Loading...
HomeMy WebLinkAboutC603 Site Details05481 US 31 SOUTH, CHARLEVOIX, MI 49720 (866) 222-8400 ext 3010 ● engineering@redi-rock.com www.redi-rock.com DRAWN BY: FILE:SHEET: DATE: TITLE: APPROVED BY: JRJ 06-22-2015 JRJ 1 of 1 Typical Combination Reinforced / Gravity Wall Section 3 Typical Combination Wall PC 062215.dwg TYPICAL COMBINATION REINFORCED/GRAVITY WALL WITH POSITIVE CONNECTION (PC) BLOCKS NO SCALE AASHTO NO. 57 STONE TO EXTEND AT LEAST 12" BEHIND WALL LEVELING PAD (AS SPECIFIED) PERFORATED DRAIN (L) (LENGTH OF GEOGRID STRIP - TYPICAL) 12" WIDE STRIP OF GEOGRID WRAPPED THROUGH BLOCK AND EXTENDING FULL LENGTH (L) BACK INTO REINFORCED FILL ZONE (TYPICAL) MOVE BLOCKS FORWARD DURING INSTALLATION TO ENGAGE SHEAR KNOBS (TYPICAL) 28" PC MIDDLE BLOCK (TYPICAL) · This drawing is for reference only. · Final designs for construction must be prepared by a registered Professional Engineer using the actual conditions of the proposed site. · Final wall design must address both internal and external drainage and shall be evaluated by the Professional Engineer who is responsible for the wall design. EXPOSED WALL NON-WOVEN GEOTEXTILE FABRIC (IF SPECIFIED) FILL SLOT AND WEDGE BETWEEN BLOCKS WITH STONE NON-WOVEN GEOTEXTILE REINFORCED SOIL 28" PC TOP BLOCK GRADE TO DRAIN SURFACE WATER AWAY FROM WALLSETBACK = 1 58" (5° Batter Angle On Wall) UTILITIES INSTALLED IN AREA ABOVE GEOGRID REINFORCEMENT RETAINED SOIL 41" PC MIDDLE BLOCK (TYPICAL) SELECT FILL TO EXTEND hgravity ≥ 8' MINIMUM (USE REINFORCED ZONE MATERIAL) BURY DEPTH Control joint (if needed) Leveling pad or lower courses of Redi-Rock blocks Concrete collar (Cast-in-place around pipe) 12" rcp protruding through wall Remove only the minimum number of blocks required to fit pipe through wall Use adequate measures to address scour, runoff, and other issues at base of wall Concrete collar (Cast-in-place around pipe) Non-woven geotextile fabric (AASHTO M288 Survivability Class 1) 360° around pipe and behind collar This drawing is for reference only. Determination of the suitability and/or manner of use of any details contained in this document is the sole responsibility of the design engineer of record. Final project designs, including all construction details, shall be prepared by a licensed professional engineer using the actual conditions of the proposed site. Pipes Installed Perpendicular Through Wall Section View 12" rcp protruding through wall Use adequate measures to address scour, runoff, and other issues at base of wall Plan View 05481 US 31 SOUTH, CHARLEVOIX, MI 49720 (866) 222-8400 ext 3010 ● engineering@redi-rock.com www.redi-rock.com DRAWN BY: FILE:SHEET: DATE: TITLE: APPROVED BY: JRJ 06-22-2015 JRJ 1 of 1 Pipes Installed Perpendicular Through Wall 1 Pipe Installed Perpendicular Through Wall 062215.dwg PLOT DATE: 9/15/2020 5:00 PMPLOT SCALE: 1:2.5849EDIT DATE: 9/15/2020EDITED BY: NHORGANDRAWING FILE: P:\2018\00053\D. Drawings\Civil\Construction Documents\2018.00053.CE.C600.SD.dwg9025 River Road, Suite 200 | Indianapolis, Indiana 46240 TEL 317.547.5580 | FAX 317.543.0270 www.structurepoint.com Project Number CERTIFIED BY ISSUANCE INDEX DATE: PROJECT PHASE: REVISION SCHEDULE NO.DESCRIPTION DATE 07/09/2019 ADLS/DP 2018.00053 NAPLETON KIA OF CARMEL 96th Street & Randall Drive Indianapolis, IN 46280 APPROVAL PENDINGNOT FOR CONSTRUCTION1 CITY COMMENT 07/30/19 2 CITY COMMENT 12/04/19 3 CITY COMMENT 2/24/20 4 CITY COMMENT 6/19/20 5 CITY COMMENT 7/13/20 6 STR112 RIM 8/05/20 7 CITY COMMENT 8/19/20 8 CITY COMMENT 8/27/20 9 CITY COMMENT 9/15/20 C603 SITE DETAILS