HomeMy WebLinkAboutC4.1.SWPP Details06/22/2018
PERMANENT SEEDING DATES
TEMPORARY SEEDING DATES
LAWNS AND HIGH MAINTENANCE AREAS
STEEP BANKS AND CUTS
SEED TOLERANCE CHART
LEVEL AND SLOPING, OPEN AREAS
SEED TOLERANCE
TEMPORARY SEEDINGS
SEEDING DETAIL
TEMPORARY CONSTRUCTION ENTRANCE
FERTILIZER NOTE
SILT FENCE CONSTRUCTION
JOINT DETAIL
EROSION CONTROL MEASURES MAINTENANCE REQUIREMENTS
SILT FENCE MAINTENANCE REQUIREMENTS:
EROSION CONTROL BLANKET (SURFACE APPLIED) MAINTENANCE REQUIREMENTS:
TEMPORARY GRAVEL CONSTRUCTION ENTRANCE MAINTENANCE REQUIREMENTS:
EROSION CONTROL SCHEDULE
MAINTENANCEEROSION CONTROL MEASURE INSTALLATION SEQUENCE
ROCK CHECK DAM MAINTENANCE REQUIREMENTS:
PROTECTION
SILT FENCE INLET
EROSION BLANKET INSATLLATION
PROJECT NUMBER
DRAWING NUMBER
SHEET OF
SCALE:
DATE:
DWN BY:
CHKD. BY:CIVIL SITE GROUP, INC.GROUP, INC.PROF
ESS
IONA L E NG INEERIND
IA NA
PE10910647
STATE OF
-oN
R E G ISTERE
DBRIANSCR
O
S
STPS.007
C4.1NOBLESVILLE, INDIANA 4606015575 STONY CREEK WAYTHE PLAY SCHOOL at LEGACY, INC.STORMWATER POLLUTION PREVENTION DETAILSTHE PLAY SCHOOL at LEGACY SPORT COURT14454 COMMUNITY DRIVECARMEL, INDIANA 46033REVISION RECORD1
1
2
2
3
3
4
4
A A
B B
C C
D D
SHEET 1 OF 1
DWG NOSIZE
SCALE
REV
TYPICAL RECTANGULAR INLET FILTER COMBINATION INLET
FILTER FOR CURB HOODS
TYPICAL ROUND INLET FILTER STAINLESS STEEL ROUND INLET FILTERS forNYLOPLAST CASTINGS
CATCH-ITS SPECIFIED W/ FX or FX-S BAGS
IPP Flexstorm SpecificationsC A
CONCRETE WASHOUT BMP
PLAN
SECTION B-B
ROCK CHECK DAM