HomeMy WebLinkAboutC1.0.Demolition PlanEquality Blvd.Community DriveA/C A/C
1
1
1
1
1
1
1
1
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
3
3 3
3
3
3
3
4
45
6 6
6
7 77
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
3
8
8
8
3
TEMPORARY
CONSTRUCTION
ENTRANCE
EXISTING FIRE SERVICE
LINE TO BE LOWERED
9
10
10
10
10
PROTECT STORM INLET
UNTIL IT IS REMOVED
10
10
REMOVE EXISTING
SCREEN WALL
2
2
2
PROJECT NUMBER
DRAWING NUMBER
SHEET OF
SCALE:
DATE:
DWN BY:
CHKD. BY:CIVIL SITE GROUP, INC.GROUP, INC.PROF
E
SS
IONA L E NG INEERIND
IA NA
PE10910647
STATE OF
-oNREGISTEREDBRIANSCR
O
S
STPS.007
C1.0CARMEL, INDIANA 4603314454 COMMUNITY DRIVETHE PLAY SCHOOL at LEGACY, INC.EXISTING CONDITIONS & DEMOLITION PLANTHE PLAY SCHOOL at LEGACY SPORT COURT14454 COMMUNITY DRIVECARMEL, INDIANA 46033REVISION RECORD
06/22/2018
CONTRACTOR NOTE
NO EARTH DISTURBING ACTIVITY MAY COMMENCE
WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT.
TOPOGRAPHIC & BOUNDARY NOTE
UTILITY LOCATE NOTE
LEGEND:
1. EROSION CONTROL PLAN MUST BE EXECUTED BEFORE
COMMENCING WITH CONSTRUCTION.
2. ALL EROSION CONTROL MATERIAL NEEDS TO BE APPROVED
BY THE CITY INSPECTORS PRIOR TO INSTALLATION.
EROSION CONTROL NOTES
UTILITY VALVE NOTE
UTILITY CROSSING NOTE
CONTRACTOR TO FIELD VERIFY SIZE, DEPTH, AND
MATERIAL OF ALL EXISTING UNDERGROUND
UTILITIES AT EACH PROPOSED CROSSING PRIOR TO
COMMENCING WITH CONSTRUCTION. RELOCATION
OF EXISTING UTILITIES MAY BE REQUIRED.
PAVEMENT NOTE
ANY EXISTING ON-SITE PAVEMENT REMOVED SHALL BE SAWCUT, FULL DEPTH AND
RESTORED TO MATCH THE EXISTING PAVEMENT CROSS SECTION WITH THE
FOLLOWING CROSS SECTION AS A MINIMUM:
1-INCHES BITUMINOUS WEARING COURSE-TYPE B 9.5mm
3-INCHES BITUMINOUS LEVELING/BINDER COURSE-TYPE B 12.5 mm
6-INCHES #53 COMPACTED AGGREGATE BASE
ALL JOINTS BETWEEN EXISTING AND NEW PAVEMENT TO BE FILLED WITH HOT
POURED RUBBER JOINT SEALER PRODUCT. HOT POURED RUBBER JOINT SEALER
SHALL BE ONE OF THE FOLLOWING (OR APPROVED EQUAL):
·ROADSAVER 221; CRAFCO INC.
·PRODUCT #9905 or #9030; KOCH MATERIAL COMPANY
·SEALTIGHT HI-SPEC; W.R. MEADOWS, INC.
DEMOLITION NOTES
PLAN NOTES:
1
2
ALL PROPERTY CORNER MONUMENTS SHOULD BE MARKED
PRIOR TO COMMENCING WITH CONSTRUCTION AND
PROTECTED DURING ALL CONSTRUCTION ACTIVITY.
PROPERTY CORNER MONUMENTS NOTE
3
4
5
6
7
8
9
10