HomeMy WebLinkAboutC101 SWPPP PHASE 2D D D D D
D
D
D
D
D
D
D
D
D
D
D DD DD
D
D
D
D
D
D
D
DD
DDDDDDDDD
D
DDD
DDDDDDDDDDD
D
D
D
D
D
D
D
D
DDDDDDDDDDDDDDDDDDDDDDDDDDDDDD
D
DDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDD SANSAN
EEEE
E
E
E
E
E
E
E
E
E
E
E
E
E
E
EGGGGGGGGGGGGGGGGGG GWWWWWWWWWWWWWWWWWWT(U)T(U)T(U)T(U
)T(U
)T(U
)T(U)T(U)T(U
)T(U)T(U
)T(U)T(U)WFM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM
FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM
US 421
(M
ICH
IGAN
ROAD
)
NOTTING
H
A
M
W
A
Y
G
W
C
C
3.41 ACRES
W
C
C
G
EEEEEEEEEEE*
IP
IP
IP
IP
IP
IP
IP
IP
IP IP
IP
IP
CONTACT PERSON FOR EROSION
CONTROL & SEDIMENT PRACTICES
WEIHE ENGINEERS, INC.
10505 N. COLLEGE AVE.
INDIANAPOLIS, IN 46268
TELEPHONE: (317) 846-6611
FAX: (317) 843-0546
EMAIL: PARKERF@WEIHE.NET
CONTACT PERSON: FRED PARKER, CPESC
-WARNING-
THIS PLAN TO BE USED FOR EROSION CONTROL PURPOSES
ONLY. ADDITIONAL EROSION CONTROL MEASURES MAY BE
REQUIRED IN THE FIELD BY THE INSPECTOR.
-NOTE-
THIS PLAN INDICATES EROSION CONTROL MEASURES
REQUIRED AFTER SOIL STRIPPING AND PAD BUILDING HAS
TAKEN PLACE. COORDINATE WITH DEVELOPER FOR
MEASURES REQUIRED UNTIL PROPERTY TURNED OVER FOR
DEVELOPMENT. COORDINATE WITH SOIL CONSERVATION
DISTRICT REPRESENTATIVE FOR ANY OTHER MEASURES
REQUIRED DUE TO SITE CONDITIONS.
DISTURBED ACREAGE
= 3.40± AC.
LAND DESCRIPTION
A PART OF THE SOUTHWEST QUARTER OF SECTION 6, TOWNSHIP 17
NORTH, RANGE 3 EAST OF THE SECOND PRINCIPAL MERIDIAN, HAMILTON
COUNTY, INDIANA, DESCRIBED AS FOLLOWS:
COMMENCING AT THE SOUTHWEST CORNER OF SAID SOUTHWEST
QUARTER; THENCE NORTH 00 DEGREES 19 MINUTES 30 SECONDS EAST
(ASSUMED BEARING) ALONG THE WEST LINE OF SAID SOUTHWEST
QUARTER, A DISTANCE OF 754.78 FEET TO THE POINT OF BEGINNING;
THENCE CONTINUING NORTH 00 DEGREES 19 MINUTES 30 SECONDS
EAST ALONG SAID WEST LINE, A DISTANCE OF 559.62 FEET; THENCE
NORTH 85 DEGREES 23 MINUTES 52 SECONDS EAST A DISTANCE OF
546.60 FEET TO THE WEST RIGHT OF WAY LINE FOR STATE ROAD 421;
THE FOLLOWING TWO CALLS BEING ALONG SAID WEST RIGHT OF WAY
LINE: 1) THENCE SOUTH 20 DEGREES 36 MINUTES 55 SECONDS EAST A
DISTANCE OF 9.97 FEET TO THE BEGINNING OF A CURVE WITH A RADIUS
OF 17336.45 FEET, THE RADIUS POINT OF WHICH BEARS NORTH 72
DEGREES 47 MINUTES 55 SECONDS EAST: 2) THENCE ALONG SAID
CURVE A DISTANCE OF 420.04 FEET: THENCE SOUTH 27 DEGREES 19
MINUTES 31 SECONDS WEST A DISTANCE OF 34.04 FEET; THENCE
SOUTH 71 DEGREES 14 MINUTES 52 SECONDS WEST A DISTANCE OF
423.77 FEET TO THE BEGINNING OF A CURVE WITH A RADIUS OF 79.00
FEET, THE RADIUS POINT OF WHICH BEARS SOUTH 18 DEGREES 45
MINUTES 08 SECONDS EAST; THENCE SOUTHWESTERLY ALONG SAID
CURVE A DISTANCE OF 49.66 FEET; THENCE NORTH 89 DEGREES 40
MINUTES 30 SECONDS WEST A DISTANCE OF 224.56 FEET TO THE POINT
OF BEGINNING, CONTAINING 7.54 ACRES, MORE OR LESS.
C101SWPPP PHASE 2w170533-C101 swppp2SWPPP PHASE 2 LEGEND
- INLET PROTECTION - USE SUBSURFACE
INLET PROTECTION WITH OVERFLOW CAPABILITY
(DANDY SAC)
- PERMANENT/TEMPORARY SEEDING
USE PLANTING CHART
- EROSION CONTROL BLANKET - USE S150BN BIO-NET AS
SUPPLIED BY NORTH AMERICAN GREEN OR APPROVED
EQUAL
- CONSTRUCTION ENTRANCE
- STAGING AREA
- POSTING AREA - 4" PVC TUBE WITH END CAPS ATTACHED TO
PROJECT CONSTRUCTION SIGN TO CONTAIN APPROVED
CONSTRUCTION DRAWINGS AND PERMITS FOR
INSPECTORS.
- CONCRETE WASHOUT
- SILT FENCE
- INSTALL STRAW WATTLES (GRASS AREA) OR SILT DIKES
(PAVEMENT AREA) AS SHOWN. CONTRACTOR TO ADD
ADDITIONAL MEASURES AS CONSTRUCTION PHASING AND
SITE CONDITIONS DICTATE
- ROCK CHECK DAM
- LIMITS OF DISTURBANCE (CONSTRUCTION LIMITS)
- RIPRAP, REFER TO GRADING PLAN SHEET C300 FOR SIZING
- SITE DISCHARGE POINT
SD
IP
SF
*
D
LINE TYPES
UNDERGROUND GAS
UNDERGROUND WATER
AERIAL ELECTRIC
UNDERGROUND ELECTRIC
UNDERGROUND COMMUNICATIONS
AERIAL COMMUNICATIONS
OVERHEAD UTILITY
FORCE MAIN
RIGHT OF WAY LINE
CHAIN LINK FENCE
BOARD FENCE
WROUGHT IRON FENCE
GUARD RAIL
HAND RAIL
SILT FENCE
BUILDING SETBACK LINE
BOUNDARY LINE
FLOW LINE
G G G
W W
E(A)E(A)
E E E
C C C
C(A)C(A)
OHU OHU
FM FM
SF SF
AERIAL FIBER OPTIC CABLEFO(A)FO(A)
SECTION LINE
FARM FENCE
UNDERGROUND FIBER OPTICFOFO
INDEX CONTOUR
INTERMEDIATE CONTOUR
SANITARY SEWER
STORM SEWER
EROSION CONTROL NOTES
1.ALL DISTURBED AREAS SHALL BE SODDED OR SEEDED, EXCEPT
BUILDING PAD AND LANDSCAPE BEDS. SEE LANDSCAPE PLANS FOR
LOCATION OF LANDSCAPE BEDS.
2.INSTALL SILT FENCE ALONG ALL DOWNSTREAM SLOPES. SILT FENCE
TO FOLLOW CONTOUR.
3.THERE SHALL BE NO DIRT, DEBRIS OR STORAGE OF MATERIAL IN THE
STREET.
EROSION CONTROL SPECIFICATIONS
1.THIS PLAN IS DESIGNED AS AN ATTEMPT TO PREVENT ANY AND ALL
SEDIMENT FROM LEAVING THE CONSTRUCTION SITE BY WAY OF
EROSION. IF EROSION OF SEDIMENT FROM THE SITE IS TAKING
PLACE, THE CONTRACTOR AND/OR OWNER SHALL TAKE
PREVENTATIVE ACTION IMMEDIATELY. THE ENGINEER SHALL BE
CONSULTED IN THE EVENT THIS HAPPENS.
2.TEMPORARY SEEDING IS TO BE APPLIED TO ANY DISTURBED AREA
THAT WILL REMAIN UNALTERED IN EXCESS OF 15 DAYS.
3.PERMANENT SEEDING IS TO BE APPLIED IMMEDIATELY TO AREAS
THAT HAVE ACHIEVED FINAL AND FINISHED GRADE.
4.PRESERVE EXISTING VEGETATION ON THE SITE WHENEVER AND
WHEREVER POSSIBLE TO PREVENT TOPSOIL EROSION.
5.ALL SEDIMENT CAPTURING MEASURES SHALL BE IMPLEMENTED
PRIOR TO THE DISTURBANCE OF THE CONSTRUCTION AREA THEY
ARE INTENDED TO SERVICE. ALL EROSION CONTROL MEASURES
PROPOSED ARE TO BE PROPERLY MAINTAINED TO CONTINUE THEIR
EFFECTIVENESS.
6.IF GRADING OCCURS DURING THE MONTHS OF DECEMBER, JANUARY
OR FEBRUARY DORMANT SEEDING PROCEDURES SHALL BE USED.
7.DURING DRY WEATHER, KEEP LAWNS WATERED WITH SPRINKLERS
OR OTHER APPROVED METHODS. RESEED ANY AREAS NOT
GERMINATING OR DAMAGED AT INTERVALS AS MAY BE REQUIRED
ACCORDING TO SEASONAL CONDITION AND/OR CONSTRUCTION
ACTIVITY. WATER GRASS AND EXECUTE NECESSARY WEEDING UNTIL
FULL STAND OF GRASS HAS BEEN OBTAINED.
8.THE IMPLEMENTATION AND MAINTENANCE OF THE EROSION
CONTROL IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR
AND/OR OWNER.
9.IT SHALL BE THE CONTRACTOR'S AND/OR OWNER'S RESPONSIBILITY
TO MINIMIZE SEDIMENTATION (FROM ON-SITE CONSTRUCTION
ACTIVITIES) FROM BEING DEPOSITED ONTO ADJACENT PROPERTIES
AND RECEIVING STREAMS/DITCHES IN STRICT COMPLIANCE WITH
"RULE 5" (327 IAC 15-5, CONSTRUCTION ACTIVITY STORM WATER
RUNOFF CONTROL). IT SHALL ALSO BE THE CONTRACTOR'S AND/OR
OWNER'S RESPONSIBILITY TO OBTAIN ANY APPROVALS REQUIRED
FROM THE LOCAL AUTHORITY AND TO SUBMIT A COMPLETE NOTICE
OF INTENT LETTER TO THE OFFICE OF WATER MANAGEMENT,
INDIANA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT PRIOR TO
ANY CONSTRUCTION ACTIVITY.
10.FOR SEASONAL VARIATIONS - SEE SEASONAL SOIL PROTECTION
CHART IN THESE PLANS.
11.PORTABLE TOILETS MUST BE ANCHORED.
CD
REVISIONS AND ISSUESPart of SW/4, Section 6, Township 17 North, Range 7 East, Clay Township, Hamilton County, IndianaW17.0533PREPARED FOR:10650 N MICHIGAN RD, ZIONSVILLE, IN 46077PROJECT NO.
SHEET NO.CHECKED BY:DRAWN BY:RLWDESIGNED BY:DWG NAME:PROJECT NO.:W17.0533DATEBY05.08.2019SSRDATE:RLWKnow what's below.
before you dig.Call
R
NOTTINGHAM, LLC OUTLOTSSUBMITTED FOR TAC REVIEW10.19.2018RLWW
S
N
E
STEVEN SCOTT RUCKER P.E. 11300279ENGINEERS317 | 846 - 6611800 | 452 - 6408317 | 843 - 0546 faxWEIHELand Surveying | Civil EngineeringLandscape ArchitectureALLAN H. WEIHE, P.E., L.S. - FOUNDER10505 N. College AvenueIndianapolis, Indiana 46280weihe.netBuild with confidence.SM05.08.2019ADDRESSING TAC COMMENTS03.08.2019RLWADDRESSED DRAINAGE REVIEW COMMENTS03.26.2019RLWPLANS UPDATED FOR REVIEW COMMENTS04.29.2019RLWFINAL CONSTRUCTION PLANS05.08.2019RLWBENCHMARK INFORMATION
SOURCE BENCHMARK:
NATIONAL GEODETIC SURVEY MONUMENT: PID KA2086
ABOUT 0.2 EAST ALONG 121ST STREET FROM ITS JUNCTION WITH SR 421 (AKA MICHIGAN ROAD), AT THE
INTERSECTION WITH DAUGHERTY DRIVE, IN THE NORTHEAST CORNER OF THE INTERSECTION. A
STANDARD DISK, STAMPED BOO 54 1989, SET IN THE TOP OF A CONCRETE POST LEVEL WITH THE
GROUND.
ELEV = 900.76 (NAVD 88)
TBM-1:
CUT "X" IN SOUTH BONNET NUT OF FIRE HYDRANT, LOCATED 188 FEET NORTH OF 106TH STREET AND 27
FEET WEST OF THE CENTER OF NOTTINGHAM WAY.
ELEV = 897.71 (NAVD 88)
TBM - 2:
NORTH BONNET NUT OF FIRE HYDRANT, LOCATED 62 FEET WEST OF CENTER OF MICHIGAN ROAD AND
104 FEET NORTH OF CENTERLINE OF NOTTINGHAM WAY.
ELEV = 901.01 (NAVD 88).