HomeMy WebLinkAboutC601 STORM SEWER PLAN AND PROFILESANSANFM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM
FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM
3.41 ACRES
EEEEEEEEESTORM 205-200
885
890
895
900
905
-0+500+000+501+001+502+002+503+003+50
STORM 208-202
885
890
895
900
905
-0+500+000+501+001+50
STORM 102-104
885
890
895
900
905
0+000+501+001+502+00
STORM 206-201
885
890
895
900
905
-0+500+000+501+00
C601STORM SEWER PLAN AND PROFILEW
S
N
E
STORM SEWER NOTES
1.THE CONTRACTOR SHALL ADHERE TO ALL TERMS AND CONDITIONS AS OUTLINED IN THE
EPA OR APPLICABLE STATE GENERAL N.P.D.E.S. PERMIT FOR STORMWATER DISCHARGE
ASSOCIATED WITH CONSTRUCTION ACTIVITIES AND STORMWATER POLLUTION
PREVENTION PLAN.
2.REFER TO THE INDIANA DEPARTMENT OF TRANSPORTATION (INDOT) STANDARD
SPECIFICATIONS, LATEST EDITION, FOR BASIC MATERIALS AND CONSTRUCTION METHODS.
THE SECTIONS BELOW FOR VARIOUS ITEMS ARE TO CLARIFY THE INTENT OF THE
REQUIREMENTS FOR THIS PROJECT. PLEASE NOTE THAT OTHER SECTIONS OF THE INDOT
STANDARD SPECIFICATIONS MAY ALSO BE APPLICABLE.
3.THE CONTRACTOR SHALL CONTACT APPLICABLE STATE UNDERGROUND LOCATION
SERVICE AT LEAST 72 HOURS PRIOR TO ANY WORK AND SHALL CONTACT THE OWNER
AND/OR ENGINEER SHOULD UTILITIES APPEAR TO BE IN CONFLICT WITH THE PROPOSED
IMPROVEMENTS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE
ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN
ON THE PLANS.
4.THE PLANS SHOW THE LOCATION OF ALL KNOWN UTILITIES LOCATED WITHIN THE LIMITS
OF CONSTRUCTION ACCORDING TO INFORMATION PROVIDED BY THE VARIOUS UTILITY
COMPANIES, PREVIOUS CONSTRUCTION PLANS AND AS EVIDENCED BY OBSERVATION OF
ABOVE GROUND CONDITIONS BY THE SURVEYOR. THE ACCURACY OF THIS INFORMATION
IS NOT GUARANTEED.
5.THE CONTRACTOR SHALL CONTACT ALL UTILITY COMPANIES TO LOCATE MAINS,
CONDUITS, SERVICE LINES, ETC. WITHIN THE CONSTRUCTION LIMITS. THE LOCATION AND
PROTECTION OF UTILITY STRUCTURES, THEIR SUPPORT AND MAINTENANCE DURING
CONSTRUCTION (IN COOPERATION WITH APPLICABLE UTILITY COMPANY) IS THE
EXPRESSED RESPONSIBILITY OF THE CONTRACTOR.
6.THE CONTRACTOR SHALL CONTACT ALL APPLICABLE UTILITIES AND VERIFY ANY AND ALL
FEES ASSOCIATED WITH THE INSTALLATION OF ALL UTILITIES.
7.ALL CONSTRUCTION ON THIS SITE TO BE PERFORMED IN COMPLIANCE WITH O.S.H.A.
STANDARDS FOR WORKER SAFETY.
8.ANY PART OF STORM SEWER TRENCHES RUNNING UNDER OR WITHIN 5' OF PAVEMENT TO
BE BACKFILLED WITH GRANULAR MATERIAL.
9.IT IS THE CONTRACTORS RESPONSIBILITY TO VERIFY LOCATION, SIZE, AND ELEVATION OF
EXISTING UTILITIES, STRUCTURES, PIPES, PAVEMENTS, ETC. AS RELATED TO THEIR WORK.
NOTIFY ENGINEER OF ANY CONFLICT AND/OR DISCREPANCIES IN THE CONSTRUCTION
DOCUMENTS.
10.MAINTAIN 10' HORIZONTAL AND 24" VERTICAL CLEARANCE BETWEEN STORM / SANITARY
SEWER SYSTEMS AND DOMESTIC/FIRE LINE SERVICE. SANITARY SEWER LINE IN
PROXIMITY OF WATER LINE SHALL BE C900 WATER MAIN GRADE PVC.
11.CONTRACTOR TO INSTALL CONCRETE CRADLES WHEN THE VERTICAL SEPARATION (AS
MEASURED FROM THE EXTERIOR OF THE PIPES) BETWEEN SANITARY SEWERS, WATER
MAINS AND STORM SEWERS IS 24" OR LESS.
12.IF ANY EXISTING STRUCTURES TO REMAIN ARE DAMAGED DURING CONSTRUCTION, IT
SHALL BE THE CONTRACTORS RESPONSIBILITY TO REPAIR AND/OR REPLACE THE
EXISTING STRUCTURE AS NECESSARY TO RETURN IT TO EXISTING CONDITIONS OR
BETTER.
13.WHEN PERFORMING EXCAVATIONS DURING PERIODS OF WET WEATHER, PROVIDE
ADEQUATE DEWATERING, DRAINAGE AND GROUND WATER MANAGEMENT TO CONTROL
MOISTURE OF SOILS.
14.COMPACTED "B" BORROW BACK FILL REQUIRED OVER ALL UTILITIES IN PAVED AREAS.
15.ALL UTILITY STRUCTURES IN PAVED AREAS SHALL BE FLUSH WITH PAVEMENT AND SHALL
HAVE TRAFFIC BEARING RING AND COVERS.
16.COORDINATE LOCATIONS AND CONNECTIONS OF BUILDING STORM LINES WITH PLUMBING
DRAWINGS.
17.FOLLOW ALL LOCAL AND STATE CODES IN REFERENCE TO STORM SEWER INSTALLATION.
18.ALL EXISTING MANHOLE AND CATCH BASIN GRATES SHALL BE ADJUSTED TO NEW FINISH
GRADE ELEVATIONS.
19.EXISTING PIPES WITHIN CONSTRUCTION LIMITS ARE TO BE CLEANED OUT TO REMOVE ALL
SILT AND DEBRIS.
20.ALL STORM PIPE CONNECTIONS AT STRUCTURES SHALL BE GROUTED TO ASSURE
CONNECTION AT STRUCTURE IS WATERTIGHT.
21.ALL STORM SEWER STRUCTURES IN PAVED AREAS SHALL BE FLUSH WITH PAVEMENT AND
SHALL HAVE TRAFFIC BEARING RING AND COVERS.
22.ALL STORM SEWER STRUCTURES SHALL HAVE A SMOOTH UNIFORM POURED MORTAR
CHANNEL FROM INVERT IN TO INVERT OUT.
23.NEW PIPES AND STRUCTURES WITHIN CONSTRUCTION LIMITS ARE TO BE CLEANED OUT
TO REMOVE ALL SILT AND DEBRIS PRIOR TO FINAL TURNOVER TO THE OWNER.
24.ALL HDPE PIPE SHALL BE DUAL WALLED, HANCOR HQ, ADS N-12 PIPE OR APPROVED
EQUAL.
25.ALL FITTINGS AND ACCESSORIES INCLUDING BUT NOT LIMITED TO END CAPS, CLEANOUTS,
REDUCERS, ETC., SHALL BE OF HDPE MATERIAL COMPARABLE WITH STORAGE PIPES.
26.PROVIDE BACKFILL WITH A MINIMUM OF 4" BEDDING MATERIAL OF #8 AGGREGATE
COMPACTED IN 8" LIFTS TO 95% MAXIMUM DRY DENSITY.
27.VERIFY EXISTING STORM INVERT ELEVATIONS PRIOR TO STARTING NEW STORM SEWER
CONNECTION.
28.ALL PROPOSED AND EXISTING ONSITE STORM SEWER IS/SHALL BE PRIVATE
.
29.REFER TO CITY OF CARMEL DETAIL ON C602 FOR RCP BEDDING AND BACKFILL SECTION.
ELECTRICAL RISER
GUY ANCHOR
ELECTRIC JUNCTION BOX
ORNAMENTAL LIGHT
STREET LIGHT
ELECTRIC MANHOLE
ELECTRIC OUTLET
UTILITY POLE
UTILITY POLE W/ TRANSFORMER
TRANSFORMER
COMMUNICATIONS JUNCTION BOX
COMMUNICATIONS MANHOLE
COMMUNICATIONS PEDESTAL
RIGHT OF WAY LINE
FENCE
GUARD RAIL
BOUNDARY LINE
FIRE DEPT HOOKUP
FIRE HYDRANT
POST INDICATOR VALVE
WATER METER
WATER VALVE
GAS METER
GAS VALVE
ELECTRIC METER
TRAFFIC SIGNAL POLE
TRAFFIC SIGNAL
DOWN SPOUT
COMMUNICATIONS RISER
STORM CLEANOUT
BEEHIVE INLET
CURB INLET
FLOOR DRAIN
ROUND INLET
SQUARE INLET
STORM MANHOLE
SANITARY SEWER CLEANOUT
LIFT STATION
SANITARY SEWER MANHOLE
PARKING LOT LIGHT (1 HEAD)
PARKING LOT LIGHT (3 HEAD)
PARKING LOT LIGHT (4 HEAD)
PARKING LOT LIGHT (2 HEAD)
ROW RIGHT OF WAY
ESMT EASEMENT
D.&U.E.DRAINAGE AND UTILITY EASEMENT
FFE FINISH FLOOR ELEVATION
TOC TOP OF CASTING
CMP CORRUGATED METAL PIPE
RCP REINFORCED CONCRETE PIPE
PVC POLYVINYL CHLORIDE PIPE
VCP VITRIFIED CLAY PIPE
HDPE HIGH DENSITY POLYETHYLENE PIPE
DIP DUCTILE IRON PIPE
SSD SUB SURFACE DRAIN PIPE
STM STORM
SAN SANITARY
STR STRUCTURE
CO CLEANOUT
STORM SEWER PLAN
AND PROFILE LEGEND
UTILITIES
ABBREVIATIONS
LINE TYPES
FLOW LINE
INDEX CONTOUR
INTERMEDIATE CONTOUR
SANITARY SEWER MAIN
STORM SEWER MAIN
UNDERGROUND GAS
UNDERGROUND WATER
AERIAL ELECTRIC
UNDERGROUND ELECTRIC
UNDERGROUND COMMUNICATIONS
AERIAL COMMUNICATIONS
OVERHEAD UTILITY
FORCE MAIN
G G G
W W
E(A)E(A)
E E E
C C C
C(A)C(A)
OHU OHU
FM FM
AERIAL FIBER OPTIC CABLEFO(A)FO(A)
UNDERGROUND FIBER OPTICFOFO
SANITARY SEWER LATERALSANSAN
ROOF DRAINSTMSTM
SUB SURFACE DRAIN
HORIZONTAL SCALE: 1"=30'
VERTICAL SCALE: 1"=3'REVISIONS AND ISSUESPart of SW/4, Section 6, Township 17 North, Range 7 East, Clay Township, Hamilton County, IndianaW17.0533PREPARED FOR:10650 N MICHIGAN RD, ZIONSVILLE, IN 46077PROJECT NO.
SHEET NO.CHECKED BY:DRAWN BY:RLWDESIGNED BY:DWG NAME:PROJECT NO.:W17.0533DATEBY05.08.2019SSRDATE:RLWKnow what's below.
before you dig.Call
R
NOTTINGHAM, LLC OUTLOTSSUBMITTED FOR TAC REVIEW10.19.2018RLWSTEVEN SCOTT RUCKER P.E. 11300279ENGINEERS317 | 846 - 6611800 | 452 - 6408317 | 843 - 0546 faxWEIHELand Surveying | Civil EngineeringLandscape ArchitectureALLAN H. WEIHE, P.E., L.S. - FOUNDER10505 N. College AvenueIndianapolis, Indiana 46280weihe.netBuild with confidence.SM05.08.2019ADDRESSING TAC COMMENTS03.08.2019RLWADDRESSED DRAINAGE REVIEW COMMENTS03.26.2019RLWPLANS UPDATED FOR REVIEW COMMENTS04.29.2019RLWFINAL CONSTRUCTION PLANS05.08.2019RLWFINISHED GRADE
EXISTING GRADE
GRANULAR BACKFILL
PROFILE LEGEND
HYDRAULIC GRADE LINE
STORM 102-205