HomeMy WebLinkAboutC6.0.Street Plan & ProfileEquality Blvd.
25'
R8'
R5'
R25'R20'
R5'
24'
8'
32.7'
23'
2% MAX 2% MAX
8'
30'
7
6
3
CB
7
CB
CB
CB CB CB
DCCBCB
DC
CB
CB
CB
DC
CB CBCB
DCDC
DC DCDC DC
DCDC
D D H D D DD
C
C
D
D
AA
A
J
F EXISTING BICYCLE RACKS
(QTY. 2, 4 SPACES)
PROPOSED SOUTH R/W OF EQUALITY BLVD.
TEMPORARY END OF PAVEMENT
CONSTRUCTION BY OTHERS
PROPOSED NORTH R/W OF EQUALITY BLVD.
34'
Equality Blvd.
2% MAX 2% MAX30'
EQUALITY BLVD. PROFILE
PROJECT NUMBER
DRAWING NUMBER
SHEET OF
SCALE:
DATE:
DWN BY:
CHKD. BY:CIVIL SITE GROUP, INC.GROUP, INC.PROF
E
SS
IONA L E NG INEERIND
IA NA
PE10910647
STATE OF
-oNREGISTERE
DBRIANSCR
O
S
STPS.007
C6.0NOBLESVILLE, INDIANA 4606015575 STONY CREEK WAYTHE PLAY SCHOOL at LEGACY, INC.STREET PLAN & PROFILEEQUALITY BOULEVARD EXTENSIONTHE PLAY SCHOOL at LEGACY SPORT COURT14454 COMMUNITY DRIVECARMEL, INDIANA 46033REVISION RECORD
06/22/2018
TOPOGRAPHIC & BOUNDARY NOTE
UTILITY LOCATE NOTE
LEGEND:
PLAN NOTES:
A
H
D
C
CB
DC
SIDEWALK NOTE
ALL SIDEWALKS CONSTRUCTED WITHIN THE
PUBLIC RIGHT-OF-WAY SHALL COMPLY WITH
STANDARD CITY OF CARMEL DETAILS.
CARMEL ENGINEERING DEPT. NOTE
ALL PAVING WITHIN THE EXISTING AND PROPOSED CITY RIGHT-OF-WAY SHALL CONFORM TO THE
REQUIREMENTS OF THE DEPARTMENT OF ENGINEERING. THE CONTRACTOR SHALL CONTACT THE
DEPARTMENT OF ENGINEERING TO SCHEDULE A PRE-CONSTRUCTION MEETING TO REVIEW THE
DEPARTMENT'S CONSTRUCTION REQUIREMENTS, STAFF NOTIFICATION REQUIREMENTS, REQUIRED
INSPECTIONS FOR CERTAIN STAGES OF THE WORK AND TO REVIEW THE AUTHORITY OF THE
DEPARTMENT AS IT RELATES TO WORK WITHIN THE EXISTING AND PROPOSED RIGHT-OF-WAY.
STREET PLAN
ALL INFRASTRUCTURE SHALL BE INSTALLED IN
ACCORDANCE WITH THE LOCAL GOVERNING
AUTHORITY'S CONSTRUCTION STANDARDS.
INFRASTRUCTURE NOTE
NOTE
DEPENDING ON THE CONSTRUCTION SEASON, MOISTURE
CONTENT AND PROPERTIES OF THE SOILS ON SITE,
CHEMICAL MODIFICATIONS AND/OR LIME STABILIZATION MAY
BE REQUIRED. SEE SHEET C9.0 FOR SPECIFICATIONS.
GENERAL NOTES
18 " OF VERTICAL SEPARATION MUST
BE MAINTAINED FOR ALL UTILITY
CROSSINGS.
ALL CONCRETE PIPE JOINTS SHALL
BE CONTINUOUS O-RING RUBBER
GASKET CONFORMING TO ASTM C 443
ALL PAVING IS TO BE DONE
DURING ONE PAVING SEASON.
PAVING NOTE