HomeMy WebLinkAboutC302 DRAINAGE PLANOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUWWWWWWWWWWWWWWWWWWWWWWWWWWWONLY GGGGGGGGGGGGGGGGGGGGGGGGGGGGFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOW W W
W W W W W W
W WWWG G G G G G G G G G GGC C C C C C C C C C CCSANSANSANSANSANSANSANSANSANSANSANSANW W W WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWE E E E E E E E E E E E
E E EFM
FMFMFMFMFMFME
EEEEEEEEE
EEEE5
MATCH LINE C300
MATCH LINE C301 - VIEW "B"
MATCH LINE C300
MATCH LINE C301 - VIEW "A"
3
4
4
4
4
4
ELEV=740.07
ELEV=742.0
ELEV=741.0
ELEV=739.98
ELEV=742.0
ELEV=739.5
5
6
6
5
5
6 DDDDDD D
D D D D D D D D
DDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDD D D D DDDDDDDDDDDDDD3
C302w193004-C300 gradDRAINAGE PLANREVISIONS AND ISSUESPart of Section 9, Township 17 North, Range 4 East, Clay Township, Hamilton County, IndianaW19.3004PREPARED FOR:5140 E 96TH ST, INDIANAPOLIS, IN 46240PROJECT NO.
SHEET NO.CHECKED BY:DRAWN BY:JLKDESIGNED BY:DWG NAME:PROJECT NO.:W19.03004DATEBY05.15.2019FAPDATE:FAPKnow what's below.
before you dig.Call
R
APP
R
O
V
AL PE
N
DI
N
G
NOT FOR CONSTRUCTIONMARTIN MARIETTA MATERIALS, INC.W
S
N
E ENGINEERS317 | 846 - 6611800 | 452 - 6408317 | 843 - 0546 faxWEIHELand Surveying | Civil EngineeringLandscape ArchitectureALLAN H. WEIHE, P.E., L.S. - FOUNDER10505 N. College AvenueIndianapolis, Indiana 46280weihe.netBuild with confidence.SMNORTH INDY OFFICE BUILDINGREVISED PER CARMEL TAC COMMENTS06.26.2019FAP1REVISED PER CARMEL TAC COMMENTS07.29.2019FAP2PROPOSED OUTLET
DISCHARGE SUMMARY
PEAK DISCHARGE (CFS)
RETURN PERIOD
10 YR.
100 YR.
N/A 17.65 CFS
ALLOWABLE ACTUAL W/OFFSITE
N/A 21.81 CFS
NET SITE ACREAGE (MINUS ROW)
OFF-SITE ACREAGE
DETENTION VOLUME REQUIRED
DETENTION VOLUME PROVIDED
207.61 ACRES
N/A
N/A
N/A
DRAINAGE PLAN LEGEND
CARMEL REQUIREMENTS
1.NO EARTH DISTURBING ACTIVITY MAY TAKE PLACE
WITHOUT AN APPROVED STORM WATER
MANAGEMENT PERMIT.
2.DECORATIVE SIGNS, SPRINKLER SYSTEMS, TREES,
LANDSCAPING MOUNDS, FENCES, LIGHT POLES OR
OTHER SUCH AMENITIES ARE NOT PERMITTED WITHIN
THE RIGHT-0F-WAY.
3.M.F.P.G. = MINIMUM FLOOD PROTECTION GRADE
(ELEV=743.00) M.F.P.G. OF ALL STRUCTURES
FRONTING A POND OR OPEN DITCH SHALL BE NO
LESS THAN 2 FEET ABOVE ANY ADJACENT 100-YEAR
LOCAL OR REGIONAL FLOOD ELEVATIONS,
WHICHEVER IS GREATER, FOR ALL WINDOWS,
DOORS, PIPE ENTRANCES, WINDOW WELLS, AND ANY
OTHER STRUCTURE MEMBER WHERE FLOOD
WATERS CAN ENTER A BUILDING.
4.M.L.A.G. = LOWEST ADJACENT GRADE IS THE
ELEVATION (ELEV=743.00) OF THE LOWEST GRADE
ADJACENT TO A STRUCTURE WHEN THE SOIL MEETS
THE FOUNDATION AROUND THE OUTSIDE OF THE
STRUCTURE. (INCLUDING STRUCTURAL MEMBERS
SUCH AS BASEMENT WALKOUT, PATIOS, DECKS,
PORCHES, SUPPORT POST, OR PIERS, AND RIM OF
THE WINDOW WELL.
GUY ANCHOR
ELECTRIC JUNCTION BOX
GENERATOR
UTILITY POLE
UTILITY POLE W/ TRANSFORMER
TRANSFORMER
COMMUNICATIONS JUNCTION BOX
COMMUNICATIONS PEDESTAL
RIGHT OF WAY LINE
BOUNDARY LINE
FIRE HYDRANT
WELL HEAD
WATER VALVE
GAS METER
GAS VALVE
ELECTRIC METER
TRAFFIC SIGNAL POLE
TRAFFIC SIGNALDOWN SPOUT
STORM CLEANOUT
BEEHIVE INLET
CURB INLET
SQUARE INLET
STORM MANHOLE
SANITARY SEWER CLEANOUT
LIFT STATION
SANITARY SEWER MANHOLE
PARKING LOT LIGHT (1 HEAD)
PARKING LOT LIGHT (2 HEAD)
R/W RIGHT OF WAY
ESMT EASEMENT
D.&U.E.DRAINAGE AND UTILITY EASEMENT
FFE FINISH FLOOR ELEVATION
CMP CORRUGATED METAL PIPE
RCP REINFORCED CONCRETE PIPE
PVC POLYVINYL CHLORIDE PIPE
HDPE HIGH DENSITY POLYETHYLENE PIPE
DIP DUCTILE IRON PIPE
SSD SUB SURFACE DRAIN PIPE
STM STORM
SAN SANITARY
STR STRUCTURE
CO CLEANOUT
UTILITIES
ABBREVIATIONS
LINE TYPES
SANITARY SEWER MAIN
STORM SEWER MAIN
UNDERGROUND GAS
UNDERGROUND WATER
UNDERGROUND ELECTRIC
OVERHEAD UTILITY
FORCE MAIN
G G G
W W
E E E
C C C
OHU OHU
FM FM
UNDERGROUND FIBER OPTICFOFO
SANITARY SEWER LATERALSANSAN
ROOF DRAINSTMSTM
SUB SURFACE DRAIN
EXISTING SPOT ELEVATION
CURB & GUTTER ELEVATION
PAVEMENT SPOT ELEVATION
GROUND SPOT ELEVATION
BOLLARD
SIGN
ACCESSIBLE SPACE
OTHER
EMERGENCY FLOOD ROUTE
FLOW DIRECTION AND SLOPE
D D LIMITS OF DISTURBANCE
DRAINAGE PLAN NOTES
EXISTING INFILTRATION SWALE TO REMAIN.
EXISTING 6" SUBMERSIBLE PUMP TO REMAIN.
EXISTING CURB INLET WITH NEW CASTING/FRAME. REFER TO SHEET C603
AND C101-PLAN NOTE 10.
4" SUBSURFACE DRAINS, PERFORATED DUAL-WALL HANCOR HQ OR
EQUIVALENT. REFER TO DETAIL SHEET C603.
6" SUBSURFACE DRAIN, PERFORATED DUAL-WALL HANCOR HQ OR
EQUIVALENT. INSTALL AT 0.0% SLOPE AT INVERT ELEVATION OF 734.40
FROM STR 102. REFER TO DETAIL SHEET C603.
SUBSURFACE DRAIN RISER. REFER TO DETAIL SHEET C603.
1
2
3
4
GENERAL DRAINAGE NOTES
1.THE CONTRACTOR SHALL ADHERE TO ALL TERMS AND CONDITIONS AS OUTLINED IN
THE EPA OR APPLICABLE STATE GENERAL N.P.D.E.S. PERMIT FOR STORMWATER
DISCHARGE ASSOCIATED WITH CONSTRUCTION ACTIVITIES AND STORMWATER
POLLUTION PREVENTION PLAN.
2.REFER TO THE INDIANA DEPARTMENT OF TRANSPORTATION (INDOT) STANDARD
SPECIFICATIONS, LATEST EDITION, FOR BASIC MATERIALS AND CONSTRUCTION
METHODS. THE SECTIONS BELOW FOR VARIOUS ITEMS ARE TO CLARIFY THE INTENT
OF THE REQUIREMENTS FOR THIS PROJECT. PLEASE NOTE THAT OTHER SECTIONS
OF THE INDOT STANDARD SPECIFICATIONS MAY ALSO BE APPLICABLE.
3.THE CONTRACTOR SHALL CONTACT APPLICABLE STATE UNDERGROUND LOCATION
SERVICE AT LEAST 72 HOURS PRIOR TO ANY WORK AND SHALL CONTACT THE OWNER
AND/OR ENGINEER SHOULD UTILITIES APPEAR TO BE IN CONFLICT WITH THE
PROPOSED IMPROVEMENTS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR
TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED
IMPROVEMENTS SHOWN ON THE PLANS.
4.THE PLANS SHOW THE LOCATION OF ALL KNOWN UTILITIES LOCATED WITHIN THE
LIMITS OF CONSTRUCTION ACCORDING TO INFORMATION PROVIDED BY THE VARIOUS
UTILITY COMPANIES, PREVIOUS CONSTRUCTION PLANS AND AS EVIDENCED BY
OBSERVATION OF ABOVE GROUND CONDITIONS BY THE SURVEYOR. THE ACCURACY
OF THIS INFORMATION IS NOT GUARANTEED.
5.THE CONTRACTOR SHALL CONTACT ALL UTILITY COMPANIES TO LOCATE MAINS,
CONDUITS, SERVICE LINES, ETC. WITHIN THE CONSTRUCTION LIMITS. THE LOCATION
AND PROTECTION OF UTILITY STRUCTURES, THEIR SUPPORT AND MAINTENANCE
DURING CONSTRUCTION (IN COOPERATION WITH APPLICABLE UTILITY COMPANY) IS
THE EXPRESSED RESPONSIBILITY OF THE CONTRACTOR.
6.THE CONTRACTOR SHALL CONTACT ALL APPLICABLE UTILITIES AND VERIFY ANY AND
ALL FEES ASSOCIATED WITH THE INSTALLATION OF ALL UTILITIES.
7.ALL CONSTRUCTION ON THIS SITE TO BE PERFORMED IN COMPLIANCE WITH O.S.H.A.
STANDARDS FOR WORKER SAFETY.
8.ANY PART OF STORM SEWER TRENCHES RUNNING UNDER OR WITHIN 5' OF PAVEMENT
TO BE BACKFILLED WITH GRANULAR MATERIAL. REFER TO SHEET C603 FOR BACKFILL
DETAILS.
9.IT IS THE CONTRACTORS RESPONSIBILITY TO VERIFY LOCATION, SIZE, AND ELEVATION
OF EXISTING UTILITIES, STRUCTURES, PIPES, PAVEMENTS, ETC. AS RELATED TO
THEIR WORK. NOTIFY ENGINEER OF ANY CONFLICT AND/OR DISCREPANCIES IN THE
CONSTRUCTION DOCUMENTS.
10.MAINTAIN 10' HORIZONTAL AND 18" VERTICAL CLEARANCE BETWEEN STORM /
SANITARY SEWER SYSTEMS AND DOMESTIC/FIRE LINE SERVICE. SANITARY SEWER
LINE IN PROXIMITY OF WATER LINE SHALL BE C900 WATER MAIN GRADE PVC.
11.CONTRACTOR TO INSTALL CONCRETE CRADLES WHEN THE VERTICAL SEPARATION
(AS MEASURED FROM THE EXTERIOR OF THE PIPES) BETWEEN SANITARY SEWERS,
WATER MAINS AND STORM SEWERS IS 18" OR LESS.
12.IF ANY EXISTING STRUCTURES TO REMAIN ARE DAMAGED DURING CONSTRUCTION, IT
SHALL BE THE CONTRACTORS RESPONSIBILITY TO REPAIR AND/OR REPLACE THE
EXISTING STRUCTURE AS NECESSARY TO RETURN IT TO EXISTING CONDITIONS OR
BETTER.
13.WHEN PERFORMING EXCAVATIONS DURING PERIODS OF WET WEATHER, PROVIDE
ADEQUATE DEWATERING, DRAINAGE AND GROUND WATER MANAGEMENT TO
CONTROL MOISTURE OF SOILS.
14.COMPACTED "B" BORROW BACK FILL REQUIRED OVER ALL UTILITIES IN PAVED AREAS.
15.ALL UTILITY STRUCTURES IN PAVED AREAS SHALL BE FLUSH WITH PAVEMENT AND
SHALL HAVE TRAFFIC BEARING RING AND COVERS.
16.COORDINATE LOCATIONS AND CONNECTIONS OF BUILDING STORM LINES WITH
PLUMBING DRAWINGS.
17.FOLLOW ALL LOCAL AND STATE CODES IN REFERENCE TO STORM SEWER
INSTALLATION.
18.ALL EXISTING MANHOLE AND CATCH BASIN GRATES SHALL BE ADJUSTED TO NEW
FINISH GRADE ELEVATIONS.
19.EXISTING PIPES WITHIN CONSTRUCTION LIMITS ARE TO BE CLEANED OUT TO REMOVE
ALL SILT AND DEBRIS.
20.ALL STORM PIPE CONNECTIONS AT STRUCTURES SHALL BE GROUTED TO ASSURE
CONNECTION AT STRUCTURE IS WATERTIGHT.
21.ALL STORM SEWER STRUCTURES IN PAVED AREAS SHALL BE FLUSH WITH PAVEMENT
AND SHALL HAVE TRAFFIC BEARING RING AND COVERS.
22.ALL STORM SEWER STRUCTURES SHALL HAVE A SMOOTH UNIFORM POURED MORTAR
CHANNEL FROM INVERT IN TO INVERT OUT.
23.NEW PIPES AND STRUCTURES WITHIN CONSTRUCTION LIMITS ARE TO BE CLEANED
OUT TO REMOVE ALL SILT AND DEBRIS PRIOR TO FINAL TURNOVER TO THE OWNER.
24.ALL HDPE PIPE SHALL BE DUAL WALLED, HANCOR HQ, ADS N-12 PIPE OR APPROVED
EQUAL.
25.ALL FITTINGS AND ACCESSORIES INCLUDING BUT NOT LIMITED TO END CAPS,
CLEANOUTS, REDUCERS, ETC., SHALL BE OF HDPE MATERIAL COMPARABLE WITH
STORAGE PIPES.
26.PROVIDE BACKFILL WITH A MINIMUM OF 4" BEDDING MATERIAL OF #8 AGGREGATE
COMPACTED IN 8" LIFTS TO 95% MAXIMUM DRY DENSITY.
27.VERIFY EXISTING STORM INVERT ELEVATIONS PRIOR TO STARTING NEW STORM
SEWER CONNECTION.
28.ALL ON-SITE STORM SYSTEM WILL BE PRIVATE.
29.ALL MANHOLE AND INLET CASTINGS MUST BE PRE-STAMPED WITH "NO DUMPING
DRAINS TO WATERWAY."
30.REFER TO SHEET C601 FOR STORM SEWER STRUCTURE AND PIPE DATA TABLES.
100-YEAR PONDING LIMITS
5
6