D R I V E IP IP IP IP IPIP IP IP IP IP IP IP CD DDDDDDDDDD D D D D D DDDDDDDDDDDDDDDD DDDDDDDDDDDDDD D DDDDDDDDDDDDDDDIP IPSF C104STORMWATER POLLUTION PREVENTION PLAN PHASE 2w193004-C103 swppp2REVISIONS AND ISSUESPart of Section 9, Township 17 North, Range 4 East, Clay Township, Hamilton County, IndianaW19.3004PREPARED FOR:5140 E 96TH ST, INDIANAPOLIS, IN 46240PROJECT NO. SHEET NO.CHECKED BY:DRAWN BY:JLKDESIGNED BY:DWG NAME:PROJECT NO.:W19.03004DATEBY05.15.2019FAPDATE:FAPKnow what's below. before you dig.Call R APP R O V AL PE N DI N G NOT FOR CONSTRUCTIONMARTIN MARIETTA MATERIALS, INC.ENGINEERS317 | 846 - 6611800 | 452 - 6408317 | 843 - 0546 faxWEIHELand Surveying | Civil EngineeringLandscape ArchitectureALLAN H. WEIHE, P.E., L.S. - FOUNDER10505 N. College AvenueIndianapolis, Indiana 46280weihe.netBuild with confidence.SMNORTH INDY OFFICE BUILDINGREVISED PER CARMEL TAC COMMENTS06.26.2019FAP1REVISED PER CARMEL TAC COMMENTS07.29.2019FAP2W S N ESITE BM HCBR 246: HAMILTON COUNTY GEODETIC CONTROL DISK SET ON THE NORTHWEST CONCRETE BRIDGE ABUTMENT OF THE 96TH STREET (COUNTY LINE ROAD) BRIDGE OVER THE WHITE RIVER. ELEV. - 745.66 (NGVD 29 DNR) BENCHMARK INFORMATION SITE TBM TBM#1 IS A CUT '£' ON THE SE CORNER OF CONCRETE BASE NORTH OF IMI BATCH PLANT. (SITE TBM HAS BEEN CONVERTED TO NAVD 88 DATUM) ELEV. - 740.04 (NAVD 88) LAND DESCRIPTION THE SOUTHWEST QUARTER OF SECTION 9, TOWNSHIP 17 NORTH, RANGE 4 EAST OF THE SECOND PRINCIPAL MERIDIAN, IN CLAY TOWNSHIP, HAMILTON COUNTY, INDIANA, AND CONTAINING 160 ACRES MORE OR LESS. SUBJECT TO THE RIGHT OF WAY FOR GRAY ROAD AND 96TH STREET CONTAINING 6.70 ACRES MORE OR LESS. ALSO, THE WEST HALF OF THE NORTHWEST QUARTER OF SECTION 9, TOWNSHIP 17 NORTH, RANGE 4 EAST, IN CLAY TOWNSHIP, HAMILTON COUNTY, INDIANA AND CONTAINING 80 ACRES, MORE OR LESS. SUBJECT TO THE RIGHT OF WAY FOR GRAY ROAD AND 106TH STREET CONTAINING 5.69 ACRES, MORE OR LESS. EXCEPT THAT TRACT OF REAL ESTATE CONVEYED TO THE CITY OF CARMEL, INDIANA AND AS DESCRIBED IN INSTRUMENT #2009027537, BEING PART OF THE NORTH HALF OF THE WEST HALF OF THE NORTHWEST QUARTER OF SECTION 9, TOWNSHIP 17 NORTH, RANGE 4 EAST, IN CLAY TOWNSHIP, HAMILTON COUNTY, INDIANA AND CONTAINING 20 ACRES, MORE OR LESS. SWPPP PHASE 2 LEGEND - INLET PROTECTION - USE SUBSURFACE INLET PROTECTION WITH OVERFLOW CAPABILITY WITHIN CITY RIGHT-OF-WAY - PERMANENT SEEDING USE PLANTING CHART - EROSION CONTROL BLANKET WITH PERMANENT SEEDING - USE S150BN BIO-NET AS SUPPLIED BY NORTH AMERICAN GREEN OR APPROVED EQUAL - STONE STABILIZATION - CONSTRUCTION ENTRANCE - STAGING AREA - POSTING AREA - 4" PVC TUBE WITH END CAPS ATTACHED TO PROJECT CONSTRUCTION SIGN TO CONTAIN APPROVED CONSTRUCTION DRAWINGS AND PERMITS FOR INSPECTORS. - CONCRETE WASHOUT - SILT FENCE / COIR LOG - INSTALL COIR LOGS (GRASS AREA) OR SILT DIKES (PAVEMENT AREA) AS SHOWN. CONTRACTOR TO ADD ADDITIONAL MEASURES AS CONSTRUCTION PHASING AND SITE CONDITIONS DICTATE - ROCK CHECK DAM - LIMITS OF DISTURBANCE (CONSTRUCTION LIMITS) - SITE DISCHARGE POINT SD IP SF * D CD SITE PREPARATION / SWPPP PHASE 1 NOTES INSTALL PERMIT POSTING AREA. 4" PVC TUBE WITH END CAPS ATTACHED TO PROJECT CONSTRUCTION SIGN TO CONTAIN APPROVED CONSTRUCTION DRAWINGS AND PERMITS FOR INSPECTORS. UTILIZE EXISTING PAVED ENTRANCE OFF GRAY ROAD AND EXISTING STONE HAUL ROAD AS THE CONSTRUCTION ENTRANCE. IF TRACKING OCCURS ON GRAY ROAD, CONTRACTOR SHALL BE REQUIRED TO INSTALL A CONSTRUCTION ENTRANCE AS SHOWN. REFER TO DETAIL SHEET C106. SUGGESTED STAGING AREA. PROVIDE CONSTRUCTION DUMPSTER, FUELING AREA, AND PORT-O-LET AS NEEDED. COORDINATE FINAL LOCATION WITH OWNER INSTALL CONCRETE WASHOUT. REFER TO DETAIL ON SHEET C106. CONTRACTOR TO PROVIDE STABILIZED ACCESS (STONE) TO WASHOUT TO PREVENT TRACKING. INSTALL SILT FENCE OR COIR LOG. REFER TO DETAILS ON SHEET C106 LIMITS OF PROPOSED BUILDING WIRE BACKED SILT FENCE AREA DRAIN PROTECTION. REFER TO DETAIL SHEET C107 REPLANT/REPLACE EVERGREEN YEWS (3-3'-4' DIA.) REMOVED WITH DEMOLITION STONE STABILIZATION. COORDINATE WITH OWNER. MINIMUM 4"- #2 STONE RECOMMENDED. EXISTING WHEEL WASH TO REMAIN. 1 2 3 4 5 6 7 8 9 LINE TYPES G G G W W E(A)E(A) E E E C C C OHU OHU FM FM FO FO UNDERGROUND GAS UNDERGROUND WATER AERIAL ELECTRIC UNDERGROUND ELECTRIC UNDERGROUND COMMUNICATIONS OVERHEAD UTILITY FORCE MAIN RIGHT OF WAY LINE CHAIN LINK FENCE BUILDING SETBACK LINE BOUNDARY LINE FLOW LINE SECTION LINE UNDERGROUND FIBER OPTIC INDEX CONTOUR INTERMEDIATE CONTOUR SANITARY SEWER STORM SEWER 10 CONTACT PERSON FOR EROSION CONTROL & SEDIMENT PRACTICES WEIHE ENGINEERS, INC. 10505 N. COLLEGE AVE. INDIANAPOLIS, IN 46268 TELEPHONE: (317) 846-6611 FAX: (317) 843-0546 EMAIL: PARKERF@WEIHE.NET CONTACT PERSON: FRED PARKER, CPESC EROSION CONTROL NOTES 1.ALL DISTURBED AREAS SHALL BE SODDED OR SEEDED, EXCEPT BUILDING PAD AND LANDSCAPE BEDS. SEE LANDSCAPE PLANS FOR LOCATION OF LANDSCAPE BEDS. 2.INSTALL SILT FENCE ALONG ALL DOWNSTREAM SLOPES. SILT FENCE TO FOLLOW CONTOUR. 3.THERE SHALL BE NO DIRT, DEBRIS OR STORAGE OF MATERIAL IN THE STREET. EROSION CONTROL SPECIFICATIONS 1.THIS PLAN IS DESIGNED AS AN ATTEMPT TO PREVENT ANY AND ALL SEDIMENT FROM LEAVING THE CONSTRUCTION SITE BY WAY OF EROSION. IF EROSION OF SEDIMENT FROM THE SITE IS TAKING PLACE, THE CONTRACTOR AND/OR OWNER SHALL TAKE PREVENTATIVE ACTION IMMEDIATELY. THE ENGINEER SHALL BE CONSULTED IN THE EVENT THIS HAPPENS. 2.TEMPORARY SEEDING IS TO BE APPLIED TO ANY DISTURBED AREA THAT WILL REMAIN UNALTERED IN EXCESS OF 15 DAYS. 3.PERMANENT SEEDING IS TO BE APPLIED IMMEDIATELY TO AREAS THAT HAVE ACHIEVED FINAL AND FINISHED GRADE. 4.PRESERVE EXISTING VEGETATION ON THE SITE WHENEVER AND WHEREVER POSSIBLE TO PREVENT TOPSOIL EROSION. 5.ALL SEDIMENT CAPTURING MEASURES SHALL BE IMPLEMENTED PRIOR TO THE DISTURBANCE OF THE CONSTRUCTION AREA THEY ARE INTENDED TO SERVICE. ALL EROSION CONTROL MEASURES PROPOSED ARE TO BE PROPERLY MAINTAINED TO CONTINUE THEIR EFFECTIVENESS. 6.IF GRADING OCCURS DURING THE MONTHS OF DECEMBER, JANUARY OR FEBRUARY DORMANT SEEDING PROCEDURES SHALL BE USED. 7.DURING DRY WEATHER, KEEP LAWNS WATERED WITH SPRINKLERS OR OTHER APPROVED METHODS. RESEED ANY AREAS NOT GERMINATING OR DAMAGED AT INTERVALS AS MAY BE REQUIRED ACCORDING TO SEASONAL CONDITION AND/OR CONSTRUCTION ACTIVITY. WATER GRASS AND EXECUTE NECESSARY WEEDING UNTIL FULL STAND OF GRASS HAS BEEN OBTAINED. 8.THE IMPLEMENTATION AND MAINTENANCE OF THE EROSION CONTROL IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR AND/OR OWNER. 9.IT SHALL BE THE CONTRACTOR'S AND/OR OWNER'S RESPONSIBILITY TO MINIMIZE SEDIMENTATION (FROM ON-SITE CONSTRUCTION ACTIVITIES) FROM BEING DEPOSITED ONTO ADJACENT PROPERTIES AND RECEIVING STREAMS/DITCHES IN STRICT COMPLIANCE WITH "RULE 5" (327 IAC 15-5, CONSTRUCTION ACTIVITY STORM WATER RUNOFF CONTROL). IT SHALL ALSO BE THE CONTRACTOR'S AND/OR OWNER'S RESPONSIBILITY TO OBTAIN ANY APPROVALS REQUIRED FROM THE LOCAL AUTHORITY AND TO SUBMIT A COMPLETE NOTICE OF INTENT LETTER TO THE OFFICE OF WATER MANAGEMENT, INDIANA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT PRIOR TO ANY CONSTRUCTION ACTIVITY. 10.FOR SEASONAL VARIATIONS - SEE SEASONAL SOIL PROTECTION CHART IN THESE PLANS. 11.PORTABLE TOILETS MUST BE ANCHORED. -WARNING- THIS PLAN TO BE USED FOR EROSION CONTROL PURPOSES ONLY. ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED IN THE FIELD BY THE INSPECTOR. EXISTING AREAS