Loading...
HomeMy WebLinkAboutALT_MAYFLOWERparkDR-C5.2-SITE DETAILSCLIENT REVIEW4-23-2019C5.2 1903-016KEELER-WEBB ASSOCIATESPROPOSED OFFICE / WAREHOUSE10650 N. BENNETT PARKWAY, SUITE 200ZIONSVILLE, IN 46077 (317) 253-1251SITE DETAILS 9801 Mayflower Park DriveCarmel, Indiana 46032Materials & Specifications: Location: Avoid location on steep slopes or at curves in public roadways. 20' Min 12" Min 150' INDOT CA Public R o a d No. 2 Aggregate Geotextile Fabric Underliner Culvert (If required) Maintenance: *Inspect daily *Reshape pad as needed for drainage and runoff control. *Top-dress with clean aggregate as needed. *Immediately remove mud and sediment tracked or washed onto public roads. *Flushing should only be used if the water from the construction drive can be conveyed into a sediment trap or basin. Installation: 1.Remove all vegetation and other objectionable material from the foundation area. 2.Grade the foundation and crown for positive drainage. Install a culvert pipe under the pad if needed to maintain proper public road drainage. 3.Place geotextile fabric on the graded foundation to improve stability. 4. Place aggregate (No. 2 Stone) to the dimensions shown above, leaving the surface smooth and sloped for drainage. 5.Where possible, divert all storm water runoff and drainage from the temporary construction entrance to a sediment trap or basin. Materials: 1-2.5 inch washed aggregate (INDOT CA No. 2), used primarily where the purpose of the pad is to keep soil from adhering to vehicle tires. Geotextile fabric underlayment; used as a separation layer to prevent intermixing of aggregate and the underlying soil material and to provide greater bearing strength when encountering wet conditions. Dimensions: Width- 20 feet minimum or full width of the entrance/drive, whichever is greater. Length-150 feet minimum or full length of the entrance/drive, whichever is greater. Thickness- 12 inch minimum CLIENT REVIEW5-08-20199-28-20193 ENGINEERING REVISIONSTAC REVIEW COMMENTS7-12-201919-02-20192ENGINEERING REVISIONS3 3