HomeMy WebLinkAboutC2.0.Development Plan846
847847848849 850849849848849
84984884984984884984
8
847 848847846851
8
5
0
W
W
W
W
W
G
850849848849
849
85084
6
84
7 845845
8478468488
4
9847845
0.274 Ac ±
11,919 SF
PAD = 62'x60'
LOT 36B
0.36 Ac ±
15,760 SF
PAD = 65'x60'
LOT 35B
LOT 35A
0.36 Ac ±
15,760 SF
PAD = 50'x60'
GRAHAM, THOMAS & JOANSARTORIUS, CARL J & ANDREA A
GULLEY, MARK E & AMY D
HOLLIBAUGH, DIANE R
HOLLIBAUGH, DIANE R
SHEA, PAUL E
STRONG, DAVID C & DEBORAH A
CROOKS, CHERYL L
BRIDGEWATER MASTERS, LLC
ROBERTS, GREG & SHERRI
LOT 37
LOT 124
LOT 125
LOT 126
LOT 127
LOT 123LOT 48LOT 47
LOT 122
LOT 121
NAPPANEE DRIVE
LOT 46
SHOSHONE DRIVE OSWEGO ROADEx. Shed
845845845
845845843
84484484
4
0.346 Ac ±
15,070 SF
LOT 36A
PAD = 92'x55'
(Oswego Front)
PAD = 65'x60'
(Shoshone Front)
20'
846 84684635' B.S.L.35' B.S.L.35' B.S.L.10' D. & U.E.10' D. & U.E.EXISTING CURB INLET
GUT=846.23±
INV=839.5± (S-24" RCP)
INV=838.5± (E/W 30" RCP)
EXISTING 30"x30" BEEHIVE INLET
TC=843.7±
INV=841.08± (S-12" HDPE)
INV=840.98± (N-24" RCP)
EXISTING 30" RCP
EXISTING 30" RCP
EXISTING 24" RCP
10' D. & U.E.5' BUFFERYARD5' BUFFERYARD
10' B.Y.5' BUFFERYARD5' BUFFERYARD 5' BUFFERYARDEXISTING STORM MH
TC=845.6±
101
BD
103
MLAG = 849.50
MFPG = 849.50
MLAG = 850.0
MFPG = 850.0
MLAG = 850.5
MFPG = 850.5
MLAG = 849.25
MFPG = 849.25
BH4
BH3
BH2
20' Tree Preservation Area
EX. 12
"
H
D
P
E
S
T
M EX. 12" HDPE STMEX. 12" HDPE STM
EXISTING 12"
HDPE STM
BH1
78' of 12" HDPE @ 0.49%POND OUTLET STR# OC1
TC=845.0
INV=842.5± (6" Ø)
INV=842.50 (N-12" HDPE)
OC1
FYOC
SHBH
24" PIPES (QTY 4)
SEE DETAIL 10/C7.1VAR. D. & BMP E.VEGETATED SWALEBMP/DETENTIONVAR. D. & BMP E.EXISTING STORM MH
TC=843.74±
INV=841.19± (W/N-12" HDPE)
EXISTING INLET
TC=845.66±
INV=841.21± (E/S-12" HDPE)
EXISTING INLET
TC=843.91±
INV=842.12 (S-12" HDPE)
INV=842.12 (S-6" PERF. PVC)
INV=842.11± (NE-12" HDPE)
EXISTING INLET
TC=846.55±
INV=841.40± (SW/N-12" HDPE)
20' D.E.
4' U.E.
10' D. & U.E.
847 848
847 848 849
849848
848TRANSITIONAL GRADING
REQUIRED IN THIS AREA
TOLSON, TIMOTHY P &
BRENDA COOMBS
EXISTING BEEHIVE INLET
TC=845.3±
RIM=844.86
INV=841.11± (NW-12" RCP)EXISTING CONC. CULVERT
INV (W) = 844.99
INV (E) = 844.87
NEW 5'Ø MANHOLE w/ SNOUT ON
WEST OUTLET PIPE. (SEE DETAILS
ON SHEET C7.0). T.C.=849.0
5' CONC. WALK 5' CONC. WALK846 EX. FIRE HYDRANT
EX. FIRE HYDRANT
M1
M2
M3M4
PROPOSED 24" HDPE
PIPE MANIFOLD
EXISTING NORTH R/W PER NEWARK
ADDITION INST. #22262, D.R. 11925'
25'
28'
HALF
R/W
28' HALF R/W EXISTING WEST R/W PER NEWARKADDITION INST. #22262, D.R. 119Existing Dwelling
EXISTING WATER MAIN
EXISTING SANITARY MAIN222' of 6" 'DUAL WALL'PERFORATED PVCPIPE @ 0.49%TBM #1
T.C.=847.29
12" CONC. END SECTION
INV=847.45
12" CONC. END SECTION
INV=847.35
16' of 12" RCP @ 0.63%
10' DRAINAGE
& BMP ACCESS
ESMT.
201
3:1 SLOPE
3:1 SLOPE
3:1 SLOPE
3:1 SLOPE
SW
POND OUTLET STR# FYOC
TC=849.25
INV=844.50 (N-24" HDPE)
INV=844.50 (E-24" HDPE)
INV=844.50 (SW-8" SCH40 PVC)
20' of 8" SCH40 PVC @1.80%
NEW BEEHIVE INLET
RIM = 846.15
INV.=844.15 (NE - 8" SCH40 PVC)
INV.=844.05 (W - 8" SCH40 PVC)
EXISTING BEEHIVE INLET
TC=846.05
RIM=845.55
INV.=843.7± (E - 8" SCH40 PVC)
INV=843.65 (S-EX. 12" RCP)
78 LF of 8" SCH40 PVC @ 0.45%
200
F.F.E.=849.75 (min.)
F.F.E.=851.0 (min.)
F.F.E.=850.50 (min.)
F.F.E.=850.0 (min.)
132 SHOSHONE DR.
122 SHOSHONE DR.
1034 OSWEGO ROAD
1032 OSWEGO ROAD
T.O.B.=845.50
2yr=843.63
10yr=844.07
100yr=844.95
N
N
N 30'
RH
RH
PROJECT NUMBER
DRAWING NUMBER
SHEET OF
SCALE:
DATE:
DWN BY:
CHKD. BY:CIVIL SITE GROUP, INC.GROUP, INC.PROF
E
SS
IONA L E NG INEERIND
IA NA
PE10910647
STATE OF
-oNREGISTEREDBRIANSCR
O
S
SSBL.003
C2.0CARMEL, INDIANA 460334630 LISBON DRIVESIGMA BUILDERS, LLC.DEVELOPMENT PLANCOOMBS PROPERTY REDEVELOPMENTNW CORNER OF SHOSHONE DRIVE & OSWEGO ROADCARMEL, INDIANA 4603204/20/2018
ENGINEER:
SURVEYOR:
OWNER:
NOTE
REFER TO ARCHITECTURAL &
FOUNDATION PLANS FOR ALL
BUILDING DIMENSIONS.
SITE LAYOUT NOTES
18 " OF VERTICAL SEPARATION MUST BE
MAINTAINED FOR ALL UTILITY CROSSINGS
LEGEND:
CONTRACTOR NOTE
NO EARTH DISTURBING ACTIVITY MAY COMMENCE
WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT.
UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE
THE RESPONSIBILITY OF THE DEVELOPER. UTILITY LINE
RELOCATIONS REQUIRED FOR ROAD PROJECTS THAT RESULT
IN A CONFLICT WITH PROPOSED DEVELOPMENT SHALL BE THE
DEVELOPER'S RESPONSIBILITY TO RESOLVE WITH THE UTILITY.
EXISTING POLE LINES REQUIRED TO BE RELOCATED TO WITHIN
ONE FOOT OR THE PROPOSED RIGHT-OF-WAY LINE.
ALL CONCRETE PIPE JOINTS SHALL
BE CONTINUOUS O-RING RUBBER
GASKET CONFORMING TO ASTM C 443
FLOOD NOTE
GRADING NOTES
GENERAL NOTES
CONTRACTOR TO KEEP EXISTING PAVEMENT SURROUNDING THE SITE (I.E.
SHOSHONE DRIVE & OSWEGO ROAD) "BROOM CLEAN" AND FREE OF SOIL
OR AGGREGATE THAT MIGHT BE BROUGHT OFF-SITE.
DEPENDING ON THE CONSTRUCTION SEASON, MOISTURE CONTENT AND
PROPERTIES OF THE SOILS ON SITE, CHEMICAL MODIFICATIONS AND/OR
LIME STABILIZATION MAY BE REQUIRED. SEE SHEET C9.0 FOR
SPECIFICATIONS.
ALL CONCRETE PIPE JOINTS SHALL BE CONTINUOUS O-RING RUBBER
GASKET CONFORMING TO ASTM C 443
CONTRACTOR (NOT THE PROJECT SITE OWNER) WILL BE RESPONSIBLE
FOR THE DISPOSAL OF ANY SOIL, MATERIALS, ETC. NO OFF-SITE BORROWS
OR STOCKPILES WILL BE NEEDED FOR THIS PROJECT.
REVISION RECORDTOPOGRAPHIC & BOUNDARY NOTE
TOTAL SITE AREA = 1.34 +/- ACRES
TOTAL LOTS = 4 (MIN. 80' WIDTH)
PROPOSED DENSITY = 4/1.34 = 2.99 +/- UNITS/ACRE
TOTAL MIN. OPEN SPACE = 0.87 +/- ACRES / 38,031± S.F.
OPEN SPACE PERCENTAGE (MIN.) = (0.87/1.34)x100 = 65%
SUBJECT PARCEL ZONING = R-2 (SINGLE FAMILY RESIDENTIAL)
SURROUNDING ZONING:
NORTH - R2 SOUTH - R2 EAST - R2 WEST - R2
ANTICIPATED CONSTRUCTION START/END DATE:
JULY 3, 2018 - AUGUST 2019
OVERALL DEVELOPMENT SUMMARY
BENCHMARK
PLAN NOTES:
M1
M2
M3
M4
MINIMUM FLOOD PROTECTION GRADE &
LOWEST ADJACENT GRADE DEFINITIONS
We have shown four (4) edge-of-pavement grades on Oswego Road & Shoshone Drive which represent the lowest adjacent grade to
each of the four residential lots (M1=848.25, M2=848.75, M3=849.25, M4=848.0). The minimum F.F.E. is to be at 15” above the
Oswego Road Grade or Shoshone Drive Grade. The local flood overflow route for the new dry detention pond is 845.50; therefore, one
(1) foot above the aforementioned elevation would be 846.50, which represents the MFPG . The 100-year elevation of the off-site pond
is 844.95 and does not come into play. Therefore, the MLAG/MFPG for each residential lot has been set at: Lot '35A' = 849.50, Lot
'35B' = 850.0, Lot '36A' = 850.50, and Lot '36B' = 849.25. The minimum F.F.E. shall be no less than 6" above finished grade around the
building. The MFPG and MLAG are calculated correctly and the set F.F.E. of the future residential homes will be constructed in
compliance with the STSM. The MFPG of all structures fronting a pond or open ditch shall be no less than 2 feet above any adjacent
100-year local or regional flood elevations, whichever is greater, for all structural features where floodwaters could enter the building.
This project is located at the Northwest corner of Shoshone Drive and Oswego Road comprising of 1.34 Acres ±. The property has been a single family
residence since 1940. The proposed improvements will consist of reverting the original lots 35 & 36 of the Newark Subdivision into four (4) different lots (35A,
35B, 36A, and 36B). Each lot will have a new single family home built within the R-2 zoning district standards. Existing trees will be removed in the location of
each home site to be constructed, as needed.
Pre-Developed Site Conditions:
The existing site predominantly drains via overland flow to the west and north. The front yard area of the existing home site along Shoshone Drive drains to the southwest
and into an existing roadside beehive inlet on the north side of Shoshone Drive. The stormwater ultimately makes its way west to the storm sewer pipes in Range Line Road,
then the WR Fertig Drain to Carmel Creek.
Post-Developed Site Conditions:
Overall storm water runoff discharge rates from the site will be reduced with the implementation of the new Infiltration detention system and storm sewer outlet pipe
installation to the north (existing storm sewer at Napannee & Oswego). After collaboration with the City of Carmel Engineering Department staff, at a minimum,
Post-Developed discharge rates will be reduced as follows: Post-Developed 100yr <= Pre-Developed 10yr, Post-Developed 10yr <= Pre-Developed 2yr. Post-developed
runoff rates can be seen on Sheet C4.2. Stormwater improvements will also be made to the right-of-way swales along the south and east property lines. A 24" HDPE storm
pipe detention system at the south end of the property will also help improve the stormwater runoff conditions in the area. The 24" HDPE storm pipe detention system and
the new infiltration detention system will both have outlet control structures to reduce the discharge rate to their ultimate destination. Details of all storm infrastructure
improvements can be seen on Sheet C7.0. The new Dry Pond will have a storage volume of 1,252 cubic yards. The new underground detention facility will have a storage
volume of 1,202 cubic feet (design volume = 0.0275 acre-ft). It has been discussed with the City of Carmel Engineering Department that the proposed storage volume of both
the dry detention pond and the underground detention facility is an adequate amount of storage for this project. It has been agreed upon that the proposed improvements will
somewhat enhance the existing insufficient drainage situation for the site and the surrounding properties.
Dry Detention Pond (Str. #OC1) - Allowable Release Rates: 10-YR=1.73 cfs, 100-YR=3.80 cfs, Post-Developed Discharge Rates: 10-YR=1.17 cfs, 100-YR=1.74 cfs
Shoshone Drive R/W Swale (Str. #FYOC) - Allowable Release Rates: 10-YR=1.3 cfs, 100-YR=2.77 cfs, Post-Developed Discharge Rates: 10-YR=0.97 cfs, 100-YR=1.85 cfs
DRAINAGE SUMMARY
ALL EXISTING PERIMETER ROAD DRAINAGE STRUCTURES AND BRIDGES ACROSS THE FRONTAGE OF
THIS DEVELOPMENT ARE INDICATED ON THE PLANS. PROVISIONS HAVE BEEN MADE TO IMPROVE OR
REPLACE ANY DRAINAGE STRUCTURES AND BRIDGES AS NECESSARY OR AS REQUESTED BY THE CITY
TO ACCOMMODATE THE PAVEMENT WIDENING, AUXILIARY LANES, MULTI-USE PATH, AND ANY OTHER
REQUIRED IMPROVEMENTS TO THE PROPERTY OR THE ROADWAY. THE COST TO IMPROVE OR REPLACE
ANY DRAINAGE STRUCTURES AND BRIDGES WILL BE THE DEVELOPER'S RESPONSIBILITY.
STORM SEWER SYSTEM NOTE
ALL STORM SEWER INFRASTRUCTURE TO
BE CONSTRUCTED WITH THE PROJECT
LIMITS SHALL BE PRIVATELY OWNED AND
MAINTAINED BY SIGMA BUILDERS, LLC.
SW
RH
N
SITE DISCHARGE RATES
BASIN "EXIST"BASINS: "DRY POND"+"36BFY"+
"SHBH1"+"SHBH2"+"D-BH4"+"D-101"
PRE-DEVELOPED POST-DEVELOPED
2YR
10YR
100YR
1.19 cfs
2.60 cfs
6.32 cfs
1.80 cfs
2.59 cfs
4.52 cfs