Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Merchants Bank HQ2 Full Set
8AB3456712CDEFGH83456712ABCDEFGHDESCRIPTIONDATENO REVISION RECORD 1 05/26/2023 CARMEL ADLS/DP SUBMITTAL 2 08/03/2023 CARMEL CYCLE 1 ADLS/DP RE-SUBMITTAL DATE: DWG SCALE: DRAWN BY: CHECKED BY: APPROVED BY: PROJECT NO:SHEETOFDRAWING NO.:321-189 AUGUST 31, 2023 BEB ACH24 DILLON CONSTRUCTION MERCHANTS BANK OFFICE BUILDING 210 3RD AVENUE SW CARMEL, INDIANA 46032REFERENCE 530 E. Ohio Street · Suite G - Indianapolis, IN 46204 317-655-7777 · 877-746-0749 www.cecinc.com 3 08/21/2023 REVISIONS PER CLIENT COMMMENTS 4 08/31/2023 CARMEL CYCLE 2 ADLS/DP RE-SUBMITTALDATE: DWG SCALE: DRAWN BY: CHECKED BY: APPROVED BY: PROJECT NO:SHEETOFDRAWING NO.:TITLE SHEET 321-189 SGJC000 NORTHADDITIONAL CITY OF CARMEL NOTES:CONSULTANT TEAM:CIVIL ENGINEERCIVIL & ENVIRONMENTALCONSULTANTS, INC.530 E. OHIO ST., STE. GINDIANAPOLIS, IN 46204PH: (317) 655-7777CONTACT: AARON HURTEMAIL: ahurt@cecinc.comPROJECTLOCATIONGASTELEPHONESTREETSSTORM SEWERWATERUTILITIES:UTILITY NOTE:MERCHANTS BANK OFFICE BUILDING210 3RD AVENUE SWCARMEL, INDIANA 46032CONSTRUCTION DOCUMENTSDOCKET # PZ-2023-00125AUGUST 31, 2023LOCATION MAPARCHITECTSTUDIO M ARCHITECTURE2 W. MAIN STREETCARMEL, INDIANA 46032PH: (317) 810-1502CONTACT: DAN MORIARITYEMAIL: dmoriarity@studiomarchitecture.comELECTRICSANITARY SEWERSITEMONON BOULEVARD - SOUTHBOUND OPERATING AUTHORITYCITY OF CARMELPARK LANE INDUSTRIAL DRIVEDEVELOPERDILLON CONSTRUCTION GROUP,INDIANA6828 HILLSDALE COURTINDIANAPOLIS, IN 46250PH:(317) 596-2767CONTACT: RJ BECKERICHEMAIL: rbeckerich@dilloncg.comSURVEYORCIVIL & ENVIRONMENTALCONSULTANTS, INC.530 E. OHIO ST., STE. GINDIANAPOLIS, IN 46204PH: (317) 655-7777CONTACT: ANTHONY SYERSEMAIL: asyers@cecinc.comFLOOD INFORMATION NOTE:HORIZONTAL & VERTICAL DATUM:MONON BOULEVARD - NORTHBOUND PARKING DATA:ZONING DATA: ADJACENT ZONING CLASSIFICATIONS:ZONING DATA: EXISTING ZONING CLASSIFICATION:SITE DATA:SITE DATA:BUILDING DATA:LOT COVERAGE2ND STREET SW4TH STREET SWEMERSON ROAD3RD AVENUE SW 4TH AVENUE SWLEGAL DESCRIPTION:DRAWING INDEXSheet No.Sheet TitleDrawing No.01TITLE SHEETC00002EXISTING CONDITIONSC10003SITE LAYOUT & DEVELOPMENT PLANC20004GRADING PLANC30005DRAINAGE PLANC40006STORM PROFILESC40107FLOOD ROUTING PLANC40208UTILITY PLANC50009MAINTENENCE OF TRAFFIC PLANC60010LANDSCAPE PLANC70011LANDSCAPE DETAILSC70112SITE DETAILSC80013SITE DETAILSC80114SITE DETAILSC80215SITE DETAILSC80316SANITARY DETAILSC80417SANITARY DETAILSC80518WATER DETAILSC80619WATER NOTES & SPECIFICATIONSC80720WATER NOTES & DETAILSC80821TEMP. STORMWATER POLLUTION & PREVENTION PLANC90022PERMANENT STORMWATER POLLUTION & PREVENTION PLANC90123STORMWATER POLLUTION & PREVENTION NOTESC90224STORMWATER POLLUTION & PREVENTION DETAILSC903ANTICIPATED CONSTRUCTION DATES:OCT. 2023 - MAY 202608/31/2023PARKING DATA:ZONING DATA: ADJACENT ZONING CLASSIFICATIONS:ZONING DATA: EXISTING ZONING CLASSIFICATION:SITE DATA:SITE DATA:BUILDING DATA:LOT COVERAGE·9/21/2023 WEST ELM STREET3RD AVENUE SWINDUSTRIAL DRIVEDEMOLITION LEGEND:BENCHMARKS:8AB3456712CDEFGH83456712ABCDEFGHDESCRIPTIONDATENO REVISION RECORD 1 05/26/2023 CARMEL ADLS/DP SUBMITTAL 2 08/03/2023 CARMEL CYCLE 1 ADLS/DP RE-SUBMITTAL DATE: DWG SCALE: DRAWN BY: CHECKED BY: APPROVED BY: PROJECT NO:SHEETOFDRAWING NO.:321-189 AUGUST 31, 2023 BEB ACH24 DILLON CONSTRUCTION MERCHANTS BANK OFFICE BUILDING 210 3RD AVENUE SW CARMEL, INDIANA 46032REFERENCE 530 E. Ohio Street · Suite G - Indianapolis, IN 46204 317-655-7777 · 877-746-0749 www.cecinc.com 3 08/21/2023 REVISIONS PER CLIENT COMMMENTS 4 08/31/2023 CARMEL CYCLE 2 ADLS/DP RE-SUBMITTAL NORTHDATE: DWG SCALE: DRAWN BY: CHECKED BY: APPROVED BY: PROJECT NO:SHEETOFDRAWING NO.:EXISTING CONDITIONS 1"=20' SGJC100 GENERAL NOTES:GENERAL SITE LAYOUT NOTES:LEGAL DESCRIPTION:FEMA NOTE:08/31/20239/21/2023 WEST ELM STREET3RD AVENUE SWINDUSTRIAL DRIVEDUPMERCHANTS BANKOFFICE BUILDING GARAGEFFE = 838.18BUCKINGHAMMULTI-FAMILY BUILDINGFFE = 838.35MERCHANTS BANKOFFICE BUILDINGGROSS BUILDING = 110,889 SFFFE = 838.350.99 ACRESAHGGEEEEEEEHHCCCCCCICCDFFFCSITE LEGEND:PROPOSED SITE KEY NOTES:8AB3456712CDEFGH83456712ABCDEFGHDESCRIPTIONDATENO REVISION RECORD 1 05/26/2023 CARMEL ADLS/DP SUBMITTAL 2 08/03/2023 CARMEL CYCLE 1 ADLS/DP RE-SUBMITTAL DATE: DWG SCALE: DRAWN BY: CHECKED BY: APPROVED BY: PROJECT NO:SHEETOFDRAWING NO.:321-189 AUGUST 31, 2023 BEB ACH24 DILLON CONSTRUCTION MERCHANTS BANK OFFICE BUILDING 210 3RD AVENUE SW CARMEL, INDIANA 46032REFERENCE 530 E. Ohio Street · Suite G - Indianapolis, IN 46204 317-655-7777 · 877-746-0749 www.cecinc.com 3 08/21/2023 REVISIONS PER CLIENT COMMMENTS 4 08/31/2023 CARMEL CYCLE 2 ADLS/DP RE-SUBMITTAL NORTHDATE: DWG SCALE: DRAWN BY: CHECKED BY: APPROVED BY: PROJECT NO:SHEETOFDRAWING NO.:SITE LAYOUT & DEVELOPMENT PLAN 1"=20' SGJ03C200 GENERAL NOTES:GENERAL SITE LAYOUT NOTES:08/31/2023·9/21/2023 UPMERCHANTS BANKOFFICE BUILDING GARAGEFFE = 838.18BUCKINGHAMMULTI-FAMILY BUILDINGFFE = 838.35MERCHANTS BANKOFFICE BUILDINGGROSS BUILDING = 110,889 SFFFE = 838.350.99 ACRESWEST ELM STREET3RD AVENUE SWINDUSTRIAL DRIVESGSMODMFPG = 838.97MLAG = 838.97MFPG = 838.44MLAG = 838.44GRADING LEGEND:FLOOD NOTE:DRAINAGE SUMMARY8AB3456712CDEFGH83456712ABCDEFGHDESCRIPTIONDATENO REVISION RECORD 1 05/26/2023 CARMEL ADLS/DP SUBMITTAL 2 08/03/2023 CARMEL CYCLE 1 ADLS/DP RE-SUBMITTAL DATE: DWG SCALE: DRAWN BY: CHECKED BY: APPROVED BY: PROJECT NO:SHEETOFDRAWING NO.:321-189 AUGUST 31, 2023 BEB ACH24 DILLON CONSTRUCTION MERCHANTS BANK OFFICE BUILDING 210 3RD AVENUE SW CARMEL, INDIANA 46032REFERENCE 530 E. Ohio Street · Suite G - Indianapolis, IN 46204 317-655-7777 · 877-746-0749 www.cecinc.com 3 08/21/2023 REVISIONS PER CLIENT COMMMENTS 4 08/31/2023 CARMEL CYCLE 2 ADLS/DP RE-SUBMITTAL NORTHDATE: DWG SCALE: DRAWN BY: CHECKED BY: APPROVED BY: PROJECT NO:SHEETOFDRAWING NO.:GRADING PLAN 1"=20' SGJ04C300 ADDITIONAL CITY OF CARMEL NOTES:GENERAL GRADING NOTES:”08/31/20239/21/2023 UPMERCHANTS BANKOFFICE BUILDING GARAGEFFE = 838.18BUCKINGHAMMULTI-FAMILY BUILDINGFFE = 838.35MERCHANTS BANKOFFICE BUILDINGGROSS BUILDING = 110,889 SFFFE = 838.350.99 ACRESWEST ELM STREET3RD AVENUE SWINDUSTRIAL DRIVESGSMODMFPG = 838.97MLAG = 838.97MFPG = 838.44MLAG = 838.44DRAINAGE LEGEND:FLOOD NOTE:DRAINAGE SUMMARY8AB3456712CDEFGH83456712ABCDEFGHDESCRIPTIONDATENO REVISION RECORD 1 05/26/2023 CARMEL ADLS/DP SUBMITTAL 2 08/03/2023 CARMEL CYCLE 1 ADLS/DP RE-SUBMITTAL DATE: DWG SCALE: DRAWN BY: CHECKED BY: APPROVED BY: PROJECT NO:SHEETOFDRAWING NO.:321-189 AUGUST 31, 2023 BEB ACH24 DILLON CONSTRUCTION MERCHANTS BANK OFFICE BUILDING 210 3RD AVENUE SW CARMEL, INDIANA 46032REFERENCE 530 E. Ohio Street · Suite G - Indianapolis, IN 46204 317-655-7777 · 877-746-0749 www.cecinc.com 3 08/21/2023 REVISIONS PER CLIENT COMMMENTS 4 08/31/2023 CARMEL CYCLE 2 ADLS/DP RE-SUBMITTAL NORTHDATE: DWG SCALE: DRAWN BY: CHECKED BY: APPROVED BY: PROJECT NO:SHEETOFDRAWING NO.:DRAINAGE PLAN 1"=20' SGJC400 ADDITIONAL CITY OF CARMEL NOTES:GENERAL GRADING NOTES:”08/31/20239/21/2023 FLOOD NOTE:BENCHMARKS:ROOF DRAIN TO STR D8 PROFILEROOF DRAIN TO STR D7 PROFILEDRAINAGE SUMMARY8AB3456712CDEFGH83456712ABCDEFGHDESCRIPTIONDATENO REVISION RECORD 1 05/26/2023 CARMEL ADLS/DP SUBMITTAL 2 08/03/2023 CARMEL CYCLE 1 ADLS/DP RE-SUBMITTAL DATE: DWG SCALE: DRAWN BY: CHECKED BY: APPROVED BY: PROJECT NO:SHEETOFDRAWING NO.:321-189 AUGUST 31, 2023 BEB ACH24 DILLON CONSTRUCTION MERCHANTS BANK OFFICE BUILDING 210 3RD AVENUE SW CARMEL, INDIANA 46032REFERENCE 530 E. Ohio Street · Suite G - Indianapolis, IN 46204 317-655-7777 · 877-746-0749 www.cecinc.com 3 08/21/2023 REVISIONS PER CLIENT COMMMENTS 4 08/31/2023 CARMEL CYCLE 2 ADLS/DP RE-SUBMITTALDATE: DWG SCALE: DRAWN BY: CHECKED BY: APPROVED BY: PROJECT NO:SHEETOFDRAWING NO.:STORM PROFILES 1"=20' SGJC401 CITY OF CARMEL NOTE:08/31/20239/21/2023 UPMERCHANTS BANKOFFICE BUILDING GARAGEFFE = 838.18BUCKINGHAMMULTI-FAMILY BUILDINGFFE = 838.35ELM STREETINDUSTRIAL DRIVEMERCHANTS BANKOFFICE BUILDINGGROSS BUILDING = 110,889 SFFFE = 838.350.99 ACRESWEST ELM STREET3RD AVENUE SWINDUSTRIAL DRIVESGSMODMFPG = 838.97MLAG = 838.97MFPG = 838.44MLAG = 838.44DRAINAGE SUMMARYGRADING LEGEND:FLOOD NOTE:NORTHADDITIONAL CITY OF CARMEL NOTES:GENERAL GRADING NOTES:”8AB3456712CDEFGH83456712ABCDEFGHDESCRIPTIONDATENO REVISION RECORD 1 05/26/2023 CARMEL ADLS/DP SUBMITTAL 2 08/03/2023 CARMEL CYCLE 1 ADLS/DP RE-SUBMITTAL DATE: DWG SCALE: DRAWN BY: CHECKED BY: APPROVED BY: PROJECT NO:SHEETOFDRAWING NO.:321-189 AUGUST 31, 2023 BEB ACH24 DILLON CONSTRUCTION MERCHANTS BANK OFFICE BUILDING 210 3RD AVENUE SW CARMEL, INDIANA 46032REFERENCE 530 E. Ohio Street · Suite G - Indianapolis, IN 46204 317-655-7777 · 877-746-0749 www.cecinc.com 3 08/21/2023 REVISIONS PER CLIENT COMMMENTS 4 08/31/2023 CARMEL CYCLE 2 ADLS/DP RE-SUBMITTALDATE: DWG SCALE: DRAWN BY: CHECKED BY: APPROVED BY: PROJECT NO:SHEETOFDRAWING NO.:FLOOD ROUTING PLAN 1"=20' SGJ07C40208/31/20239/21/2023 WEST ELM STREET3RD AVENUE SWINDUSTRIAL DRIVEUPMERCHANTS BANKOFFICE BUILDING GARAGEFFE = 838.18BUCKINGHAMMULTI-FAMILY BUILDINGFFE = 838.35MERCHANTS BANKOFFICE BUILDINGGROSS BUILDING = 110,889 SFFFE = 838.350.99 ACRESSGSMODUTILITY LEGEND:8AB3456712CDEFGH83456712ABCDEFGHDESCRIPTIONDATENO REVISION RECORD 1 05/26/2023 CARMEL ADLS/DP SUBMITTAL 2 08/03/2023 CARMEL CYCLE 1 ADLS/DP RE-SUBMITTAL DATE: DWG SCALE: DRAWN BY: CHECKED BY: APPROVED BY: PROJECT NO:SHEETOFDRAWING NO.:321-189 AUGUST 31, 2023 BEB ACH24 DILLON CONSTRUCTION MERCHANTS BANK OFFICE BUILDING 210 3RD AVENUE SW CARMEL, INDIANA 46032REFERENCE 530 E. Ohio Street · Suite G - Indianapolis, IN 46204 317-655-7777 · 877-746-0749 www.cecinc.com 3 08/21/2023 REVISIONS PER CLIENT COMMMENTS 4 08/31/2023 CARMEL CYCLE 2 ADLS/DP RE-SUBMITTAL NORTHDATE: DWG SCALE: DRAWN BY: CHECKED BY: APPROVED BY: PROJECT NO:SHEETOFDRAWING NO.:UTILITY PLAN 1"=20' SGJC500UTILITY NOTE:GENERAL UTILITY NOTES:08/31/20239/21/2023 FLOOD NOTE:UPMERCHANTS BANKOFFICE BUILDING GARAGEFFE = 838.18BUCKINGHAMMULTI-FAMILY BUILDINGFFE = 838.35ELM STREETINDUSTRIAL DRIVEMERCHANTS BANKOFFICE BUILDINGGROSS BUILDING = 110,889 SFFFE = 838.350.99 ACRESI N D U S T R I A L D R I V E3 rd A V E N U E S. W.SIDEWALK CLOSED AHEAD WARNING SIGNTO BE PLACED 1 BLOCK FROM CLOSURE.AHEADCROSS HERE2 nd A V E N U E S. W.SIDEWALK CLOSEDUSE OTHER SIDER9-10 [12" X 24"]NOTETHESE SIGNS ARE TYPICALLY MOUNTED ON A DETECTABLE BARRICADE TO ENCOURAGECOMPLIANCE AND TO COMMUNICATE TO PEDESTRIANS THAT THE SIDEWALK IS CLOSED.HOWEVER, PRINTED SIGNS ARE NOT USEFUL TO MANY PEDESTRIANS WITH VISUALDISABILITIES, THEREFORE A BARRIER OR BARRICADE DETECTABLE BY A PERSON WITH AVISUAL DISABILITY IS SUFFICIENT TO INDICATE THAT A SIDEWALK IS CLOSED. IF THEBARRIER IS CONTINUOUS WITH DETECTABLE CHANNELIZING DEVICES FOR AN ALTERNATEROUTE, ACCESSIBLE SIGNING MAY NOT BE NECESSARY. AN AUDIBLE INFORMATION DEVICEIS NEEDED WHEN THE DETECTABLE BARRICADE OR BARRIER FOR AN ALTERNATECHANNELIZED ROUTE IS NOT CONTINUOUS.NOTES:WARNING LIGHTS:XW20-2 [48" X 48"]SIDEWALK CLOSEDAHEADCROSS HERER9-11a [18" X 24"]NON-METALLICREFLECTORIZED DRUMWITH LIGHTNOTES:1.ALL SIGNS AND BARRICADES TO BE PLACED IN ACCORDANCE WITH THE LATEST EDITIONOF THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES.2.NO CONSTRUCTION SHALL COMMENCE PRIOR TO APPROVAL BY INDIANAPOLISDEPARTMENT OF PUBLIC WORKS.3.CONTRACTOR SHALL MAINTAIN ADA ACCESSIBLE PEDESTRIAN ROUTE AT ALL TIMES.4.CONTRACTOR SHALL PROVIDE ALL NECESSARY SIGNAGE FOR PEDESTRIAN TRAFFIC.ADDITIONAL SIGNAGE, BARRICADES AND TRAFFIC CONTROL DEVICES, OTHER THANSHOWN, COULD BE REQUIRED.5.PLAN SHOWN IS FOR GENERAL PURPOSES AND IS NOT A COMPLETE MAINTENANCE OFTRAFFIC PLAN.8AB3456712CDEFGH83456712ABCDEFGHDESCRIPTIONDATENO REVISION RECORD 1 05/26/2023 CARMEL ADLS/DP SUBMITTAL 2 08/03/2023 CARMEL CYCLE 1 ADLS/DP RE-SUBMITTAL DATE: DWG SCALE: DRAWN BY: CHECKED BY: APPROVED BY: PROJECT NO:SHEETOFDRAWING NO.:321-189 AUGUST 31, 2023 BEB ACH24 DILLON CONSTRUCTION MERCHANTS BANK OFFICE BUILDING 210 3RD AVENUE SW CARMEL, INDIANA 46032REFERENCE 530 E. Ohio Street · Suite G - Indianapolis, IN 46204 317-655-7777 · 877-746-0749 www.cecinc.com 3 08/21/2023 REVISIONS PER CLIENT COMMMENTS 4 08/31/2023 CARMEL CYCLE 2 ADLS/DP RE-SUBMITTAL NORTHDATE: DWG SCALE: DRAWN BY: CHECKED BY: APPROVED BY: PROJECT NO:SHEETOFDRAWING NO.:MAINTENENCE OF TRAFFIC PLAN 1"=50' SGJ09C600 TRAFFIC LEGEND:STANDARD SIGNCONSTRUCTION DRUMS, CHANNELIZING DEVICESBARRICADE, CHANNELIZING DEVICES08/31/20239/21/2023 UPMERCHANTS BANKOFFICE BUILDING GARAGEFFE = 838.18BUCKINGHAMMULTI-FAMILY BUILDINGFFE = 838.35MERCHANTS BANKOFFICE BUILDINGGROSS BUILDING = 110,889 SFFFE = 838.350.99 ACRESSGSMODWEST ELM STREET3RD AVENUE SWINDUSTRIAL DRIVE8AB3456712CDEFGH83456712ABCDEFGHDESCRIPTIONDATENO REVISION RECORD 1 05/26/2023 CARMEL ADLS/DP SUBMITTAL 2 08/03/2023 CARMEL CYCLE 1 ADLS/DP RE-SUBMITTAL DATE: DWG SCALE: DRAWN BY: CHECKED BY: APPROVED BY: PROJECT NO:SHEETOFDRAWING NO.:321-189 AUGUST 31, 2023 BEB ACH24 DILLON CONSTRUCTION MERCHANTS BANK OFFICE BUILDING 210 3RD AVENUE SW CARMEL, INDIANA 46032 530 E. Ohio Street · Suite G - Indianapolis, IN 46204 317-655-7777 · 877-746-0749 www.cecinc.com 3 08/21/2023 REVISIONS PER CLIENT COMMMENTS 4 08/31/2023 CARMEL CYCLE 2 ADLS/DP RE-SUBMITTAL NORTHDATE: DWG SCALE: DRAWN BY: CHECKED BY: APPROVED BY: PROJECT NO:SHEETOFDRAWING NO.:LANDSCAPE PLAN 1"=20' SGJ10C700 GENERAL LANDSCAPE NOTES:ADDITIONAL CITY OF CARMEL NOTES:08/31/20239/21/2023 ™ ® PLANT SCHEDULEDATE: DWG SCALE: DRAWN BY: CHECKED BY: APPROVED BY: PROJECT NO:SHEETOFDRAWING NO.:LANDSCAPE DETAILS 325-748 SGJ BEB ACH11C701DETAIL 703 - TREE STAKING DETAILDETAIL 704 - ORNAMENTAL GRASS/ PERENNIAL ANDGROUNDCOVER PLANTING DETAILDETAIL 705 - SPADE EDGING DETAILDETAIL 706 - STONE MULCH DETAIL8AB3456712CDEFGH83456712ABCDEFGHDESCRIPTIONDATENO REVISION RECORD 1 05/26/2023 CARMEL ADLS/DP SUBMITTAL 2 08/03/2023 CARMEL CYCLE 1 ADLS/DP RE-SUBMITTAL DATE: DWG SCALE: DRAWN BY: CHECKED BY: APPROVED BY: PROJECT NO:SHEETOFDRAWING NO.:321-189 AUGUST 31, 2023 BEB ACH24 DILLON CONSTRUCTION MERCHANTS BANK OFFICE BUILDING 210 3RD AVENUE SW CARMEL, INDIANA 46032 530 E. Ohio Street · Suite G - Indianapolis, IN 46204 317-655-7777 · 877-746-0749 www.cecinc.com 3 08/21/2023 REVISIONS PER CLIENT COMMMENTS 4 08/31/2023 CARMEL CYCLE 2 ADLS/DP RE-SUBMITTAL08/31/20239/21/2023 8AB3456712CDEFGH83456712ABCDEFGHDESCRIPTIONDATENO REVISION RECORD 1 05/26/2023 CARMEL ADLS/DP SUBMITTAL 2 08/03/2023 CARMEL CYCLE 1 ADLS/DP RE-SUBMITTAL DATE: DWG SCALE: DRAWN BY: CHECKED BY: APPROVED BY: PROJECT NO:SHEETOFDRAWING NO.:321-189 AUGUST 31, 2023 BEB ACH24 DILLON CONSTRUCTION MERCHANTS BANK OFFICE BUILDING 210 3RD AVENUE SW CARMEL, INDIANA 46032REFERENCE 530 E. Ohio Street · Suite G - Indianapolis, IN 46204 317-655-7777 · 877-746-0749 www.cecinc.com 3 08/21/2023 REVISIONS PER CLIENT COMMMENTS 4 08/31/2023 CARMEL CYCLE 2 ADLS/DP RE-SUBMITTALDETAIL 207 - CONCRETE JOINT DETAILSDETAIL 209 - CURB JOINT DETAILDETAIL 206 - SIDEWALK ADJACENT TO CURBDETAIL 205 - STRAIGHT CONCRETE CURBDETAIL 203 - CONCRETE SIDEWALKDETAIL 202 - CURB AND GUTTER, CONC. TYPE IIDETAIL 201 - CURB ADJACENT TO EXISTING PAVEMENTDETAIL 208 - CONCRETE PAVEMENT SECTIONDETAIL 204 - STREET REPAIR DETAILDATE: DWG SCALE: DRAWN BY: CHECKED BY: APPROVED BY: PROJECT NO:SHEETOFDRAWING NO.:SITE DETAILS SGJ BEB ACH12C80008/31/20239/21/2023 8AB3456712CDEFGH83456712ABCDEFGHDESCRIPTIONDATENO REVISION RECORD 1 05/26/2023 CARMEL ADLS/DP SUBMITTAL 2 08/03/2023 CARMEL CYCLE 1 ADLS/DP RE-SUBMITTAL DATE: DWG SCALE: DRAWN BY: CHECKED BY: APPROVED BY: PROJECT NO:SHEETOFDRAWING NO.:321-189 AUGUST 31, 2023 BEB ACH24 DILLON CONSTRUCTION MERCHANTS BANK OFFICE BUILDING 210 3RD AVENUE SW CARMEL, INDIANA 46032REFERENCE 530 E. Ohio Street · Suite G - Indianapolis, IN 46204 317-655-7777 · 877-746-0749 www.cecinc.com 3 08/21/2023 REVISIONS PER CLIENT COMMMENTS 4 08/31/2023 CARMEL CYCLE 2 ADLS/DP RE-SUBMITTALDATE: DWG SCALE: DRAWN BY: CHECKED BY: APPROVED BY: PROJECT NO:SHEETOFDRAWING NO.:SITE DETAILS SGJ BEB ACH13C801 DETAIL 210 - ONE-WAY DIRECTIONAL PERPENDICULAR CURB RAMP(INDOT STANDARD DRAWING E 604-SWCR-05)DETAIL 218B - CONCRETE DRIVE W/ COMBINEDDEPRESSED CURB AND GUTTERDETAIL 212 - CONCRETE WHEEL STOPDETAIL 213 - ADA ACCESSIBLE PARKING STALLSDETAIL 215 - SIGNAGE DETAILDETAIL 214 - PAINTED ADA ACCESSIBLESYMBOL DETAILNOT TO SCALEARMOR-TILE TACTILE SYSTEMDETAIL 211 - DETECTABLE WARNING STRIP DETAILDETAIL 216 - LIGHT DUTY ASPHALTPAVEMENT SECTION DETAIL 217 - HEAVY DUTY ASPHALTPAVEMENT SECTIONDETAIL 218A - COMMECIAL DRIVE W/ COMBINEDDEPRESSED CURB AND GUTTER08/31/20239/21/2023 8AB3456712CDEFGH83456712ABCDEFGHDESCRIPTIONDATENO REVISION RECORD 1 05/26/2023 CARMEL ADLS/DP SUBMITTAL 2 08/03/2023 CARMEL CYCLE 1 ADLS/DP RE-SUBMITTAL DATE: DWG SCALE: DRAWN BY: CHECKED BY: APPROVED BY: PROJECT NO:SHEETOFDRAWING NO.:321-189 AUGUST 31, 2023 BEB ACH24 DILLON CONSTRUCTION MERCHANTS BANK OFFICE BUILDING 210 3RD AVENUE SW CARMEL, INDIANA 46032REFERENCE 530 E. Ohio Street · Suite G - Indianapolis, IN 46204 317-655-7777 · 877-746-0749 www.cecinc.com 3 08/21/2023 REVISIONS PER CLIENT COMMMENTS 4 08/31/2023 CARMEL CYCLE 2 ADLS/DP RE-SUBMITTALDATE: DWG SCALE: DRAWN BY: CHECKED BY: APPROVED BY: PROJECT NO:SHEETOFDRAWING NO.:SITE DETAILS SGJ BEB ACH14C802 DETAIL 223B - BICYCLE HOOP DETAILDETAIL 223A - BIKE RACK08/31/20239/21/2023 8AB3456712CDEFGH83456712ABCDEFGHDESCRIPTIONDATENO REVISION RECORD 1 05/26/2023 CARMEL ADLS/DP SUBMITTAL 2 08/03/2023 CARMEL CYCLE 1 ADLS/DP RE-SUBMITTAL DATE: DWG SCALE: DRAWN BY: CHECKED BY: APPROVED BY: PROJECT NO:SHEETOFDRAWING NO.:321-189 AUGUST 31, 2023 BEB ACH24 DILLON CONSTRUCTION MERCHANTS BANK OFFICE BUILDING 210 3RD AVENUE SW CARMEL, INDIANA 46032REFERENCE 530 E. Ohio Street · Suite G - Indianapolis, IN 46204 317-655-7777 · 877-746-0749 www.cecinc.com 3 08/21/2023 REVISIONS PER CLIENT COMMMENTS 4 08/31/2023 CARMEL CYCLE 2 ADLS/DP RE-SUBMITTALDATE: DWG SCALE: DRAWN BY: CHECKED BY: APPROVED BY: PROJECT NO:SHEETOFDRAWING NO.:SITE DETAILS SGJ BEB ACH15C803 DETAIL 401 - TRENCH DETAIL FOR CITY STORM SEWERSDETAIL 406 - UNDERDRAINDETAIL 224- TREE GRATE08/31/20239/21/2023 8AB3456712CDEFGH83456712ABCDEFGHDESCRIPTIONDATENO REVISION RECORD 1 05/26/2023 CARMEL ADLS/DP SUBMITTAL 2 08/03/2023 CARMEL CYCLE 1 ADLS/DP RE-SUBMITTAL DATE: DWG SCALE: DRAWN BY: CHECKED BY: APPROVED BY: PROJECT NO:SHEETOFDRAWING NO.:321-189 AUGUST 31, 2023 BEB ACH24 DILLON CONSTRUCTION MERCHANTS BANK OFFICE BUILDING 210 3RD AVENUE SW CARMEL, INDIANA 46032REFERENCE 530 E. Ohio Street · Suite G - Indianapolis, IN 46204 317-655-7777 · 877-746-0749 www.cecinc.com 3 08/21/2023 REVISIONS PER CLIENT COMMMENTS 4 08/31/2023 CARMEL CYCLE 2 ADLS/DP RE-SUBMITTALDATE: DWG SCALE: DRAWN BY: CHECKED BY: APPROVED BY: PROJECT NO:SHEETOFDRAWING NO.:SANITARY DETAILS SGJ BEB ACH16C80408/31/20239/21/2023 8AB3456712CDEFGH83456712ABCDEFGHDESCRIPTIONDATENO REVISION RECORD 1 05/26/2023 CARMEL ADLS/DP SUBMITTAL 2 08/03/2023 CARMEL CYCLE 1 ADLS/DP RE-SUBMITTAL DATE: DWG SCALE: DRAWN BY: CHECKED BY: APPROVED BY: PROJECT NO:SHEETOFDRAWING NO.:321-189 AUGUST 31, 2023 BEB ACH24 DILLON CONSTRUCTION MERCHANTS BANK OFFICE BUILDING 210 3RD AVENUE SW CARMEL, INDIANA 46032REFERENCE 530 E. Ohio Street · Suite G - Indianapolis, IN 46204 317-655-7777 · 877-746-0749 www.cecinc.com 3 08/21/2023 REVISIONS PER CLIENT COMMMENTS 4 08/31/2023 CARMEL CYCLE 2 ADLS/DP RE-SUBMITTALDATE: DWG SCALE: DRAWN BY: CHECKED BY: APPROVED BY: PROJECT NO:SHEETOFDRAWING NO.:SANITARY DETAILS SGJ BEB ACH17C80508/31/20239/21/2023 8AB3456712CDEFGH83456712ABCDEFGHDESCRIPTIONDATENO REVISION RECORD 1 05/26/2023 CARMEL ADLS/DP SUBMITTAL 2 08/03/2023 CARMEL CYCLE 1 ADLS/DP RE-SUBMITTAL DATE: DWG SCALE: DRAWN BY: CHECKED BY: APPROVED BY: PROJECT NO:SHEETOFDRAWING NO.:321-189 AUGUST 31, 2023 BEB ACH24 DILLON CONSTRUCTION MERCHANTS BANK OFFICE BUILDING 210 3RD AVENUE SW CARMEL, INDIANA 46032REFERENCE 530 E. Ohio Street · Suite G - Indianapolis, IN 46204 317-655-7777 · 877-746-0749 www.cecinc.com 3 08/21/2023 REVISIONS PER CLIENT COMMMENTS 4 08/31/2023 CARMEL CYCLE 2 ADLS/DP RE-SUBMITTALDATE: DWG SCALE: DRAWN BY: CHECKED BY: APPROVED BY: PROJECT NO:SHEETOFDRAWING NO.:WATER DETAILS SGJ BEB ACH18C80608/31/20239/21/2023 8AB3456712CDEFGH83456712ABCDEFGHDESCRIPTIONDATENO REVISION RECORD 1 05/26/2023 CARMEL ADLS/DP SUBMITTAL 2 08/03/2023 CARMEL CYCLE 1 ADLS/DP RE-SUBMITTAL DATE: DWG SCALE: DRAWN BY: CHECKED BY: APPROVED BY: PROJECT NO:SHEETOFDRAWING NO.:321-189 AUGUST 31, 2023 BEB ACH24 DILLON CONSTRUCTION MERCHANTS BANK OFFICE BUILDING 210 3RD AVENUE SW CARMEL, INDIANA 46032REFERENCE 530 E. Ohio Street · Suite G - Indianapolis, IN 46204 317-655-7777 · 877-746-0749 www.cecinc.com 3 08/21/2023 REVISIONS PER CLIENT COMMMENTS 4 08/31/2023 CARMEL CYCLE 2 ADLS/DP RE-SUBMITTALDATE: DWG SCALE: DRAWN BY: CHECKED BY: APPROVED BY: PROJECT NO:SHEETOFDRAWING NO.:WATER NOTES AND SPECIFICATIONS SGJ BEB ACH19C80708/31/20239/21/2023 8AB3456712CDEFGH83456712ABCDEFGHDESCRIPTIONDATENO REVISION RECORD 1 05/26/2023 CARMEL ADLS/DP SUBMITTAL 2 08/03/2023 CARMEL CYCLE 1 ADLS/DP RE-SUBMITTAL DATE: DWG SCALE: DRAWN BY: CHECKED BY: APPROVED BY: PROJECT NO:SHEETOFDRAWING NO.:321-189 AUGUST 31, 2023 BEB ACH24 DILLON CONSTRUCTION MERCHANTS BANK OFFICE BUILDING 210 3RD AVENUE SW CARMEL, INDIANA 46032REFERENCE 530 E. Ohio Street · Suite G - Indianapolis, IN 46204 317-655-7777 · 877-746-0749 www.cecinc.com 3 08/21/2023 REVISIONS PER CLIENT COMMMENTS 4 08/31/2023 CARMEL CYCLE 2 ADLS/DP RE-SUBMITTALDATE: DWG SCALE: DRAWN BY: CHECKED BY: APPROVED BY: PROJECT NO:SHEETOFDRAWING NO.:WATER NOTES & DETAILS SGJ BEB ACH20C80808/31/20239/21/2023 WEST ELM STREET3RD AVENUE SWINDUSTRIAL DRIVEPROPOSED LEGEND:12345EROSION CONTROL ITEMS:68AB3456712CDEFGH83456712ABCDEFGHDESCRIPTIONDATENO REVISION RECORD 1 05/26/2023 CARMEL ADLS/DP SUBMITTAL 2 08/03/2023 CARMEL CYCLE 1 ADLS/DP RE-SUBMITTAL DATE: DWG SCALE: DRAWN BY: CHECKED BY: APPROVED BY: PROJECT NO:SHEETOFDRAWING NO.:321-189 AUGUST 31, 2023 BEB ACH24 DILLON CONSTRUCTION MERCHANTS BANK OFFICE BUILDING 210 3RD AVENUE SW CARMEL, INDIANA 46032REFERENCE 530 E. Ohio Street · Suite G - Indianapolis, IN 46204 317-655-7777 · 877-746-0749 www.cecinc.com 3 08/21/2023 REVISIONS PER CLIENT COMMMENTS 4 08/31/2023 CARMEL CYCLE 2 ADLS/DP RE-SUBMITTAL NORTHDATE: DWG SCALE: DRAWN BY: CHECKED BY: APPROVED BY: PROJECT NO:SHEETOFDRAWING NO.:TEMPORARY STORMWATER POLLUTION PREVENTION PLAN 1"=20'C900GENERAL EROSION CONTROL NOTES:SOIL MAPSOIL LEGEND08/31/20239/21/2023 WEST ELM STREET3RD AVENUE SWINDUSTRIAL DRIVEUPMERCHANTS BANKOFFICE BUILDING GARAGEFFE = 838.18BUCKINGHAMMULTI-FAMILY BUILDINGFFE = 838.35MERCHANTS BANKOFFICE BUILDINGGROSS BUILDING = 110,889 SFFFE = 838.350.99 ACRESMFPG = 838.97MLAG = 838.97MFPG = 838.44MLAG = 838.44PROPOSED LEGEND:12345EROSION CONTROL ITEMS:68AB3456712CDEFGH83456712ABCDEFGHDESCRIPTIONDATENO REVISION RECORD 1 05/26/2023 CARMEL ADLS/DP SUBMITTAL 2 08/03/2023 CARMEL CYCLE 1 ADLS/DP RE-SUBMITTAL DATE: DWG SCALE: DRAWN BY: CHECKED BY: APPROVED BY: PROJECT NO:SHEETOFDRAWING NO.:321-189 AUGUST 31, 2023 BEB ACH24 DILLON CONSTRUCTION MERCHANTS BANK OFFICE BUILDING 210 3RD AVENUE SW CARMEL, INDIANA 46032REFERENCE 530 E. Ohio Street · Suite G - Indianapolis, IN 46204 317-655-7777 · 877-746-0749 www.cecinc.com 3 08/21/2023 REVISIONS PER CLIENT COMMMENTS 4 08/31/2023 CARMEL CYCLE 2 ADLS/DP RE-SUBMITTAL NORTHDATE: DWG SCALE: DRAWN BY: CHECKED BY: APPROVED BY: PROJECT NO:SHEETOFDRAWING NO.:PERMANENT STORMWATER POLLUTION PREVENTION PLAN 1"=20'C901GENERAL EROSION CONTROL NOTES:SOIL MAPSOIL LEGENDSOIL LEGEND08/31/20239/21/2023 8AB3456712CDEFGH83456712ABCDEFGHDESCRIPTIONDATENO REVISION RECORD 1 05/26/2023 CARMEL ADLS/DP SUBMITTAL 2 08/03/2023 CARMEL CYCLE 1 ADLS/DP RE-SUBMITTAL DATE: DWG SCALE: DRAWN BY: CHECKED BY: APPROVED BY: PROJECT NO:SHEETOFDRAWING NO.:321-189 AUGUST 31, 2023 BEB ACH24 DILLON CONSTRUCTION MERCHANTS BANK OFFICE BUILDING 210 3RD AVENUE SW CARMEL, INDIANA 46032REFERENCE 530 E. Ohio Street · Suite G - Indianapolis, IN 46204 317-655-7777 · 877-746-0749 www.cecinc.com 3 08/21/2023 REVISIONS PER CLIENT COMMMENTS 4 08/31/2023 CARMEL CYCLE 2 ADLS/DP RE-SUBMITTALDATE: DWG SCALE: DRAWN BY: CHECKED BY: APPROVED BY: PROJECT NO:SHEETOFDRAWING NO.:STORMWATER POLLUTION & PREVENTION NOTES NTS23C902 (B6) RUNOFF CONTROL MEASURES ASSESSMENT OF STORMWATER POLLUTION PREVENTION PLAN CONSTRUCTION COMPONENT (SECTION B)(A1) INDEX OF THE LOCATION OF THE REQUIRED PLAN ELEMENTS IN THE CONSTRUCTION PLAN(A2) A VICINITY MAP DEPICTING THE PROJECTS SITE LOCATION(A3) NARRATIVE OF THE NATURE AND PURPOSE OF THE PROJECT(A6) 11X17-INCH PLAT SHOWING BUILDING LOT NUMBERS/BOUNDARIES AND ROAD LAYOUT/NAMES ASSESSMENT OF CONSTRUCTION PLAN ELEMENTS (SECTION A)(A5) LEGAL DESCRIPTION(A28) LOCATION OF ALL PROPOSED SITE IMPROVEMENTS, INCLUDING ROADS, UTILITIES, LOTDELINEATION AND IDENTIFICATION, PROPOSED STRUCTURES, AND COMMON AREAS(A14) IDENTIFICATION OF ANY OTHER STATE OR FEDERAL WATER QUALITY PERMITS ORAUTHORIZATIONS THAT ARE REQUIRED FOR CONSTRUCTION ACTIVITIES(A27) LOCATIONS OF SPECIFIC POINTS WHERE STORMWATER AND NON-STORMWATERDISCHARGES WILL LEAVE THE PROJECT SITE(A13) IDENTIFICATION AND LOCATION OF ALL KNOWN WETLANDS, LAKES, AND WATER COURSESON OR ADJACENT TO THE PROJECT SITE (CONSTRUCTION PLAN, EXISTING SITE LAYOUT)(A10) NAME(S) OF THE RECIEVING WATER(S)(A21) LOCATIONS WHERE STORMWATER MAY BE DIRECTLY DISCHARGED INTO GROUND WATER,SUCH AS ABANDONED WELLS, SINKHOLES, OR KARST FEATURES(A7) BOUNDARIS OF THE ONE HUNDRED (100) YEAR FLOODPLAINS, FLOODWAY FRINGES, ANDFLOODWAYS(A8) LAND USE OF ALL ADJACENT PROPERTIES(A23) TOTAL EXPECTED LAND DISTURBANCE EXPRESSED IN ACRES(A15) IDENTIFICATION AND DELINEATION OF EXISTING COVER, INCLUDING NATURAL BUFFERS(A12) SOIL MAP OF THE PREDOMINATE SOIL TYPES(A26) LOCATIONS, SIZE, AND DIMENTIONS OF ALL STORMWATER DRAINAGE SYSTEMS SUCH ASCULVERTS, STORMWATER SEWER, AND CONVEYANCE CHANNELS(A29) LOCATION OF ALL ON-SITE AND OFF-SITE SOIL STOCKPILES AND BORROW AREAS(A16) EXISTING SITE TOPOGRAPHY AT AN INTERVAL APPROPRIATE TO INDICATE DRAINAGEPATTERNS(B1) DESCRIPTION OF THE POTENTIAL POLLUTANT GENERATING SOURCES ANDPOLLUTANTS, INCLUDING ALL POTENTIAL NON-STORMWATER DISCHARGES(B12) STORMWATER QUALITY SEQUENCE(B2) STABLE CONSTRUCTION ENTRANCE LOCATIONS AND SPECIFICATIONS(B5) SEDIMENT CONTROL MEASURES FOR SHEET FLOW AREAS(B4) SEDIMENT CONTROL MEASURES FOR CONCENTRATED FLOW AREAS(B7) STORMWATER OUTLET PROTECTION LOCATION AND SPECIFICATIONS(B8) GRADE STABILIZATION STRUCTURE LOCATIONS AND SPECIFICATIONS(B3) SPECIFICATIONS FOR TEMPORARY AND PERMANENT STABILIZATION EROSION CONTROL MEASURES MAINTENANCE REQUIREMENTS(B11) MAINTENANCE GUIDELINES FOR EACH PROPOSED STORMWATER QUALITY SERVICE(B14) MATERIAL HANDLING AND SPILL PREVENTION AND SPILL RESPONSE PLAN MEETINGTHE REQUIREMENTS IN 327 IAC 2-6.1(B13) PROVISIONS FOR EROSION AND SEDIMENT CONTROL ON INDIVIDUAL RESIDENTIAL BUILDING LOTSREGULATED UNDER THE PROPOSED PROJECTASSESSMENT OF STORMWATER POLLUTION PREVENTION PLANCOMPONENT (SECTION C)(C1) DESCRIPTION OF POLLUTATNTS AND THEIR SOURCES ASSOCIATED WITH THEPROPOSED LAND USE(C4) SEQUENCE DESCRIBING STORMWATER MEASURE IMPLEMENTATION(C2) DESCRIPTION OF PROPOSED POST-CONSTRUCTION STORMWATER MEASURES(C3) PLAN DETAILS FOR EACH STORMWATER MEASURE(C5) MAINTENANCE GUIDELINES FOR POST-CONSTRUCTION STORMWATER MEASURES(A4) LATITUDE AND LONGITUDE TO THE NEAREST FIFTEEN (15) SECONDS(A9) IDENTIFICATION OF A U.S. EPA APPROVED OR ESTABLISHED TMDL (TOTAL MAXIMUM DAILYLOAD)(A11) IDENTIFICATION OF DISCHARGES TO A WATER ON THE CURRENT 303(d) LIST OF IMPAREDWATERS AND THE POLLUTANT(S) FOR WHICH IT IS IMPARED(A17) LOCATION(S) WHERE RUN-OFF ENTERS THE PROJECT SITE(A18) LOCATION(S) WHERE RUN-OFF DISCHARGES FROM THE PROJECT SITE PRIOR TO LANDDISTURBANCE(A19) LOCATION OF ALL EXISTING STRUCTURES ON THE PROJECT SITE(A20) EXISTING PERMANENT RETENTION OR DETENTION FACILITIES, INCLUDING MANMADEWETLANDS, DESIGNED FOR THE PURPOSE OF STORMWATER MANAGEMENT(A22) SIZE OF THE PROJECT AREA EXPRESSED IN ACRES(A24) PROPOSED FINAL TOPOGRAPHY(A25) LOCATIONS AND APPROXIMATE BOUNDARIES OF ALL DISTURBED AREAS(A30) CONSTRUCTION SUPPORT ACTIVITIES THAT ARE EXPECTED TO BE PART OF THE PROJECT(A31) LOCATION OF ANY IN-STREAM ACTIVITIES THAT ARE PLANNED FOR THE PROJECTINCLUDING, BUT NOT LIMITED TO, STREAM CROSSING AND PUMP AROUNDS(B9) DEWATERING APPLICATIONS AND MANAGEMENT METHODS(B10) MEASURES UTILIZED FOR WORK WITHIN WATERBODIES(C6) ENTITY THAT WILL BE RESPONSIBLE FOR OPERATION AND MAINTENANCE OF THEPOST-CONSTRUCTION STORMWATER MEASURES(B15) EROSION CONTROL SPECIFICATIONS FOR INDIVIDUAL LOTS08/31/20239/21/2023 8AB3456712CDEFGH83456712ABCDEFGHDESCRIPTIONDATENO REVISION RECORD 1 05/26/2023 CARMEL ADLS/DP SUBMITTAL 2 08/03/2023 CARMEL CYCLE 1 ADLS/DP RE-SUBMITTAL DATE: DWG SCALE: DRAWN BY: CHECKED BY: APPROVED BY: PROJECT NO:SHEETOFDRAWING NO.:321-189 AUGUST 31, 2023 BEB ACH24 DILLON CONSTRUCTION MERCHANTS BANK OFFICE BUILDING 210 3RD AVENUE SW CARMEL, INDIANA 46032REFERENCE 530 E. Ohio Street · Suite G - Indianapolis, IN 46204 317-655-7777 · 877-746-0749 www.cecinc.com 3 08/21/2023 REVISIONS PER CLIENT COMMMENTS 4 08/31/2023 CARMEL CYCLE 2 ADLS/DP RE-SUBMITTALDATE: DWG SCALE: DRAWN BY: CHECKED BY: APPROVED BY: PROJECT NO:SHEETOFDRAWING NO.:STORMWATER POLLUTION & PREVENTION DETAILS AS NOTED24C903DETAIL 903 - CONCRETE WASHOUT BMPDETAIL 905 - EROSION CONTROL INLET PROTECTIONFOR CURB INLET AND CATCH BASINSDETAIL 906 - NON-PAVED AREA CATCHBASIN INLET PROTECTION DETAILDETAIL 901 - TEMPORARY CONSTRUCTION ENTRANCEDETAIL 904 - STRAW BALE FOR CONCRETEWASHOUTDETAIL 902 - SILT FENCE08/31/20239/21/2023