HomeMy WebLinkAboutReserve at Springmill Replat 68-71 Full SetSANNE R COURT
80 79 78
77
76 75
71
68
SANNER COURT
(PRIVATE STREET)
SANNER COURT(PRIVATE STREET)
S AN NER CO UR T MIL
L
R
I
DG
E
D
R
I
V
E
MI LLR ID GE DR IVE
LO T7 4L OT 73L OT 72LO T6 7LO T6 6LO T6 5L OT 64LO T6 3LO T6 2LOT 61 L OT 60 L OT 59LO T58LOT 57LOT 56LOT 55LO T5 4L OT 53
L OT 52SANNER COURT(PR IV ATE ST RE ET)
NO SCALE
PROJECT LOCATION
W
S
N
E
BENCHMARK INFORMATION
SITE TBM -
TBM#1
SET ON THE EAST BOLT ON A FIRE HYDRANT AT THE BEGINNING OF THE
CUL-DA-SAC ON THE NORTH SIDE OF SANNER COURT.
ELEV. 841.80 (NAVD 88)
TBM#2
SET ON THE RIM OF A SANITARY MANHOLE AT THE END OF THE CUL-DA-SAC
OF SANNER COURT.
ELEV. 842.89 (NAVD 88)
GENERAL NOTES:
1) THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING, OR VERIFYING THAT ALL PERMITS AND
APPROVALS ARE OBTAINED FROM THE RESPECTIVE CITY, COUNTY, AND STATE AGENCIES PRIOR TO
STARTING CONSTRUCTION.
2) IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO DETERMINE THE EXACT LOCATIONS OF ALL
EXISTING UTILITIES IN THE VICINITY OF THE CONSTRUCTION AREA PRIOR TO STARTING
CONSTRUCTION
3) IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO NOTIFY AND COORDINATE CONSTRUCTION
WITH ALL RESPECTIVE UTILITIES.
4) ALL QUANTITIES ARE ESTIMATES AND SHALL BE CONFIRMED BY THE BIDDING CONTRACTORS.
5) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS FOR EXCAVATIONS;
FINAL RULE 29 CFR PART 1926, SUBPART "P" APPLIES TO ALL EXCAVATIONS EXCEEDING FIVE (5) FEET
IN DEPTH.
6) EXCAVATIONS EXCEEDING TWENTY (20) FEET IN DEPTH REQUIRE A TRENCH SAFETY SYSTEM
DESIGNED BY A REGISTERED PROFESSIONAL ENGINEER.
7) IT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER AND CONTRACTOR TO MAINTAIN QUALITY
CONTROL THROUGHOUT THIS PROJECT.
8) TEMPORARY TRAFFIC CONTROL DURING CONSTRUCTION TO CONFORM TO APPLICABLE LOCAL
STANDARDS.
9) THE ENGINEER AND/OR OWNER DISCLAIM ANY ROLE IN THE CONSTRUCTION MEANS AND METHODS
ASSOCIATED WITH THE PROJECT AS SET FORTH IN THESE PLANS.
10) ANY FIELD TILES ENCOUNTERED DURING EXCAVATION SHALL BE REPAIRED AND CONNECTED TO
NEW STORM SEWERS AND POSITIVE DRAINAGE PRESERVED.
11) IT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER TO CONFIRM THAT ALL LANDSCAPE
REQUIREMENTS ARE MET AND CONFORM TO APPLICABLE LOCAL STANDARDS.
12) THE SITE DOES NOT LIE IN A SPECIAL FLOOD HAZARD AREA AS ESTABLISHED BY THE FEDERAL
EMERGENCY MANAGEMENT AGENCY - NATIONAL FLOOD INSURANCE PROGRAM, WHEN PLOTTED BY
SCALE ON FLOOD INSURANCE RATE MAP #18057C0208G, DATED NOVEMBER 19, 2014.
13) BEARINGS, DIMENSIONS AND EASEMENTS ARE SHOWN FOR REFERENCE ONLY. SEE RECORD
SURVEYS & PLAT FOR EXACT INFORMATION.
14) THIS SITE DOES NOT CONTAIN WETLANDS AS SHOWN ON THE U.S. DEPARTMENT OF THE INTERIOR
FISH AND WILDLIFE SERVICE; NOBLESVILLE, INDIANA, NATIONAL WETLANDS INVENTORY MAP. NO
WETLANDS ARE IMPACTED BY THIS DEVELOPMENT.
15) ALL WATER MAINS, HYDRANTS, AND WATER VALVES SHALL BE INSPECTED AND SHALL COMPLY WITH
BACKFILL, BEDDING, AND THRUST BLOCK REQUIREMENTS PER CITY OF CARMEL DETAIL SHEETS.
SITE MAP
W
S
N
E
CITY OF CARMEL ENGINEERING
ONE CIVIC SQUARE
CARMEL, IN 46032
ALEX JORDAN
317-571-2441
TRI-COUNTY REGIONAL SEWER UTILITY
7236 MAYFLOWER PARK DR.
ZIONSVILLE, IN 46077
RYAN HARTMAN
317-844-9200
HAMILTON COUNTY SURVEYOR'S OFFICE
ONE HAMILTON SQUARE, SUITE 188
HAMILTON COUNTY JUDICIAL CENTER
NOBLESVILLE, IN 46060
317-776-8495
SAM CLARK
CITY OF CARMEL STREET DEPARTMENT
3400 W. 131ST STREET
CARMEL, IN 46074
ERIC RUSSELL
317-733-1204
CARMEL UTILITIES - WATER
760 3RD AVENUE S.W.
CARMEL, IN 46032
JOHN DUFFY
317-571-2443
CITY OF CARMEL PLANNING/ZONING DEPTARTMENT
1 CIVIC SQUARE
CARMEL, IN 46032
ALEXIA LOPEZ
317-571-2417
SPECTRUM
3030 ROOSEVELT AVENUE
INDIANAPOLIS, IN 46218
STEVE CREECH
317-429-6691
CITY OF CARMEL FIRE DEPARTMENT
10701 N. COLLEGE AVENUE
INDIANAPOLIS, IN 46280
CHRIS ELLISON
317-571-2600
CROSSROAD ENGINEERS
3417 S. SHERMAN DR.
BEECH GROVE, IN 46107
WILLIE HALL
317-780-1555
VECTREN ENERGY
P.O. BOX 1700
NOBLESVILLE, IN 46061
CHAD MILLER
317-776-5590
DUKE ENERGY
16475 SOUTHPARK DRIVE
WESTFIELD, IN 46074
JESSI HERRINGTON
317-896-6725
OPERATING AUTHORITIES
NO SCALE
W
S
N
E
SITE LOCATION MAP
NO SCALE
W
S
N
E
SEE SHEET C202 FOR SOIL DEFINITIONS.
LATITUDE: 39°56'21" N, LONGITUDE: 86°09'45" W
340 SANNER COURT
INDIANAPOLIS, IN 46290
PLANS PREPARED BY
WEIHE ENGINEERS
10505 N. COLLEGE AVE.
INDIANAPOLIS, INDIANA 46280
TELEPHONE: (317) 846-6611
CONTACT PERSON: DUANE SHARRER
EMAIL: SHARRERD@WEIHE.NET
PLANS PREPARED FOR
PITTMAN FAMILY REAL ESTATE INVESTORS, LLC
P.O. BOX 554
CARMEL, INDIANA 46082-0554
TELEPHONE: (317) 590-5074
CONTACT PERSON: STEVE PITTMAN
EMAIL: STEVE@PITTMANPARTNERS.COM
CONSTRUCTION PLANS FOR
THE RESERVE AT SPRINGMILL,
SECTION 2, REPLAT OF LOTS
68, 69C, 70C, & 71
SCALE: 1"=50'
SOILS MAP
AREA LOCATION MAP
C001 Title SheetC001TITLE SHEETW210497BCHW210497 01-13-2022DASJRV340 SANNER COURT, INDIANAPOLIS, IN 46290THE RESERVE AT SPRINGMILL, SECTION 2,REPLAT OF LOTS 68, 69C, 70C, & 7110 9 abcd8 7 6 efgh10 9 8 7 6 REVISIONS AND ISSUES5 4 3 2 1
PROJECT NO.
SHEET NO.abcd5 4 3 2 CHECKED BY:DRAWN BY:DESIGNED BY:DWG NAME:PROJECT NO.:DATEBYeDATE:1
LOCATION: C:\Users\hansenb\appdata\local\temp\AcPublish_32036\C001 Title Sheet.dwgLAYOUT: C001DATE/TIME: August 11, 2022 - 7:31amPLOTTED BY: HansenbfhgENGINEERS317 | 846 - 6611800 | 452 - 6408317 | 843 - 0546faxWEIHELand Surveying | Civil EngineeringLandscape ArchitectureALLAN H. WEIHE, P.E., L.S. - FOUNDER10505 N. College AvenueIndianapolis, Indiana 46280weihe.netBuild with confidence.S MPart of Section 11, Township 17 North, Range 3 East, Clay Township, Hamilton County, IndianaREVISED PER TAC COMMENTS05-13-2022 TPG/BCHREVISED PER TRICO COMMENTS05-19-2022 BCHREVISED PER TAC COMMENTS06-28-2022 TPG/BCHREVISED PER TAC COMMENTS08-10-2022 TPG/BCH
Sheet List Table
Sheet Number Sheet Title
C001 Title Sheet
C100 Existing Conditions & Demolition Plan
C200 SWPPP Phase I
C201 SWPPP Phase II
C202 SWPPP Specs & Details
C300 Development Plan
C301 Emergency Flood Route Plan
C400 Street Plan & Profile
C401 Cul-De-Sac Detail
C402 Signage & SSD Plan
C403 Street Details
C500 Sanitary Plan & Profile
C501 Sanitary Specs & Details
C600 Storm Plan & Profile
C601 Storm Specs & Details
C700 Water Plan
C701 Water Specs & Details
L100 Landscape Plan
L101 Landscape Details
Know what'sbelow.
before you dig.Call
R
LAND DESCRIPTION:
A PART OF THE NORTHWEST QUARTER OF SECTION 11, TOWNSHIP 17 NORTH, RANGE 3 EAST, HAMILTON
COUNTY, INDIANA, BEING THAT 3.495 ACRE TRACT OF LAND SHOWN ON THE PLAT OF AN ORIGINAL
BOUNDARY SURVEY OF SAID TRACT CERTIFIED BY AARON FATELEY, PS LS20700097 ON JANUARY 12, 2022,
AS WEIHE'S PROJECT NUMBER W210497 (ALL REFERENCES TO MONUMENTS AND COURSES HEREIN
SHOWN ON SAID PLAT OF SURVEY) AND BEING MORE FULLY DESCRIBED AS FOLLOWS:
COMMENCING AT THE NORTHWEST CORNER OF THE NORTHWEST QUARTER OF SAID SECTION 11;
THENCE SOUTH 0 DEGREES 17 MINUTES 03 SECONDS WEST 659.67 FEET ALONG THE WEST LINE OF SAID
NORTHWEST QUARTER TO THE PROLONGED NORTH LINE OF THE RESERVE AT SPRING MILL SECTION 2
PLAT RECORDED AS INSTRUMENT NUMBER 9601852 IN THE OFFICE OF THE RECORDER OF HAMILTON
COUNTY; THENCE NORTH 89 DEGREES 31 MINUTES 14 SECONDS EAST 476.07 FEET ALONG SAID
PROLONGED NORTH LINE AND THE NORTH LINE OF SAID RESERVE AT SPRING MILL PLAT TO THE
NORTHWEST CORNER OF LOT 71 IN SAID PLAT AND THE POINT OF BEGINNING; THENCE CONTINUING
NORTH 89 DEGREES 31 MINUTES 14 SECONDS EAST 474.31 FEET ALONG SAID NORTH LINE TO THE
NORTHEAST CORNER OF LOT 70C OF THE REPLAT OF LOT 69B AND 70B IN THE RE-PLAT OF 69A AND 70A
OF THE RESERVE AT SPRINGMILL, SECTION 2 RECORDED AS INSTRUMENT NUMBER 2021051505 IN THE
OFFICE OF THE RECORDER OF HAMILTON COUNTY; THENCE SOUTH 23 DEGREES 15 MINUTES 31
SECONDS WEST 122.88 FEET ALONG THE EAST LINE OF SAID LOT 70C; THENCE SOUTH 0 DEGREES 15
MINUTES 31 SECONDS WEST 257.70 FEET ALONG THE EAST LINE OF SAID LOT 70C AND LOT 69C TO THE
SOUTHEAST CORNER OF LOT 69C; THENCE NORTH 89 DEGREES 44 MINUTES 29 SECONDS WEST 306.27
FEET ALONG THE SOUTH LINE OF LOT 69C TO A SOUTH CORNER OF LOT 68 IN THE SAID PLAT OF THE
RESERVE AT SPRING MILL SECTION 2; THENCE SOUTH 72 DEGREES 15 MINUTES 31 SECONDS WEST 67.39
FEET ALONG THE SOUTH LINE OF SAID LOT 68 TO THE SOUTHWEST CORNER OF SAID LOT 68; THENCE
NORTH 11 DEGREES 25 MINUTES 17 SECONDS WEST 169.90 FEET ALONG THE WEST LINE OF SAID LOT 68
TO THE NORTHWEST CORNER OF SAID LOT 68; THENCE NORTH 3 DEGREES 59 MINUTES 44 SECONDS
WEST 50.03 FEET TO THE SOUTHWEST CORNER OF SAID LOT 71; THENCE NORTH 5 DEGREES 44 MINUTES
29 SECONDS WEST 170.19 FEET ALONG THE WEST LINE OF SAID LOT 71 TO THE POINT OF BEGINNING
CONTAINING 3.495 ACRES, MORE OR LESS.
SETBACKS (S-2 ZONING WITH VARIANCE REQUESTS*)
FRONT YARD: 22' MINIMUM*
REAR YARD: 20' MINIMUM
SIDE YARD: 5' MINIMUM*
DISTURBED ACREAGE: 2.65
DESIGN SPEED: 25 MPH
08/23/22
C C
CCCCG
G
G
GGGLOT 72
LOT 67
LOT 66
LOT 63
LOT 62
LOT 61
LOT 60 LOT 59
LOT 58
LOT 57
LOT 56
LOT 55
LOT 54
SANNER CO
U
R
T
D1
D2
D4
D3
D2
D1
D1
D1
D1
D1 D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
Know what'sbelow.
before you dig.Call
R
W
S
N
E
GENERAL DEMOLITION NOTES:
1. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY LOCATIONS OF ALL EXISTING UTILITIES PERTAINING TO
THEIR PHASE OF WORK.
2. LOCATIONS OF UTILITIES NOTED TO BE REMOVED ARE APPROXIMATE AND SHALL BE RELOCATED, CAPPED AND/OR
ABANDONED PRIOR TO CONSTRUCTION.
3. ALL DEMOLITION MATERIAL AND SALVAGEABLE MATERIAL ARE THE PROPERTY OF THE DEMOLITION CONTRACTOR AND
SHALL BE PROPERLY DISPOSED OF OFFSITE.
4. THE CONTRACTOR SHALL OBTAIN ALL DEMOLITION PERMITS REQUIRED BY LOCAL AND STATE AGENCIES.
5. THE CONTRACTOR SHALL MAINTAIN STREETS FREE AND CLEAR OF SEDIMENT AND DEBRIS.
6. CONTRACTOR AND DEVELOPER TO COORDINATE WITH EXISTING HOMEOWNER TO PROVIDE TEMPORARY ACCESS TO
EXISTING HOME ON LOT 68 DURING CONSTRUCTION.
7. DEVELOPER TO COORDINATE WITH EXISTING HOMEOWNER TO PROVIDE PERMANENT DRIVEWAY AND SIDEWALK
REPLACEMENT.
8. EXSITING PERIMETER FENCE AND COLUMNS TO BE PRESERVED. REMOVE AND REPAIR/REPLACE SECTION AS NEEDED TO
INSTALL STORM SEWER PIPE.
9. UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. UTILITY LINE
RELOCATIONS REQUIRED FOR ROAD PROJECTS THAT RESULT IN A CONFLICT WITH PROPOSED DEVELOPMENT SHALL BE
THE DEVELOPER TO RESOLVED WITH THE UTILITY. EXISTING POLE LINES REQUIRED TO BE RELOCATED TO WITHIN ONE
FOOT OF PROPOSED RIGHT-OF-WAY LINE.
10. DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL BE RESTORED/REPAIRED TO THE SATISFACTION OF THE CITY AT THE
COMPLETION OF THE PROJECT. THE CONTRACTOR IS ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THE CITY PRIOR
TO THE START OF CONSTRUCTION TO DOCUMENT THE EXISTING CONDITION OF THE RIGHT-OF-WAY.
11. NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT.
12. THE SITE DOES NOT LIE IN A SPECIAL FLOOD HAZARD AREA AS ESTABLISHED BY THE FEDERAL EMERGENCY MANAGEMENT
AGENCY - NATIONAL FLOOD INSURANCE PROGRAM, WHEN PLOTTED BY SCALE ON FLOOD INSURANCE RATE MAP
#18057C0208G, DATED NOVEMBER 19, 2014.
LEGEND:
LAND DESCRIPTION:
A PART OF THE NORTHWEST QUARTER OF SECTION 11, TOWNSHIP 17 NORTH, RANGE 3 EAST, HAMILTON COUNTY, INDIANA, BEING
THAT 3.495 ACRE TRACT OF LAND SHOWN ON THE PLAT OF AN ORIGINAL BOUNDARY SURVEY OF SAID TRACT CERTIFIED BY
AARON FATELEY, PS LS20700097 ON JANUARY 12, 2022, AS WEIHE'S PROJECT NUMBER W210497 (ALL REFERENCES TO
MONUMENTS AND COURSES HEREIN SHOWN ON SAID PLAT OF SURVEY) AND BEING MORE FULLY DESCRIBED AS FOLLOWS:
COMMENCING AT THE NORTHWEST CORNER OF THE NORTHWEST QUARTER OF SAID SECTION 11; THENCE SOUTH 0 DEGREES 17
MINUTES 03 SECONDS WEST 659.67 FEET ALONG THE WEST LINE OF SAID NORTHWEST QUARTER TO THE PROLONGED NORTH
LINE OF THE RESERVE AT SPRING MILL SECTION 2 PLAT RECORDED AS INSTRUMENT NUMBER 9601852 IN THE OFFICE OF THE
RECORDER OF HAMILTON COUNTY; THENCE NORTH 89 DEGREES 31 MINUTES 14 SECONDS EAST 476.07 FEET ALONG SAID
PROLONGED NORTH LINE AND THE NORTH LINE OF SAID RESERVE AT SPRING MILL PLAT TO THE NORTHWEST CORNER OF LOT 71
IN SAID PLAT AND THE POINT OF BEGINNING; THENCE CONTINUING NORTH 89 DEGREES 31 MINUTES 14 SECONDS EAST 474.31
FEET ALONG SAID NORTH LINE TO THE NORTHEAST CORNER OF LOT 70C OF THE REPLAT OF LOT 69B AND 70B IN THE RE-PLAT OF
69A AND 70A OF THE RESERVE AT SPRINGMILL, SECTION 2 RECORDED AS INSTRUMENT NUMBER 2021051505 IN THE OFFICE OF
THE RECORDER OF HAMILTON COUNTY; THENCE SOUTH 23 DEGREES 15 MINUTES 31 SECONDS WEST 122.88 FEET ALONG THE
EAST LINE OF SAID LOT 70C; THENCE SOUTH 0 DEGREES 15 MINUTES 31 SECONDS WEST 257.70 FEET ALONG THE EAST LINE OF
SAID LOT 70C AND LOT 69C TO THE SOUTHEAST CORNER OF LOT 69C; THENCE NORTH 89 DEGREES 44 MINUTES 29 SECONDS
WEST 306.27 FEET ALONG THE SOUTH LINE OF LOT 69C TO A SOUTH CORNER OF LOT 68 IN THE SAID PLAT OF THE RESERVE AT
SPRING MILL SECTION 2; THENCE SOUTH 72 DEGREES 15 MINUTES 31 SECONDS WEST 67.39 FEET ALONG THE SOUTH LINE OF
SAID LOT 68 TO THE SOUTHWEST CORNER OF SAID LOT 68; THENCE NORTH 11 DEGREES 25 MINUTES 17 SECONDS WEST 169.90
FEET ALONG THE WEST LINE OF SAID LOT 68 TO THE NORTHWEST CORNER OF SAID LOT 68; THENCE NORTH 3 DEGREES 59
MINUTES 44 SECONDS WEST 50.03 FEET TO THE SOUTHWEST CORNER OF SAID LOT 71; THENCE NORTH 5 DEGREES 44 MINUTES
29 SECONDS WEST 170.19 FEET ALONG THE WEST LINE OF SAID LOT 71 TO THE POINT OF BEGINNING CONTAINING 3.495 ACRES,
MORE OR LESS.
GENERAL NOTES:
1. THE UNDERGROUND UTILITIES DEPICTED ON THE ATTACHED PLAT OF SURVEY ARE AS SHOWN ON A SURVEY PREFORMED
BY WEIHE ENGINEERS DATED SEPTEMBER 24, 2021. THE PATH OF THE UTILITY LINES SHOWN ON SAID PLAT OF SURVEY
SHOULD BE CONSIDERED APPROXIMATE UNTIL THEY ARE EITHER RELOCATED, BY CALLING THE INDIANA UNDERGROUND
PLANT PROTECTION SERVICE AT 1-800-382-5544 OR UNTIL THEY ARE EXCAVATED TO VERIFY THE LOCATION AND PATH OF
THE UTILITY LINES.
2. THE BOUNDARY IS BASED ON AN ALTA SURVEY PERFORMED BY WEIHE ENGINEERS.
3. THE TOPOGRAPHIC SURVEY WAS PERFORMED BY WEIHE ENGINEERS DATED SEPTEMBER 24, 2021.C100 Demo PlanC100EXISTING CONDITIONS & DEMOLITION PLANW210497BCHW210497 xxxDAS----10 9 abcd8 7 6 efgh10 9 8 7 6 REVISIONS AND ISSUES5 4 3 2 1
PROJECT NO.
SHEET NO.abcd5 4 3 2 CHECKED BY:DRAWN BY:DESIGNED BY:DWG NAME:PROJECT NO.:DATEBYeDATE:1
LOCATION: H:\2021\W210497\Engineering\design\conset\C100 Demo Plan.dwgLAYOUT: C100DATE/TIME: August 11, 2022 - 7:31amPLOTTED BY: HansenbfhgENGINEERS317 | 846 - 6611800 | 452 - 6408317 | 843 - 0546faxWEIHELand Surveying | Civil EngineeringLandscape ArchitectureALLAN H. WEIHE, P.E., L.S. - FOUNDER10505 N. College AvenueIndianapolis, Indiana 46280weihe.netBuild with confidence.S MPart of Section 11, Township 17 North, Range 3 East, Clay Township, Hamilton County, IndianaREVISED PER TAC COMMENTS05-13-2022 TPG/BCHREVISED PER TRICO COMMENTS05-19-2022 BCHREVISED PER TAC COMMENTS06-28-2022 TPG/BCHREVISED PER TAC COMMENTS08-10-2022 TPG/BCH
BRASS OR ALUM. PLUG FOUND/SET
HARRISON MONUMENT FOUND
BENCH MARK
CONIFEROUS TREE
UNDERGROUND GAS
UNDERGROUND WATER
UNDERGROUND ELECTRIC
UNDERGROUND COMMUNICATIONS
WROUGHT IRON FENCE
BUILDING SETBACK LINE
BOUNDARY LINE
FIRE HYDRANT
SPIGOT
WATER METER
WATER VALVE
GAS PIPELINE MARKER
MAIL BOX
DECIDUOUS TREE
BEEHIVE INLET
SANITARY SEWER MANHOLE
G G G
W W W
E E E
C C C
MEASURED DIMENSION(M)
PLATTED DIMENSION(P)
SECTION LINE
INDEX CONTOUR
INTERMEDIATE CONTOUR
ROW RIGHT OF WAY
BSL BUILDING SETBACK LINE
CABLE TELEVISION PEDESTAL
STONE FENCE COLUMN
SITE TBM
TBM#1
SET ON THE EAST BOLT ON A FIRE HYDRANT AT THE
BEGINNING OF THE CUL-DA-SAC ON THE NORTH SIDE OF
SANNER COURT.
ELEV. 841.80 (NAVD 88)
TBM#2
SET ON THE RIM OF A SANITARY MANHOLE AT THE END OF
THE CUL-DA-SAC OF SANNER COURT.
ELEV. 842.89 (NAVD 88)340 SANNER COURT, INDIANAPOLIS, IN 46290THE RESERVE AT SPRINGMILL, SECTION 2,REPLAT OF LOTS 68, 69C, 70C, & 71TREE PROTECTION FENCE
DEMOLITION ITEMS:
- TREES AND STUMPS TO BE REMOVED
- COORDINATE WITH UTILITY COMPANIES TO REMOVE EXSITING UTILITIES AND PEDESTALS
- COORDINATE WITH HOMEOWNER TO RELOCATE MAILBOX
- SAWCUT AND REMOVE SIDEWALK, CURB, AND ASPHALT
BEGINNING AT STATIONING 4+25.00
D1
D2
D3
D4
08/23/22
SANNER CO
U
R
T
MILLRIDGE DRIVELOT 72
LOT 67
LOT 66
LOT 57
LOT 56
LOT 55
LOT 54
DDDDDDDDDDDDDDDDD
D D DDDDDD D D D D D D D DDDD
D
D
D
D
D
D DDDDDDDDDDDD
D
DDDDDDD D D D D D
DDDDDDDDDDDDDDDDDDDDSF
SF
SF SFSFSFSFSFSFSFSFSFIP
IP
SF
SF
SF
SFSFSFSF
SFSF SF SFSFSFSF SF SF SF SF SF SF SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFS
F
SF SFSFSFSFSFSF
SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFKnow what'sbelow.
before you dig.Call
R
W
S
N
E
DISTURBED ACREAGE =
2.48 ± AC.
NOTES:
1. THIS PLAN INDICATES EROSION CONTROL MEASURES REQUIRED
BEFORE SOIL STRIPPING AND PAD CONSTRUCTION IS TAKING
PLACE. COORDINATE WITH SOIL CONSERVATION DISTRICT
REPRESENTATIVE FOR ANY OTHER MEASURES REQUIRED DUE TO
SITE CONDITIONS.
2. THIS PLAN IS TO BE USED FOR STORMWATER POLLUTION
PREVENTION PURPOSES ONLY. FOR ANY OTHER INFORMATION
SEE SITE CONSTRUCTION PLANS AND DETAILS.
3. ALL DISTURBED AREAS THAT WILL BE POTENTIALLY IDLE FOR 15
DAYS OR MORE TO BE STABILIZED (SEEDED, MULCHED, ETC)
IMMEDIATELY.
4. NO EARTHMOVING MAY TAKE PLACE WITHOUT AN APPROVED
STORMWATER POLLUTION PREVENTION PLAN.
5. ADDITIONAL STORMWATER POLLUTION PREVENTION MEASURES
MAY BE REQUIRED IN THE FIELD BY THE MS4 REPRESENTATIVE.
6. THERE SHALL BE NO DIRT, DEBRIS OR STORAGE OF MATERIALS IN
THE STREETS.
7. SILT FENCE SHALL BE PLACED AS SHOWN ON THE PLANS PRIOR
TO ANY EARTHWORK.
8. ALL WORK WITHIN THE RIGHT-OF-WAY SHALL MEET CURRENT
LOCAL CONSTRUCTION STANDARDS.
9. THE CONTRACTOR SHALL PROTECT EXISTING RIGHT-OF-WAY
INFRASTRUCTURE AND BE RESPONSIBLE FOR RESTORATION AS
NECESSARY.
10. THE HAMILTON COUNTY SURVEYOR'S OFFICE IS THE REVIEW
AUTHORITY FOR THE EROSION CONTROL ACTIVITIES REQUIRING
CONTACT, PRE-CONSTRUCTION MEETING INVITATION,
SELF-MONITORING REPORT DELIVERY TO THEIR MS4
REPRESENTATIVE.
11. NOTICE OF THE SCHEDULED DATE FOR COMPLETION OF
CONSTRUCTION SHALL BE PROVIDED TO THE MS4
REPRESENTATIVE AT LEAST SEVENTY TWO (72) HOURS PRIOR TO
COMPLETION. THE CONTRACTOR OR OWNER WILL SCHEDULE THE
FINAL INSPECTION; THE STORM DRAIN AND SITE GRADING
PERFORMANCE SURETIES WILL BE RELEASED AFTER SUBMITTAL
AND APPROVAL
12. APPROXIMATE CONSTRUCTION SCHEDULE:
START DATE: April , 2022
COMPLETION DATE: April , 2027
RECEIVING WATERS = Williams Creek
13. LATITUDE = 39° 56' 21" N, LONGITUDE = 86° 09' 45" W
14. HYDROLOGIC UNIT CODE: 05120201090060
15. PERSON IN CHARGE OF SWPPP IMPLEMENTATION:
PITTMAN PARTNERS
P.O. BOX 554
CARMEL, INDIANA 46082
TELEPHONE: (317) 590-5074
CONTACT PERSON: STEVE PITTMAN
STEVE@PITTMANPARTNERS.COM
LEGEND
PHASE I EROSION CONTROL
(BEFORE MAJOR EARTHWORK)
PRE CONSTRUCTION ACTIVITIES
1. CALL THE INDIANA UNDERGROUND PLANT PROTECTION SYSTEMS,
INC. (“HOLEY MOLEY”) AT 811 TWO WORKING DAYS BEFORE
CONSTRUCTION BEGINS TO CHECK THE LOCATIONS OF ANY
EXISTING UTILITIES.
2. CONTACT THE MS4 STORMWATER DEPARTMENT INSPECTOR TO
SCHEDULE A PRE-CONSTRUCTION MEETING AT LEAST 3 WORKING
DAYS PRIOR TO THE START OF CONSTRUCTION.
3. CONTACT IDEM AT LEAST 48 HOURS PRIOR TO CONSTRUCTION.
4. INSTALL SILT FENCE AT THE EDGES OF THE PROJECT SITE WHERE
THERE IS POTENTIAL FOR ANY STORMWATER RUNOFF AS DENOTED
ON THE STORMWATER POLLUTION PREVENTION PLAN. POTENTIAL
AREAS ARE IDENTIFIED BASED ON EXISTING TOPOGRAPHY AROUND
THE PERIMETER OF THE SITE.
5. INSTALL INLET PROTECTION ON ALL EXISTING STORM SEWER
STRUCTURES WITHIN THE CONSTRUCTION LIMITS OF THE PROJECT
AS INDICATED ON THE PLANS.
6. EVALUATE, MARK AND PROTECT IMPORTANT TREES AND
ASSOCIATED ROOT ZONES. EVALUATE EXISTING VEGETATION
SUITABLE FOR USE AS FILTER STRIPS ALONG THE PERIMETER OF
THE SITE.
7. INSTALL CONSTRUCTION ENTRANCE IN THE LOCATION SHOWN ON
THE PLANS AND PER SPECIFICATIONS.
8. ESTABLISH CONSTRUCTION STAGING AREA FOR EQUIPMENT AND
VEHICLES AS FAR FROM DETENTION PONDS AND SWALES AS
POSSIBLE.
9. INSTALL TRASH DUMPSTER, CONCRETE WASHOUT AREA AND PLACE
PORT-O-LET AS INDICATED ON THE PLANS.
10.ESTABLISH ONSITE LOCATION FOR OWNER/CONTRACTOR
PLACEMENT OF APPROVED PLANS, RULE 5 NOI AND RULE 5
INSPECTION DOCUMENTS.
11.CONTACT THE MS4 REPRESENTATIVE TO CONDUCT INITIAL
EROSION INSPECTION BEFORE MASS EARTHWORK.
CONSTRUCTION SEQUENCING
THE PURPOSE OF STAGING CONSTRUCTION DURING THE PROJECT IS
TO LIMIT THE AMOUNT OF GROUND DISTURBED AT ANY GIVEN TIME
AND TO PREVENT SEDIMENT FROM LEAVING THE SITE. THE
FOLLOWING SEQUENCE OF CONSTRUCTION SHOULD BE FOLLOWED AS
MUCH AS POSSIBLE. ANY DEWATERING REQUIRED DURING
CONSTRUCTION OF THIS PROJECT SHALL BE DONE THROUGH A
“DANDY” DEWATERING BAG OR APPROVED EQUAL. DO NOT PLACE
DEWATERING BAG WITHIN 50 FEET OF A SWALE, DITCH OR CREEK.
1. CLEAR SITE.
2. STRIP TOPSOIL OR SOIL CONTAINING VEGETATION AND ROOT
FIBERS FROM STREET AND BUILDING PAD AREAS AND PLACE IN
TOPSOIL STOCKPILE AREA AS NOTED ON THE PLANS.
3. COMPLETE ALL MASS GRADING REQUIRED TO PREPARE ROADS,
BUILDING SUBGRADES AND PADS. IF LIME OR OTHER SOLID
ADDITIVES WILL BE USED TO STABILIZE THE STREET SUBGRADE,
APPLY BEFORE ANY STORM SEWER INSTALLATION.
4. INSTALL ALL STORM SEWER SYSTEMS, SANITARY SEWER SYSTEMS,
WATER DISTRIBUTION SYSTEMS AND OTHER UTILITIES. INSTALL ALL
INLET PROTECTION AS EACH INLET IS COMPLETED AS SHOWN ON
THE PLANS AND THE DETAIL SHEETS.
5. COMPLETE GRADING FOR ALL BUILDING AREAS AND ROAD
SUBGRADES AS SHOWN ON THE PLANS.
6. INSTALL CURBING, AND PAVE ALL ROADS
7. INSTALL TEMPORARY SEEDING IN ALL GRADED AREAS THAT WILL
NOT BE DISTURBED FOR 14 DAYS OR MORE. POND BANKS SHALL
RECEIVE PERMANENT SEED AND EROSION CONTROL BLANKET AS
SHOWN ON THE PLANS.
8. FINISH GRADE ALL SWALES. APPLY PERMANENT SEED AND
EROSION CONTROL BLANKETS AS SHOWN ON THE PLANS.
9. PREPARE SEED BED AND APPLY PERMANENT SEED IN ALL COMMON
AREAS AND EASEMENT AREAS AS DENOTED ON THE PLANS.
10.CLEAN AND MAINTAIN ALL INLET PROTECTION, SILT FENCE,
EROSION CONTROL BLANKETS, TEMPORARY SILTATION BASINS AND
TEMPORARY SEEDING AREAS UNTIL THE PROJECT IS COMPLETELY
BUILT OUT.
11.IF SEEDED AREAS DO NOT PRODUCE A MINIMUM OF 70 PERCENT
VEGETATIVE COVER, CONTRACTOR SHALL RE-SEED TO OBTAIN
ADEQUATE VEGETATIVE COVER FOR STABILIZATION OF THE SITE.
12.REMOVE ALL TEMPORARY EROSION CONTROL PRACTICES
INCLUDING SILT FENCE WHEN ENTIRE SITE HAS REACHED 70
PERCENT VEGETATIVE COVER.
- CONSTRUCTION ENTRANCE
(8" OF #2 STONE ON NON-WOVEN GEOTEXTILE
FABRIC)
- STAGING AREA
(8" OF #2 STONE ON NON-WOVEN GEOTEXTILE
FABRIC)
- POSTING AREA - 4" PVC TUBE WITH END CAPS
ATTACHED TO PROJECT CONSTRUCTION SIGN TO
CONTAIN APPROVED CONSTRUCTION DRAWINGS
AND PERMITS FOR INSPECTORS.
- SHEET FLOW PROTECTION / SILT FENCE
- CONCRETE WASHOUT
- LIMITS OF CONSTRUCTION
- PROPOSED INLET PROTECTION (DANDY SACKS
AND WIRE SILT FENCES) FOR EXISTING
STRUCTURES REQUIRED. (SEE DETAILS ON SHEET
C203)
- TREE PROTECTION FENCE (SEE DETAIL ON SHEET
L101)
IP
SF
D
C200 SWPPP IC200SWPPP PHASE IW210497BCHW210497 01-13-2022DASJRV10 9 abcd8 7 6 efgh10 9 8 7 6 REVISIONS AND ISSUES5 4 3 2 1
PROJECT NO.
SHEET NO.abcd5 4 3 2 CHECKED BY:DRAWN BY:DESIGNED BY:DWG NAME:PROJECT NO.:DATEBYeDATE:1
LOCATION: H:\2021\W210497\Engineering\design\conset\C200 SWPPP I.dwgLAYOUT: C200DATE/TIME: August 11, 2022 - 7:31amPLOTTED BY: HansenbfhgENGINEERS317 | 846 - 6611800 | 452 - 6408317 | 843 - 0546faxWEIHELand Surveying | Civil EngineeringLandscape ArchitectureALLAN H. WEIHE, P.E., L.S. - FOUNDER10505 N. College AvenueIndianapolis, Indiana 46280weihe.netBuild with confidence.S MPart of Section 11, Township 17 North, Range 3 East, Clay Township, Hamilton County, IndianaREVISED PER TAC COMMENTS05-13-2022 TPG/BCHREVISED PER TRICO COMMENTS05-19-2022 BCHREVISED PER TAC COMMENTS06-28-2022 TPG/BCHREVISED PER TAC COMMENTS08-10-2022 TPG/BCH
SITE TBM
TBM#1
SET ON THE EAST BOLT ON A FIRE HYDRANT AT THE
BEGINNING OF THE CUL-DA-SAC ON THE NORTH SIDE OF
SANNER COURT.
ELEV. 841.80 (NAVD 88)
TBM#2
SET ON THE RIM OF A SANITARY MANHOLE AT THE END OF
THE CUL-DA-SAC OF SANNER COURT.
ELEV. 842.89 (NAVD 88)340 SANNER COURT, INDIANAPOLIS, IN 46290THE RESERVE AT SPRINGMILL, SECTION 2,REPLAT OF LOTS 68, 69C, 70C, & 7108/23/22
SANNER CO
U
R
T
MILLRIDGE DRIVE
LOT 72
LOT 67
LOT 66
LOT 63
LOT 62
LOT 61
LOT 60 LOT 59
LOT 58
LOT 57
LOT 56
LOT 55
LOT 54
W W W W
W W W W
W
W
W
80
79
78
7776
75
71
68
SANNER COURT
(PRIVATE STREET)SANSANSANSANSANSANSANDDDDDDDDDDDDDDDDD
D D DDDDDD D D D D D D DD DDD
D
D DDD
D
DDDDDDD D D D D D
DDDDDDDDDDDDDDDDDDDDIP
IP
SF
SF
SF
SFSFSFSF
SFSF SF
SFSFSFSF SF SF SF SF SF SF SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFS
F SF SFSFSFSFSFSF
SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFIP
IP
IP
SF SF SF
SF SF SF SF SF
SF
SF
SF SF SFSFSFSFSFSFSFSFSFSFSFSFSFKnow what'sbelow.
before you dig.Call
R
W
S
N
E
PHASE II EROSION CONTROL
(AFTER MAJOR EARTHWORK)
LEGEND
*
SF
D
- INLET PROTECTION (DANDY SACKS AND WIRE
SILT FENCES) FOR PROPOSED STRUCTURES
(SEE TOWN OF CICERO STANDARD DETAILS)
- PROPOSED INLET PROTECTION (DANDY SACKS
AND WIRE SILT FENCES) FOR EXISTING
STRUCTURES REQUIRED. (SEE TOWN OF
CICERO STANDARD DETAILS)
- PERMANENT SEEDING (USE PLANTING CHART)
AT A MINIMUM, MULCH IS REQUIRED.
- EROSION CONTROL BLANKET (USE STAPLE
PATTERN N.A.G. S150.)
- TEMPORARY SEEDING
- SHEET FLOW PROTECTION
- SWALE
- CONSTRUCTION LIMITS
- LOCATION WHERE STORMWATER LEAVES SITE
- TREE PROTECTION FENCE
- STORMWATER QUALITY FEATURE
IP
IP
DISTURBED ACREAGE =
2.48 ± AC.
POST CONSTRUCTION
SEQUENCING
THE PURPOSE OF THE POST CONSTRUCTION PHASE IS TO IDENTIFY
AND MAINTAIN ALL POST CONSTRUCTION BEST MANAGEMENT
PRACTICE (BMP) STRUCTURES THUS REDUCING RUNOFF AND
CONTROLLING POLLUTANTS. THE FOLLOWING SEQUENCING SHOULD
BE FOLLOWED AS MUCH AS POSSIBLE.
1. DISTRIBUTE POST CONSTRUCTION BMP OPERATIONS AND
MAINTENANCE MANUAL (O&M MANUAL) TO OWNER AND HOME
OWNERS ASSOCIATION.THE O&M MANUAL IDENTIFIES AND LOCATES
THE BMP STRUCTURE FOR THE OWNER.
2. STORMWATER BMP OWNERS MUST ROUTINELY INSPECT BMP TO
VERIFY THAT ALL BMP COMPONENTS ARE FUNCTIONING AS
DESIGNED AND ARE NOT IN DANGER OF FAILING. ALL BMP NEED
MAINTENANCE TO FUNCTION AS WATER QUALITY ENHANCEMENTS.
MAINTENANCE CAN RANGE FROM DREDGING SEDIMENT OUT OF
THE TREATMENT AREA TO MOWING GRASS.
3. BMP OWNER IS RESPONSIBLE FOR THE MAINTENANCE OF THE BMP
AND ANY COSTS ASSOCIATED WITH MAINTAINING THE BMP.
4. BMP OWNER SHALL KEEP THE BMP FREE FROM LITTER AND WOODY
GROWTH. REFER TO THE INSPECTION AND MAINTENANCE
GUIDELINES FOR FURTHER CLARIFICATION.
5. SEDIMENT THAT COLLECTS IN THE BMP SHALL BE REMOVED WHEN
IT ADVERSELY AFFECTS THE ABILITY OF THE BMP TO PERFORM AS
A WATER QUALITY CONTROL DEVICE.C201 SWPPP IIC201SWPPP PHASE IIW210497BCHW210497 01-13-2022DASJRV10 9 abcd8 7 6 efgh10 9 8 7 6 REVISIONS AND ISSUES5 4 3 2 1
PROJECT NO.
SHEET NO.abcd5 4 3 2 CHECKED BY:DRAWN BY:DESIGNED BY:DWG NAME:PROJECT NO.:DATEBYeDATE:1
LOCATION: H:\2021\W210497\Engineering\design\conset\C201 SWPPP II.dwgLAYOUT: C201DATE/TIME: August 11, 2022 - 7:32amPLOTTED BY: HansenbfhgENGINEERS317 | 846 - 6611800 | 452 - 6408317 | 843 - 0546faxWEIHELand Surveying | Civil EngineeringLandscape ArchitectureALLAN H. WEIHE, P.E., L.S. - FOUNDER10505 N. College AvenueIndianapolis, Indiana 46280weihe.netBuild with confidence.S MPart of Section 11, Township 17 North, Range 3 East, Clay Township, Hamilton County, IndianaREVISED PER TAC COMMENTS05-13-2022 TPG/BCHREVISED PER TRICO COMMENTS05-19-2022 BCHREVISED PER TAC COMMENTS06-28-2022 TPG/BCHREVISED PER TAC COMMENTS08-10-2022 TPG/BCH
SITE TBM
TBM#1
SET ON THE EAST BOLT ON A FIRE HYDRANT AT THE
BEGINNING OF THE CUL-DA-SAC ON THE NORTH SIDE OF
SANNER COURT.
ELEV. 841.80 (NAVD 88)
TBM#2
SET ON THE RIM OF A SANITARY MANHOLE AT THE END OF
THE CUL-DA-SAC OF SANNER COURT.
ELEV. 842.89 (NAVD 88)
*340 SANNER COURT, INDIANAPOLIS, IN 46290THE RESERVE AT SPRINGMILL, SECTION 2,REPLAT OF LOTS 68, 69C, 70C, & 71BMP
BMP
08/23/22
SECTION 2 MATERIAL HANDLING AND
SPILL PREVENTION PLAN
IN ORDER TO MINIMIZE THE RELEASE OF POTENTIAL POLLUTANTS DURING CONSTRUCTION THE
CONTRACTORS SHALL IMPLEMENT THIS MATERIAL HANDLING AND SPILL PREVENTION PLAN. THE
CONTRACTOR SHALL REVIEW THIS PLAN WITH ALL SUBCONTRACTORS AND REQUIRE THAT THEY
IMPLEMENT THE PLAN AS WELL.
1. CONSTRUCTION EQUIPMENT
A. FUELING, LUBRICATION AND FLUIDS: ALL OPERATIONS INVOLVING THE ADDITION OF FLUIDS TO
EQUIPMENT SHOULD BE DONE IN ONE LOCATION, AS DESIGNATED BY THE CONSTRUCTION
MANAGER, SO THAT SPILLS ARE LIMITED TO ONE LOCATION ON THE SITE, WHICH WILL
FACILITATE THE CLEANUP OF SPILLS. IF AN ONSITE-FUELING TANK IS PLANNED TO BE ON SITE,
IT SHALL BE DOUBLE WALLED AND STORED IN THIS DESIGNED AREA. THIS LOCATION IS AN
AREA THAT WILL NOT ALLOW SPILLED FLUIDS TO MIGRATE INTO SUBSURFACE SOILS. IN THE
EVENT OF A SPILL, THE FLUID SHALL IMMEDIATELY BE CLEANED UP BY REMOVING THE
CONTAMINATED SOIL OR STONE, WHICH SHALL BE DISPOSED OF IN AN ACCEPTABLE MANNER.
SPILLS ON HARD SURFACES SHALL BE SOAKED UP BY AN ACCEPTABLE MATERIAL SUCH AS OIL
DRY AND THE ABSORBENT MATERIAL DISPOSED OF IN A PROPER MANNER. THE SPILL SHALL
ALSO BE REPORTED IMMEDIATELY TO THE CONSTRUCTION MANAGER'S SUPERINTENDENT.
B. EQUIPMENT REPAIR, ESPECIALLY WHEN FLUIDS MUST BE REMOVED FROM THE EQUIPMENT OR
THE POSSIBILITY OF FLUID SPILLS IS HIGH, SHOULD ALWAYS BE DONE OFFSITE AT A FACILITY
THAT IS MORE SUITABLE THAN A CONSTRUCTION SITE TO HANDLE SPILLS. WHEN EQUIPMENT
MUST BE REPAIRED ONSITE IT SHOULD BE MOVED TO THE MAINTENANCE AND FUELING AREA IF
POSSIBLE. OTHERWISE, SUITABLE ON SITE CONTAINERS SHOULD BE PLACED UNDER THE
EQUIPMENT DURING REPAIR TO CATCH ANY SPILLED FLUIDS AND THESE FLUIDS SHOULD BE
DISPOSED OF IN A PROPER MANNER.
C. ALL REUSABLE FLUID CONTAINERS, SUCH AS GASOLINE CANS, SHALL BE INSPECTED FOR
LEAKS EACH TIME THEY ARE USED. IF LEAKS ARE FOUND, THE FLUID SHALL BE REMOVED FROM
THE CONTAINER IN A PROPER MANNER AND THE CONTAINER DISPOSED OF IN AN ACCEPTABLE
MANNER. EMPTY DISPOSABLE CONTAINER, SUCH AS GREASE TUBES AND LUBRICATING OIL
AND BRAKE FLUID CONTAINERS, AND THEIR PACKAGING, SHALL BE DISPOSED OF IN A PROPER
MANNER AND SHALL NOT BE LEFT ON THE GROUND OR IN THE OPEN ON THE CONSTRUCTION
SITE.
2. CONSTRUCTION MATERIALS AND THEIR PACKAGING
A. EROSION CONTROL MEASURE SHOWN ON THE SUBJECT PROJECT SHALL BE IMPLEMENTED
PRIOR TO AND DURING CONSTRUCTION IN THE PROPER SEQUENCING TO MINIMIZE SOIL
EROSION. EROSION CONTROLS SHALL BE INSPECTED AND MAINTAINED AS DESCRIBED
ELSEWHERE ON THE PLANS. EXCESSIVE DUSTING OF SOIL ON THE SITE SHALL BE MINIMIZED
BY REDUCING CONSTRUCTION TRAFFIC ACROSS BARE SOIL DURING DRY AND/OR WINDY
WEATHER, AND BY APPLYING WATER OR OTHER ACCEPTABLE DUST CONTROL MEASURES TO
THE SOIL. UPON COMPLETION OF CONSTRUCTION AND SUITABLE ESTABLISHMENT OF
PERMANENT VEGETATION, TEMPORARY EROSION CONTROL MEASURES SUCH AS SILT FENCE,
CHECK DAMS AND INLET PROTECTION DEVICES SHALL BE REMOVED IN A MANNER TO MINIMIZE
ADDITIONAL LAND DISTURBANCE. ANY AREAS DISTURBED BY THESE OPERATIONS SHALL BE
PROPERLY REVEGATATED.
B. LARGE WASTE MATERIALS CREATED BY CUTTING, SAWING, DRILLING, OR OTHER OPERATIONS
SHALL BE PROPERLY DISPOSED OF IN SUITABLE WASTE CONTAINERS. THE SITE SHALL BE
CHECKED AT THE END OF THE DAY, AS A MINIMUM, AND ALL WASTE MATERIALS, INCLUDING
THOSE BLOWN ACROSS OR OFF THE SITE BY WIND SHALL BE PICKED UP AND DISPOSED OF IN
SUITABLE CONTAINERS. WHERE POSSIBLE, OPERATIONS SUCH AS SAWING THAT CREATE
SMALL PARTICLES SHOULD BE PERFORMED IN ONE SPOT IN AN AREA PROTECTED FROM WIND,
AND WASTE PARTICLES COLLECTED AND DISPOSED OF FREQUENTLY TO MINIMIZE WIND
DISPERSAL. PACKAGING USED TO TRANSPORT MATERIALS TO THE SITE FOR CONSTRUCTION
OF THE FACILITY SHALL BE DISPOSED OF PROPERLY, WHETHER THE MATERIAL IS TAKEN OUT
OF ITS PACKAGE AND INCORPORATED INTO THE PROJECT IMMEDIATELY OR STORED ONSITE
FOR FUTURE USE. PACKAGED MATERIALS STORED ONSITE SHALL BE INSPECTED REGULARLY
AND ANY LOOSE PACKAGING SHALL BE REPAIRED OR DISPOSED OF PROPERLY.
C. ALL DEWATERING OF ACTIVITIES SHALL BE DONE IN ACCORDANCE TO GOOD EROSION
CONTROL PRACTICES. THESE PRACTICES SHOULD INCLUDE THE USE OF DIRT BAGS SUCH AS
SILT FENCE INLET PROTECTION. THE USE OF THESE TYPES OF DEWATERING DEVICES WILL
REMOVE LARGE QUANTITIES OF SILT, SEDIMENT, AND DIRT AND PREVENT THESE MATERIALS
TO ENTER THE STORM SEWER SYSTEM.
D. IF THE USE OF LIME IS USED TO STABILIZE THE SOIL OF THE SITE THEN ALL CONSTRUCTION
EQUIPMENT USED SHALL BE CLEANED OF ALL EXCESS MATERIAL WITH WATER IN THE
MAINTENANCE AND REFUELING AREA AS SHOWN WITHIN THESE PLANS.
E. NUTRIENTS AND FERTILIZERS SHALL ONLY BE USED TO ESTABLISH RAPID VEGETATION. WHEN
THESE PRODUCTS ARE UTILIZED, THE USER SHOULD PAY STRICT ATTENTION TO THE
PRODUCTS RECOMMENDED USAGE.
3. CONCRETE WASTE WATER
A. ALL CONCRETE WASTEWATER SHALL BE DISPOSED OF IN THE DESIGNED AREA AS DIRECTED
BY THE CONSTRUCTION MANAGER. THIS AREA IS TO BE A 3' DEEP, 10' SQUARE PIT AS DETAILED
ON THE EROSION CONTROL PLAN. THIS AREA SHALL BE INSPECTED ON A DAILY BASIS AT A
MINIMUM. WHEN THIS AREA BECOMES FULL, THE POLLUTANTS SHALL BE EXCAVATED, PLACED
IN AN ACCEPTABLE CONTAINER AND DISPOSED OF IN PROPER MANNER, BY THE EXCAVATION
CONTRACTOR.
4. PAINT PRODUCTS
A. ALL EXCESS PAINT AND THEIR RELATED PRODUCTS SHALL BE DISPOSED OF IN THE MANNER AT
WHICH THE MANUFACTURER SUGGESTS. UNDER NO CIRCUMSTANCES WILL PAINT OR THEIR
RELATED PRODUCTS BE CLEANED OR DISPOSED OF IN SOIL, SANITARY SEWERS, STORM
SEWERS OR DETENTION BASINS. ANY VIOLATION OF THIS SHALL BE REPORTED TO THE JOB
SUPERINTENDENT. IN THE EVENT OF ACCIDENTALLY CONTAMINATION ALL EFFORTS SHOULD BE
MADE TO REMOVE CONTAMINANTS IN AN APPROPRIATE MANNER. THE CITY OF CARMEL FIRE
DEPARTMENT SHOULD BE CONTACTED IMMEDIATELY TO DETERMINE IF FURTHER MEASURES
ARE NEEDED.
3. SPILLS TO SOIL:
A. SPILLS OF HAZARDOUS SUBSTANCES OR EXTREMELY HAZARDOUS SUBSTANCES WHEN
THE AMOUNT SPILLED EXCEEDS ONE HUNDRED (100) POUNDS OR THE REPORTABLE
QUANTITY, WHICHEVER IS LESS;
B. SPILLS OF PETROLEUM WHEN THE AMOUNT SPILLED EXCEEDS FIFTY-FIVE (55) GALLONS;
OR
C. SPILLS OF OBJECTIONABLE SUBSTANCES AS DEFINED IN SECTION 4(11) OF THIS RULE.
4. ANY SPILL FOR WHICH A SPILL RESPONSE HAS NOT BEEN DONE. (WATER POLLUTION CONTROL
BOARD; 327 IAC 2-6.1-6; FILED FEB 25, 1997, 1:00 P.M.: 20 IR 1733; READOPTED FILED JAN 10, 2001,
3:23 P.M.: 24 IR 1518; READOPTED FILED NOV 21, 2007, 1:16 P.M.: 20071219-IR-327070553BFA)
327 IAC 2-6.1-7 REPORTABLE SPILLS; RESPONSIBILITIES
AUTHORITY: IC 13-14-8-7
AFFECTED: IC 13-11-2; IC 13-18-1; IC 13-18-3; IC 13-18-8; IC 13-18-17
SEC. 7. ANY PERSON WHO OPERATES, CONTROLS, OR MAINTAINS ANY MODE OF
TRANSPORTATION OR FACILITY FROM WHICH A SPILL OCCURS SHALL, UPON DISCOVERY OF A
REPORTABLE SPILL TO THE SOIL OR SURFACE WATERS OF THE STATE, DO THE FOLLOWING:
1. CONTAIN THE SPILL, IF POSSIBLE, TO PREVENT ADDITIONAL SPILLED MATERIAL FROM ENTERING
THE WATERS OF THE STATE.
2. UNDERTAKE OR CAUSE OTHERS TO UNDERTAKE ACTIVITIES NEEDED TO ACCOMPLISH A SPILL
RESPONSE.
3. AS SOON AS POSSIBLE, BUT WITHIN TWO (2) HOURS OF DISCOVERY, COMMUNICATE A SPILL
REPORT TO THE DEPARTMENT OF ENVIRONMENTAL MANAGEMENT, OFFICE OF LAND QUALITY,
EMERGENCY RESPONSE SECTION: AREA CODE 1-888-233-7745 FOR IN-STATE CALLS (TOLL FREE),
(317) 233-7745 FOR OUT-OF-STATE CALLS. IF NEW OR UPDATED SPILL REPORT INFORMATION
BECOMES KNOWN THAT INDICATES A SIGNIFICANT INCREASE IN THE LIKELIHOOD OF DAMAGE TO
THE WATERS OF THE STATE, THE RESPONSIBLE PARTY SHALL NOTIFY THE DEPARTMENT AS
SOON AS POSSIBLE BUT WITHIN TWO (2) HOURS OF THE TIME THE NEW OR UPDATED
INFORMATION BECOMES KNOWN.
4. SUBMIT TO THE INDIANA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT, OFFICE OF LAND
QUALITY, EMERGENCY RESPONSE SECTION (MC 66-30), 2525 N. SHADELAND AVE., SUITE 100,
INDIANAPOLIS, IN 46219-1787, A WRITTEN COPY OF THE SPILL REPORT IF REQUESTED IN WRITING
BY THE DEPARTMENT.
5. EXCEPT FROM MODES OF TRANSPORTATION OTHER THAN PIPELINES, EXERCISE DUE DILIGENCE
AND DOCUMENT ATTEMPTS TO NOTIFY THE
6. FOLLOWING:
A. FOR SPILLS TO SURFACE WATER THAT CAUSE DAMAGE, THE NEAREST AFFECTED
DOWNSTREAM WATER USER LOCATED WITHIN TEN (10) MILES OF THE SPILL AND IN THE
STATE OF INDIANA; AND
B. FOR SPILLS TO SOIL OUTSIDE THE FACILITY BOUNDARY, THE AFFECTED PROPERTY
OWNER OR OWNERS, OPERATOR OR OPERATORS, OR OCCUPANT OR OCCUPANTS.
(WATER POLLUTION CONTROL BOARD; 327 IAC 2-6.1-7; FILED FEB 25, 1997, 1:00 P.M.: 20 IR
1733; READOPTED FILED JAN 10, 2001, 3:23 P.M.: 24 IR 1518; ERRATA FILED FEB 6, 2006, 11:15
A.M.: 29 IR 1936; ERRATA FILED OCT 20, 2006, 10:08 A.M.: 20061101-IR-327060497ACA;
READOPTED FILED NOV 21, 2007, 1:16 P.M.: 20071219-IR-327070553BFA; ERRATA FILED MAY
27, 2008, 2:06 P.M.: 20080625-IR-327080419ACA)
327 IAC 2-6.1-8 EMERGENCY SPILL RESPONSE ACTIONS
AUTHORITY: IC 13-14-8-7
AFFECTED: IC 13-11-2; IC 13-18-1; IC 13-18-3; IC 13-18-8; IC 13-18-17
SEC. 8. NOTWITHSTANDING ANY OTHER SECTION OF THIS RULE, EMERGENCY SPILL RESPONSE
ACTIONS TAKE PRECEDENCE OVER REPORTING REQUIREMENTS, AND WHEN EMERGENCY SPILL
RESPONSE ACTIVITIES RENDER SPILL REPORTING INCONSISTENT WITH EFFECTIVE RESPONSE
ACTIVITIES, COMMUNICATION OF THE SPILL REPORT TO THE INDIANA DEPARTMENT OF
ENVIRONMENTAL MANAGEMENT MAY BE DELAYED. IN SITUATIONS WHERE THE SPILL REPORT IS
DELAYED, THE BURDEN OF PROVING THE NEED FOR THE DELAY SHALL BE UPON THE RESPONSIBLE
PERSON. (WATER POLLUTION CONTROL BOARD; 327 IAC 2-6.1-8; FILED FEB 25, 1997, 1:00 P.M.: 20 IR 1734;
READOPTED FILED JAN 10, 2001, 3:23 P.M.: 24 IR 1518; READOPTED FILED NOV 21, 2007, 1:16 P.M.:
20071219-IR-327070553BFA)
327 IAC 2-6.1-9 COMPLIANCE CONFIRMATION
AUTHORITY: IC 13-14-8-7
AFFECTED: IC 13-11-2; IC 13-18-1; IC 13-18-3; IC 13-18-8; IC 13-18-17
SEC. 9. WHEN SPILL REPORTING AND RESPONSE, AS PROVIDED FOR IN THIS RULE, HAS
OCCURRED, THE DEPARTMENT SHALL, UPON REQUEST, ISSUE A LETTER CONFIRMING COMPLIANCE
WITH THIS RULE AND STATING THAT NO FURTHER ACTION IS REQUIRED UNDER THIS RULE. (WATER
POLLUTION CONTROL BOARD; 327 IAC 2-6.1-9; FILED FEB 25, 1997, 1:00 P.M.: 20 IR 1734; READOPTED
FILED JAN 10, 2001, 3:23 P.M.: 24 IR 1518; READOPTED FILED NOV 21, 2007, 1:16 P.M.:
20071219-IR-327070553BFA)
SOILS TYPE LEGEND
YcIA CROSBY SILT LOAM
FINE-LOAMY SUBSOIL - URBAN LAND COMPLEX, 0 TO 2 PERCENT SLOPES
YmsB2 MIAMI SILT LOAM
URBAN LAND COMPLEX, 2 TO 6 PERCENT SLOPES, ERODED
YmsD2 MIAMI SILT LOAM
URBAN LAND COMPLEX, 12 TO 18 PERCENT SLOPES, ERODED.
SECTION 1 - EMERGENCY RESPONSE NUMBERS
EMERGENCY FOR ANY LIFE THREATENING PROBLEM 911
CITY OF CARMEL FIRE DEPARTMENT 317-571-2600
CITY OF CARMEL POLICE DEPARTMENT 317-571-2500
INDIANA DEPT. OF NATURAL RESOURCES 812-477-8773
INDIANA DEPT. OF ENVIRONMENTAL MANAGEMENT 317-233-7745
HAMILTON COUNTY SOIL AND WATER 317-773-1406
CITY OF CARMEL ENGINEERING 317-571-2441
RULE 6. SPILLS OF OIL AND OTHER OBJECTIONABLE
SUBSTANCES; REPORTING, CONTAINMENT AND
CLEANUP
(REPEALED BY WATER POLLUTION CONTROL BOARD; FILED FEB 25, 1997, 1:00 P.M.: 20 IR 1734)
RULE 6.1. SPILLS; REPORTING, CONTAINMENT, AND RESPONSE
327 IAC 2-6.1-1 APPLICABILITY
AUTHORITY: IC 13-14-8-7
AFFECTED: IC 13-11-2; IC 13-18-1; IC 13-18-3; IC 13-18-8; IC 13-18-17
SEC. 1. THIS RULE APPLIES TO THE REPORTING AND CONTAINMENT OF, AND THE RESPONSE TO
THOSE SPILLS OF HAZARDOUS SUBSTANCES,
EXTREMELY HAZARDOUS SUBSTANCES, PETROLEUM, AND OBJECTIONABLE SUBSTANCES THAT ARE OF
A QUANTITY, TYPE, DURATION AND IN A LOCATION AS TO DAMAGE THE WATERS OF THE STATE.
NOTHING IN THIS RULE IS INTENDED TO AFFECT REPORTING OR CLEAN-UP REQUIREMENTS SET FORTH
BY OTHER FEDERAL, STATE, OR LOCAL LAWS. (WATER POLLUTION CONTROL BOARD; 327 IAC 2-6.1-1;
FILED FEB 25, 1997, 1:00 P.M.: 20 IR 1731; READOPTED
FILED JAN 10, 2001, 3:23 P.M.: 24 IR 1518; READOPTED FILED NOV 21, 2007, 1:16 P.M.:
20071219-IR-327070553BFA)
327 IAC 2-6.1-2 SPECIAL AREAS
AUTHORITY: IC 13-14-8-7
AFFECTED: IC 13-11-2; IC 13-18-1; IC 13-18-3; IC 13-18-8; IC 13-18-17
SEC. 2. CERTAIN AREAS OF THE STATE ARE RECOGNIZED AS HAVING UNIQUE GEOLOGY. A LARGE
SECTION OF THE MID-SOUTHERN PART OF THE STATE IS A KARST REGION. PORTIONS OF SAINT
JOSEPH, ELKHART, KOSCIUSKO, AND LAGRANGE COUNTIES CONTAIN A SOLE SOURCE AQUIFER AS
REFERENCED
IN 42 U.S.C. 300H-3(E). THE WATERS OF THE STATE ARE PARTICULARLY VULNERABLE TO DAMAGE FROM
SPILLS IN THESE AREAS, AND CARE SHOULD BE EXERCISED WHEN EVALUATING DAMAGE FROM SPILLS.
INFORMATION ABOUT THESE AREAS CAN BE OBTAINED BY CALLING THE DEPARTMENT OF
ENVIRONMENTAL MANAGEMENT, OFFICE OF LAND QUALITY, EMERGENCY RESPONSE SECTION: AREA
CODE 1-888-233-7745 FOR IN-STATE CALLS (TOLL FREE), (317) 233-7745 FOR OUT-OF-STATE CALLS.
(WATER POLLUTION CONTROL BOARD; 327 IAC 2-6.1-2; FILED FEB 25, 1997, 1:00 P.M.: 20 IR 1731;
READOPTED FILED JAN 10, 2001, 3:23 P.M.: 24 IR 1518; READOPTED FILED NOV 21, 2007, 1:16 P.M.:
20071219-IR-327070553BFA; ERRATA FILED MAY 27, 2008, 2:06 P.M.: 20080625-IR-327080419ACA)
327 IAC 2-6.1-3 EXCLUSIONS
AUTHORITY: IC 13-14-8-7
AFFECTED: IC 13-11-2; IC 13-18-1; IC 13-18-3; IC 13-18-8; IC 13-18-17
SEC. 3. NOTWITHSTANDING ANY OTHER SECTION OF THIS RULE, THE REPORTING REQUIREMENT
OF THIS RULE DOES NOT APPLY TO THE FOLLOWING
OCCURRENCES:
1. DISCHARGES OR EXCEEDANCES THAT ARE UNDER THE JURISDICTION OF AN APPLICABLE PERMIT
WHEN THE SUBSTANCE IN QUESTION IS COVERED BY THE PERMIT AND DEATH OR ACUTE INJURY
OR ILLNESS TO ANIMALS OR HUMANS DOES NOT OCCUR.
2. LAWFUL APPLICATION OF MATERIALS, INCLUDING, BUT NOT LIMITED TO:
A. COMMERCIAL OR NATURAL FERTILIZERS AND PESTICIDES ON OR TO LAND OR WATER; OR
B. DUST SUPPRESSION MATERIALS.
3. THE APPLICATION OF PETROLEUM NECESSARY FOR CONSTRUCTION THAT DOES NOT DAMAGE
WATERS OF THE STATE.
4. SPILLS OF LESS THAN ONE (1) POUND OR ONE (1) PINT.
5. SPILLS OF INTEGRAL OPERATING FLUIDS, IN THE USE OF MOTOR VEHICLES OR OTHER
EQUIPMENT, THE TOTAL VOLUME OF WHICH IS LESS THAN OR EQUAL TO FIFTY-FIVE (55) GALLONS
AND WHICH DO NOT DAMAGE WATERS OF THE STATE.
6. OIL SHEENS PRODUCED AS A RESULT OF THE NORMAL OPERATION OF PROPERLY FUNCTIONING
WATERCRAFT.
7. A RELEASE OF A SUBSTANCE INTEGRAL TO A SPILL RESPONSE ACTIVITY THAT HAS BEEN
APPROVED AND AUTHORIZED BY A STATE OR FEDERAL ONSCENE COORDINATOR.
(WATER POLLUTION CONTROL BOARD; 327 IAC 2-6.1-3; FILED FEB 25, 1997, 1:00 P.M.: 20 IR 1731; ERRATA
FILED MAR 7, 1997, 2:25 P.M.:
20 IR 1738; READOPTED FILED JAN 10, 2001, 3:23 P.M.: 24 IR 1518; READOPTED FILED NOV 21, 2007, 1:16
P.M.: 20071219-IR-327070553BFA)
NOTE: ALL HOMES SHALL MEET THE
LANDSCAPING REQUIREMENTS PER
THE ZONING COMMITMENTS.
- FINISH GRADE/WATER FLOW
- PROPERTY LINE/DRAINAGE SWALE
- PERMANENT SEEDING
- RIP RAP/GRAVEL DRIVE/EXIT PAD
BEEHIVE INLETS (SEE DETAIL)
SILT FENCE BOX AROUND
CURB INLET PROTECTION (SEE DETAIL)
CONSTRUCTION
ENTRANCE/EXIT
SAMPLE EROSION/SEDIMENT CONTROL PRACTICE PLAN FOR
A TYPICAL ONE/TWO FAMILY DWELLING UNDER
CONSTRUCTION
CURB & GUTTER
PROTECTION
CURB INLET
STREET CENTERLINE
4' CONCRETE WALK
SF
PS
PS
4' CONCRETE WALK
PS
GARAGE
SEEDED AND MULCHED
SIDE YARDPS DRAINAGE SWALEHOUSE
BY OWNER AT COMPLETIONOF CONSTRUCTION (TYP.)
PS
AREA TO BE TOPSOILED,
PS
PS
DRAINAGE SWALEPS SIDE YARDPS
STOCKPILE
TOPSOIL
SF
STOCKPILE
SUBSOILSF SF
PS
SF
SFDRAINAGE SWALEREAR YARD
AREA MAPW
S
N
E PROJECT LOCATION
SOILS MAPW
S
N
E
EROSION CONTROL PLAN
PLAN NOTES
1. THIS PLAN IS DESIGNED TO PREVENT ANY AND ALL SEDIMENT FROM LEAVING
THE SITE. THE OWNER SHALL TAKE PREVENTATIVE ACTION IMMEDIATELY. IF
NEEDED TO PREVENT EROSION OR LOSS OF SEDIMENT FROM THE SITE.
2. TEMPORARY SEEDING IS TO BE APPLIED TO ANY GRADED AREA THAT WILL
REMAIN UNALTERED FOR AN EXTENDED PERIOD OF TIME.
3. PERMANENT SEEDING IS TO BE APPLIED IMMEDIATELY TO AREAS THAT HAVE
ACHIEVED FINAL AND FINISHED GRADE.
4. PRESERVE EXISTING VEGETATION ON THE SITE WHENEVER AND WHEREVER
POSSIBLE TO PREVENT TOPSOIL EROSION.
5. ALL SEDIMENT CAPTURING MEASURES ARE TO BE IMPLEMENTED PRIOR TO THE
DISTURBANCE OF THE CONSTRUCTION AREA THEY ARE INTENDED TO SERVICE.
6. ALL EROSION CONTROL MEASURES ARE TO BE PROPERLY MAINTAINED TO
CONTINUE THEIR EFFECTIVENESS.
7. IF GRADING OCCURS DURING DECEMBER, JANUARY OR FEBRUARY, DORMANT
SEEDING PROCEDURES SHALL BE USED.
8. DURING DRY WEATHER, KEEP LAWNS WATERED BY APPROVED METHODS.
RESEED ANY AREAS NOT GERMINATING OR DAMAGED AT INTERVALS AS MAY BE
REQUIRED ACCORDING TO SEASONAL CONDITIONS AND/OR CONSTRUCTION
ACTIVITY. WATER GRASS AND EXECUTE NECESSARY WEEDING UNTIL FULL
STAND OF GRASS HAS BEEN OBTAINED.
9. THE IMPLEMENTATION AND MAINTENANCE OF THE EROSION CONTROL IS THE
SOLE RESPONSIBILITY OF THE CONTRACTOR AND/OR OWNER.
10. IT SHALL BE THE CONTRACTOR'S AND/OR OWNER'S RESPONSIBILITY TO
MINIMIZE SEDIMENTATION FROM ON-SITE CONSTRUCTION ACTIVITIES FROM
BEING DEPOSITED ONTO ADJACENT PROPERTIES AND RECEIVING
STREAMS/DITCHES IN STRICT COMPLIANCE WITH "RULE 5" (327 IAC 15-5,
CONSTRUCTION ACTIVITY STORMWATER RUNOFF CONTROL).IT SHALL ALSO BE
THE CONTRACTOR'S OR OWNER'S RESPONSIBILITY TO OBTAIN ANY APPROVALS
REQUIRED FROM THE LOCAL AUTHORITY AND TO SUBMIT A COMPLETE NOTICE
OF INTENT LETTER TO THE OFFICE OF WATER MANAGEMENT, INDIANA
DEPARTMENT OF ENVIRONMENTAL MANAGEMENT PRIOR TO ANY
CONSTRUCTION ACTIVITY.
11. PROVIDE - #2 CRUSHED STONE CONSTRUCTION ENTRANCE(S) TO SITE FROM
STREETS/ROADS.
12. IT SHALL BE THE CONTRACTOR'S AND/OR OWNER'S RESPONSIBILITY TO
IMPLEMENT AN EROSION CONTROL PLAN FOR EACH LOT, THE BUILDER MAY
IMPLEMENT A DIFFERENT EROSION CONTROL PLAN AS LONG AS IT MEETS OR
EXCEEDS RULE 5 REGULATIONS.
INDIVIDUAL LOT EROSION
CONTROL PLAN LEGEND
Know what'sbelow.
before you dig.Call
R
NO SCALE
327 IAC 2-6.1-4 DEFINITIONS
AUTHORITY: IC 13-14-8-7
AFFECTED: IC 13-11-2; IC 13-18-1; IC 13-18-3; IC 13-18-8; IC 13-18-17; IC 14-8-2-7; IC 14-25-7-13; IC 14-25-7-15
SEC. 4. IN ADDITION TO THE DEFINITIONS CONTAINED IN IC 13-11-2-17(D), IC 13-11-2-35(A), IC
13-11-2-51, IC 13-11-2-158(A), IC 13-11-2-160, IC 13-11-2-260, IC 13-11-2-265, AND IN 327 IAC 1, THE
FOLLOWING DEFINITIONS APPLY THROUGHOUT THIS RULE:
1. "ANIMAL" MEANS ALL MAMMALS, BIRDS, REPTILES, AMPHIBIANS, FISH, CRUSTACEANS, AND
MOLLUSKS.
2. "AQUATIC LIFE" MEANS THOSE PLANTS AND MACROINVERTEBRATES THAT ARE DEPENDENT UPON
AN AQUATIC ENVIRONMENT.
3. "CONTAIN" MEANS TO TAKE SUCH IMMEDIATE ACTION AS NECESSARY TO DAM, BLOCK, RESTRAIN,
OR OTHERWISE ACT TO MOST EFFECTIVELY PREVENT A SPILL FROM ENTERING WATERS OF THE
STATE OR MINIMIZE DAMAGE TO THE WATERS OF THE STATE FROM A SPILL.
4. "DAMAGE" MEANS THE ACTUAL OR IMMINENT ALTERATION OF THE WATERS OF THE STATE SO AS
TO RENDER THE WATERS HARMFUL, DETRIMENTAL, OR INJURIOUS TO:
A. PUBLIC HEALTH, SAFETY, OR WELFARE;
B. DOMESTIC, COMMERCIAL, INDUSTRIAL, AGRICULTURAL, OR RECREATIONAL USES; OR
C. ANIMALS OR AQUATIC LIFE.
5. "DOWNSTREAM WATER USER" MEANS:
A. A COMMUNITY PUBLIC WATER SUPPLY, AS IDENTIFIED BY THE
DEPARTMENT OF NATURAL RESOURCES UNDER IC 14-25-7-13(D);
B. A SIGNIFICANT WATER WITHDRAWAL FACILITY AS REGISTERED WITH THE
DEPARTMENT OF NATURAL RESOURCES UNDER IC 14-25-7-15;
C. USERS OF RECREATIONAL WATERS; OR
D. ANY OTHER USER MADE KNOWN TO THE PERSON WHO HAS A SPILL.
6. "EXTREMELY HAZARDOUS SUBSTANCE" MEANS A SUBSTANCE IDENTIFIED PURSUANT TO 42 U.S.C.
11002 AND 11004. (40 CFR 355 APPENDIX A.)
7. "FACILITY" MEANS ALL LAND, BUILDINGS, EQUIPMENT, STRUCTURES, AND OTHER STATIONARY
ITEMS THAT ARE LOCATED ON A SINGLE SITE OR ON CONTIGUOUS SITES AND THAT ARE OWNED
OR OPERATED BY THE SAME PERSON OR BY ANY PERSON WHO CONTROLS, IS CONTROLLED BY,
OR IS UNDER COMMON CONTROL WITH, SUCH PERSON.
8. "FACILITY BOUNDARY" MEANS THE BOUNDARY OF A FACILITY OR AN EASEMENT OR
RIGHT-OF-WAY.
9. "HAZARDOUS SUBSTANCE" HAS THE MEANING SET FORTH IN 42 U.S.C. 9601(14).
10. "MODE OF TRANSPORTATION" INCLUDES, BUT IS NOT LIMITED TO, CARRIAGE BY:
A. RAIL AND MOTOR VEHICLES;
B. AIRCRAFT;
C. WATERCRAFT;
D. PIPELINES; OR
E. OTHER MEANS OF TRANSPORTATION; IN COMMERCE. THIS DEFINITION EXCLUDES
CARRIAGE WITHIN A FACILITY BY TRANSPORTATION EQUIPMENT OWNED, OPERATED, OR
CONTROLLED BY THAT FACILITY.
11. "OBJECTIONABLE SUBSTANCES" MEANS SUBSTANCES THAT ARE:
A. OF A QUANTITY AND A TYPE; AND
B. PRESENT FOR A DURATION AND IN A LOCATION; SO AS TO DAMAGE WATERS OF THE
STATE. THIS DEFINITION EXCLUDES HAZARDOUS SUBSTANCES, EXTREMELY HAZARDOUS
SUBSTANCES, PETROLEUM, AND MIXTURES THEREOF.
12. "ON-SCENE COORDINATOR" MEANS A STATE OR FEDERAL OFFICIAL DESIGNATED BY THE
DEPARTMENT, THE UNITED STATES ENVIRONMENTAL PROTECTION AGENCY, OR THE UNITED
STATES COAST GUARD TO DIRECT AND COORDINATE SPECIAL SPILL RESPONSE ACTIVITIES.
13. "RECREATIONAL WATERS" MEANS ANY WATER USED FOR:
A. BOATING, SWIMMING, FISHING, HUNTING, TRAPPING, OR WILDLIFE VIEWING; OR
B. PUBLIC ACCESS AREAS THAT ARE OWNED BY THE DEPARTMENT OF NATURAL RESOURCES
OR THE FEDERAL GOVERNMENT; AS LISTED BY THE DEPARTMENT.
14. "REPORTABLE QUANTITY" MEANS THE AMOUNT OF A HAZARDOUS SUBSTANCE OR EXTREMELY
HAZARDOUS SUBSTANCE THAT IS REQUIRED TO BE REPORTED UNDER FEDERAL LAW UNDER 42
U.S.C. 9602(A) AND (B) AND 42 U.S.C. 9603(A). (40 CFR 302.4 OR 40 CFR 355 APPENDIX A.)
15. "SPILL" MEANS ANY UNEXPECTED, UNINTENDED, ABNORMAL, OR UNAPPROVED DUMPING,
LEAKAGE, DRAINAGE, SEEPAGE, DISCHARGE OR OTHER LOSS OF PETROLEUM, HAZARDOUS
SUBSTANCES, EXTREMELY HAZARDOUS SUBSTANCES, OR OBJECTIONABLE SUBSTANCES. THE
TERM DOES NOT INCLUDE RELEASES TO IMPERMEABLE SURFACES WHEN THE SUBSTANCE DOES
NOT MIGRATE OFF THE SURFACE OR PENETRATE THE SURFACE AND ENTER THE SOIL.
16. "SPILL RESPONSE", FOR PURPOSES OF THIS RULE, MEANS THE FOLLOWING:
A. THE SPILL IS CONTAINED; AND
B. FREE MATERIAL IS REMOVED OR NEUTRALIZED.
17. "SPILL REPORT" MEANS AN ORAL REPORT THAT INCLUDES THE FOLLOWING INFORMATION ABOUT
A SPILL, TO THE EXTENT THAT THE INFORMATION IS KNOWN AT THE TIME OF THE REPORT:
A. THE NAME, ADDRESS, AND TELEPHONE NUMBER OF THE PERSON MAKING THE SPILL
REPORT.
B. (THE NAME, ADDRESS, AND TELEPHONE NUMBER OF A CONTACT PERSON IF DIFFERENT
FROM CLAUSE (A).
C. THE LOCATION OF THE SPILL.
D. THE TIME OF THE SPILL.
E. THE IDENTIFICATION OF THE SUBSTANCE SPILLED.
F. THE APPROXIMATE QUANTITY OF THE SUBSTANCE THAT HAS BEEN OR MAY FURTHER BE
SPILLED.
G. THE DURATION OF THE SPILL.
H. THE SOURCE OF THE SPILL.
I. NAME AND LOCATION OF THE WATERS DAMAGED.
J. THE IDENTITY OF ANY RESPONSE ORGANIZATION RESPONDING TO THE SPILL.
K. WHAT MEASURES HAVE BEEN OR WILL BE UNDERTAKEN TO PERFORM A SPILL RESPONSE.
L. ANY OTHER INFORMATION THAT MAY BE SIGNIFICANT TO THE RESPONSE ACTION.
18. "WATERS", AS DEFINED IN IC 13-11-2-265, MEANS THE ACCUMULATIONS OF WATER, SURFACE AND
UNDERGROUND, NATURAL AND ARTIFICIAL, PUBLIC AND PRIVATE, OR PARTS THEREOF, THAT ARE
WHOLLY OR PARTIALLY WITHIN, FLOW THROUGH, OR BORDER UPON THIS STATE. THE TERM DOES
NOT INCLUDE ANY PRIVATE POND OR ANY OFF-STREAM POND, RESERVOIR, OR FACILITY BUILT
FOR REDUCTION OR CONTROL OF POLLUTION OR COOLING OF WATER PRIOR TO DISCHARGE
UNLESS THE DISCHARGE FROM THE POND, RESERVOIR, OR FACILITY CAUSES OR THREATENS TO
CAUSE WATER POLLUTION. (WATER POLLUTION CONTROL BOARD; 327 IAC 2-6.1-4; FILED FEB 25,
1997, 1:00 P.M.: 20 IR 1731; ERRATA FILED MAR 7, 1997, 2:25 P.M.: 20 IR 1738; READOPTED FILED JAN
10, 2001, 3:23 P.M.: 24 IR 1518; READOPTED FILED NOV 21, 2007, 1:16 P.M.:
20071219-IR-327070553BFA)
327 IAC 2-6.1-5 REPORTABLE SPILLS; FACILITY
AUTHORITY: IC 13-14-8-7
AFFECTED: IC 13-11-2; IC 13-18-1; IC 13-18-3; IC 13-18-8; IC 13-18-17
SEC. 5. THE FOLLOWING SPILLS FROM A FACILITY MUST BE REPORTED:
1. SPILLS THAT DAMAGE THE WATERS OF THE STATE SO AS TO CAUSE DEATH OR ACUTE INJURY OR
ILLNESS TO HUMANS OR ANIMALS.
2. SPILLS FROM A FACILITY THAT HAS BEEN NOTIFIED IN WRITING BY A WATER UTILITY THAT IT IS
LOCATED IN A DELINEATED PUBLIC WATER SUPPLY WELLHEAD PROTECTION AREA AS APPROVED
BY THE DEPARTMENT UNDER 327 IAC 8-4.1 THAT ARE:
A. SPILLS OF HAZARDOUS SUBSTANCES OR EXTREMELY HAZARDOUS SUBSTANCES WHEN
THE AMOUNT SPILLED EXCEEDS ONE HUNDRED (100) POUNDS OR THE REPORTABLE
QUANTITY, WHICHEVER IS LESS;
B. SPILLS OF PETROLEUM WHEN THE AMOUNT SPILLED EXCEEDS FIFTY-FIVE (55) GALLONS;
OR
C. SPILLS OF OBJECTIONABLE SUBSTANCES AS DEFINED IN SECTION 4(11) OF THIS RULE.
3. SPILLS THAT DAMAGE WATERS OF THE STATE AND THAT:
A. ARE LOCATED WITHIN FIFTY (50) FEET OF A KNOWN PRIVATE DRINKING WATER WELL
LOCATED BEYOND THE FACILITY PROPERTY BOUNDARY; OR
B. ARE LOCATED WITHIN ONE HUNDRED (100) YARDS OF:
· ANY HIGH QUALITY WATER DESIGNATED AS AN OUTSTANDING STATE RESOURCE
PURSUANT TO 327 IAC 2-1-2(3), EXCLUDING LAKE MICHIGAN;
· ANY WATER DESIGNATED AS EXCEPTIONAL USE PURSUANT TO 327 IAC 2-13(A)(6) [SIC.,
327 IAC 2-1-3(A)(6)] AND 327 IAC 2-1-11(B);
· ANY WATER DESIGNATED AS CAPABLE OF SUPPORTING A SALMONID FISHERY
PURSUANT TO 327 IAC 2-1-6(C)(1), EXCEPT LAKE MICHIGAN; OR
· ANY WATER THAT IS A FISH HATCHERY, FISH AND WILDLIFE AREA, NATURE PRESERVE,
OR RECREATIONAL WATER OWNED BY THE DEPARTMENT OF NATURAL RESOURCES
OR THE FEDERAL GOVERNMENT.
4. FOR ANY SPILL WHICH DOES NOT MEET THE CRITERIA IN SUBDIVISIONS (1) THROUGH (3), THE
FOLLOWING MUST BE REPORTED:
A. SPILLS TO SURFACE WATERS:
· SPILLS OF HAZARDOUS SUBSTANCES OR EXTREMELY HAZARDOUS SUBSTANCES
WHEN THE AMOUNT SPILLED EXCEEDS ONE HUNDRED (100) POUNDS OR THE
REPORTABLE QUANTITY, WHICHEVER IS LESS;
· SPILLS OF PETROLEUM OF SUCH QUANTITY AS TO CAUSE A SHEEN UPON THE
WATERS;OR
· SPILLS OF OBJECTIONABLE SUBSTANCES AS DEFINED IN SECTION 4(11) OF THIS RULE.
B. SPILLS TO SOIL BEYOND THE FACILITY BOUNDARY:
· SPILLS OF HAZARDOUS SUBSTANCES OR EXTREMELY HAZARDOUS SUBSTANCES
WHEN THE AMOUNT SPILLED EXCEEDS ONE HUNDRED (100) POUNDS OR THE
REPORTABLE QUANTITY, WHICHEVER IS LESS;
· SPILLS OF PETROLEUM WHEN THE AMOUNT SPILLED EXCEEDS FIFTY-FIVE (55)
GALLONS;OR
· SPILLS OF OBJECTIONABLE SUBSTANCES AS DEFINED IN SECTION 4(11) OF THIS RULE.
C. SPILLS TO SOIL WITHIN THE FACILITY BOUNDARY:
· SPILLS OF HAZARDOUS SUBSTANCES OR EXTREMELY HAZARDOUS SUBSTANCES
WHEN THE AMOUNT SPILLED EXCEEDS THE REPORTABLE QUANTITY;
· SPILLS OF PETROLEUM WHEN THE SPILLED AMOUNT EXCEEDS ONE THOUSAND (1,000)
GALLONS; OR
· SPILLS OF OBJECTIONABLE SUBSTANCES AS DEFINED IN SECTION 4(11) OF THIS RULE.
5. ANY SPILL FOR WHICH A SPILL RESPONSE HAS NOT BEEN DONE.
(WATER POLLUTION CONTROL BOARD; 327 IAC 2-6.1-5; FILED FEB 25, 1997, 1:00 P.M.: 20 IR 1732; ERRATA
FILED MAR 7, 1997, 2:25 P.M.: 20 IR 1738; READOPTED FILED JAN 10, 2001, 3:23 P.M.: 24 IR 1518;
READOPTED FILED NOV 21, 2007, 1:16 P.M.: 20071219-IR-327070553BFA)
327 IAC 2-6.1-6 REPORTABLE SPILLS; TRANSPORTATION
AUTHORITY: IC 13-14-8-7
AFFECTED: IC 13-11-2; IC 13-18-1; IC 13-18-3; IC 13-18-8; IC 13-18-17
SEC. 6. THE FOLLOWING SPILLS FROM A MODE OF TRANSPORTATION MUST BE REPORTED:
1. SPILLS THAT DAMAGE THE WATERS OF THE STATE SO AS TO CAUSE DEATH OR ACUTE INJURY OR
ILLNESS TO HUMANS OR ANIMALS.
2. SPILLS THAT DAMAGE SURFACE WATERS.
SF SF C202 SWPPP SpecsC202SWPPP SPECS & DETAILSW210497BCHW210497 xxxDAS----10 9 abcd8 7 6 efgh10 9 8 7 6 REVISIONS AND ISSUES5 4 3 2 1
PROJECT NO.
SHEET NO.abcd5 4 3 2 CHECKED BY:DRAWN BY:DESIGNED BY:DWG NAME:PROJECT NO.:DATEBYeDATE:1
LOCATION: H:\2021\W210497\Engineering\design\conset\C202 SWPPP Specs.dwgLAYOUT: C202DATE/TIME: August 11, 2022 - 7:32amPLOTTED BY: HansenbfhgENGINEERS317 | 846 - 6611800 | 452 - 6408317 | 843 - 0546faxWEIHELand Surveying | Civil EngineeringLandscape ArchitectureALLAN H. WEIHE, P.E., L.S. - FOUNDER10505 N. College AvenueIndianapolis, Indiana 46280weihe.netBuild with confidence.S MPart of Section 11, Township 17 North, Range 3 East, Clay Township, Hamilton County, IndianaREVISED PER TAC COMMENTS05-13-2022 TPG/BCHREVISED PER TRICO COMMENTS05-19-2022 BCHREVISED PER TAC COMMENTS06-28-2022 TPG/BCHREVISED PER TAC COMMENTS08-10-2022 TPG/BCH340 SANNER COURT, INDIANAPOLIS, IN 46290THE RESERVE AT SPRINGMILL, SECTION 2,REPLAT OF LOTS 68, 69C, 70C, & 71SWPPP FOR CONSTRUCTION SITES
1. HYDROLOGIC UNIT CODE (14 DIGIT) - 05120201090060
2. IDENTIFICATION OF ALL RECEIVING WATERS - WILLIAMS CREEK
3. PRE-CONSTRUCTION AND POST-CONSTRUCTION ESTIMATE OF PEAK DISCHARGE (10 YEAR) - Q10
PRE ?.?? CFS, Q10 POST ?.?? CFS
4. SPECIFIC POINTS WHERE STORMWATER DISCHARGE LEAVES SITE - STORM WATER WILL BE
DISCHARGED INTO EXISTING STORM SEWER SYSTEM WHICH OUTLETS TO EXISTING DETENTION
POND.
5. IDENTIFICATION OF POTENTIAL DISCHARGE TO GROUND WATER - THERE MAY BE SOME DISCHARGE
INTO THE GROUND WATER FROM THE DRAINAGE POND.
6. SOILS MAP W/ SOIL DESCRIPTIONS AND LIMITATIONS - SEE BOTTOM RIGHT OF THIS SHEET
7. DESCRIPTION OF POTENTIAL POLLUTANT SOURCES - POTENTIAL POLLUTANTS FROM
CONSTRUCTION ACTIVITY SUCH AS ASPHALT FROM PAVING; CONCRETE FROM CURBING,
SIDEWALKS, OIL, GREASE, ANTIFREEZE, GASOLINE AND DIESEL FUEL FROM CONSTRUCTION
EQUIPMENT; SOIL EROSION; FERTILIZER AND PESTICIDES FROM LANDSCAPING AND TRASH SHOULD
BE PROPERLY ATTENDED TO TO REDUCE THE CONTAMINANTS FROM ENTERING THE STORM
SYSTEM. TRASH SHOULD BE CLEANED UP TO REDUCE CLOGGING OF STORM SYSTEMS AND
REDUCE POTENTIAL BACTERIA AND/OR OTHER BIOLOGICAL AGENTS FROM ENTERING IN THE
STORM SYSTEM.
8. TEMPORARY AND PERMANENT STORMWATER QUALITY MEASURES -
A. LOCATION - SEE SHEET C200 & C201. EACH INLET WILL HAVE TEMPORARY SEDIMENT TRAPS
WITH OVERFLOW THROUGHOUT CONSTRUCTION.
B. DIMENSION - SEE SHEET C203 FOR TEMPORARY INLET PROTECTION.
C. DETAILED SPECIFICATIONS - SEE SHEETS C202, C203 & C204.
D. CONSTRUCTION DETAILS - SEE SHEETS C202, C203 & C204.
E. MONITOR AND MAINTENANCE GUIDELINES - SEE O&M MANUAL
NOTE: AS REQUIRED IN "RULE 5," SELF-MONITORING INSPECTIONS TO BE COMPLETED AT A
MINIMUM OF ONCE PER WEEK AND WITHIN 24 HOURS OR THE NEXT BUSINESS DAY OF 1
2" RAIN OR
GREATER BY A QUALIFIED INSPECTOR. INSPECTIONS MUST BE RETAINED FOR RECORDS
THROUGHOUT THE LIFE OF THE PROJECT AND PROVIDED WITHIN 48 HOURS OF A REQUEST FROM
A REGULATING AUTHORITY.
9. GENERAL CONSTRUCTION SEQUENCE -
A. A PRE-CONSTRUCTION MEETING WITH CITY OF CARMEL ENGINEERING AND SWCD IS REQUIRED
PRIOR TO THE COMMENCEMENT OF ANY EARTHWORK. ADDITIONALLY, IDEM IS REQUIRED TO BE
CONTACTED AT LEAST 48 HOURS PRIOR TO CONSTRUCTION.
B. POSTING AREA- CONTRACTOR TO POST APPROVED SWPPP DOCUMENTS AND PERMITS IN
LOCATION SHOWN ON PLANS.
C. CONSTRUCTION ENTRANCE- STRIP TOPSOIL AND PLACE STONE AT ACCESS POINT
D. INSTALL PERIMETER BMP'S SUCH AS SILT FENCING AND OFF-SITE TEMPORARY BMP'S.
E. EARTHWORK- STRIP TOPSOIL, BEGIN ROUGH GRADING, FINISH GRADE SLOPES AND SWALES.
TEMPORARY SEED ALL DISTURBED AREAS, ON-SITE AND OFF-SITE, THAT SHALL REMAIN
UN-WORKED FOR MORE THAN 14 DAYS.
F. SANITARY SEWER- INSTALL SEWER SYSTEM.
G. STORM SEWER- INSTALL STORM SEWERS SYSTEM AND INLET PROTECTION AS STORM INLETS
ARE COMPLETED.
H. UTILITIES- COORDINATE INSTALLATION OF WATER, GAS, TELEPHONE, ELECTRIC AND OTHER
REQUIRED UTILITY LINES.
I. CLEANUP - CONTRACTOR SHALL SPOIL ALL EXCESS MATERIALS, RE-GRADE AND STABILIZE ALL
AREAS DISTURBED BY UTILITY INSTALLATIONS AND RESEED.
J. FINAL GRADING AND PERMANENT EROSION CONTROL- FINISH GRADE AND PERMANENTLY SEED
ALL PROPERTY PERIMETER AREAS.
K. PAVEMENT- INSTALL STONE, BASE COURSES AND FINISHED GRADES FOR ROADWAYS, CURBS
AND ENTRY DRIVES.
L. TEMPORARY SEED ALL DISTURBED AREAS.
M. FINAL LANDSCAPING- FINAL GRADE AND INSTALL LANDSCAPING.
N. FINAL SEEDING- COMPLETE FINAL SEEDING.
O. MAINTENANCE- MAINTAIN ALL EROSION AND SEDIMENT CONTROL PRACTICES UNTIL ALL
DISTURBED AREAS ARE PERMANENTLY STABILIZED.
P. IN THE EVENT THAT THE NATIONAL WEATHER SERVICE FORECASTS RAIN TO OCCUR WITHIN 24
HOURS OF THE END OF A WORK DAY, THE CONTRACTOR SHALL STABILIZE THE SITE BEFORE
LEAVING AT THE END OF THE WORK DAY.
10. LOCATIONS OF PROPOSED SOIL STOCKPILES AND/OR BORROW/DISPOSAL AREAS - SEE SHEET
C200.
11. TEMPORARY SURFACE STABILIZATION METHOD FOR EACH SEASON - SEE SEASONAL SOIL
PROTECTION CHART ON SHEET C203.
12. EROSION AND SEDIMENT CONTROL SPECIFICATIONS FOR EACH INDIVIDUAL BUILDING LOT - SEE
BOTTOM RIGHT CORNER OF THIS SHEET.
13. MATERIAL HANDLING AND SPILL PREVENTION PLAN
THIS MATERIAL HANDLING AND SPILL PREVENTION PLAN IS BASED UPON REQUIREMENTS SET
FORTH IN THE INDIANA ADMINISTRATIVE CODE, SECTION 327 IAC 2-6-1. THE FULL TEXT OF THIS
CODE CAN BE FOUND ON THIS SHEET
POTENTIAL POLLUTANTS ON SITE MAY INCLUDE VEHICLE LUBRICANTS, OILS, VEHICULAR FUELS,
CONCRETE WASH-OUT, MULCH, PESTICIDES, HERBICIDES, FERTILIZER, AND TRASH. FUELS, OILS,
AND GASOLINE CAN LEAK OR BE SPILLED FROM TRUCKS AND CONSTRUCTION EQUIPMENT WHICH
COULD FIND THEIR WAY TO LITTLE COOL CREEK.
FOLLOW MATERIAL SAFETY DATA SHEETS (MSDS) FOR CONTAMINANTS ON-SITE. IT IS IMPORTANT
THAT ALL MANUFACTURER'S INSTRUCTIONS BE FOLLOWED WHEN USING OR APPLYING ALL
FERTILIZERS, HERBICIDES, AND PESTICIDES.
SMALL SPILLS AND LEAKS OF THESE MATERIALS ONTO NON-PAVED AREAS WILL BE SHOVELED INTO
CONTAINERS OR DUMPSTERS FOR PROPER DISPOSAL.
EMERGENCY RESPONSE NUMBERS:
RESPONSE FOR ANY LIFE THREATENING PROBLEM: 911
CARMEL FIRE DEPARTMENT: (317) 571-2600
CARMEL POLICE DEPARTMENT: (317) 571-2500
INDIANA DEPARTMENT OF NATURAL RESOURCES: (812) 477-8773
IDEM SPILL RESPONSE CENTER: (317) 233-7745
NATIONAL RESPONSE CENTER (800)-424-8802
CONTRACTOR SHALL CONTACT A WASTE RECOVERY AGENCY IMMEDIATELY FOR REMOVAL OF
CONTAMINATES AND COORDINATION OF MONITORING THE SITE DURING CLEANUP UNTIL ALL OF
THE HAZARDOUS MATERIAL HAS BEEN REMOVED. CONTRACTOR SHALL COOPERATE WITH IDEM
DURING AND AFTER THE SPILL TO INSURE ALL REQUIRED CLEANUP AND FILING REPORTS ARE
PROPERLY SUBMITTED.
THE DEVELOPER SHALL BE CONTINUALLY INFORMED OF ANY CONTAMINATION CONCERNS
OCCURRING ON THE SITE. THE CONSTRUCTION MANAGER SHALL KEEP ON SITE A LIST OF
QUALIFIED CONTRACTORS FOR SPILL REMEDIATION. ALL SITE PERSONNEL, INCLUDING
MAINTENANCE EMPLOYEES, SHALL BE MADE AWARE OF PROPER SPILL PREVENTION AND
REMEDIATION TECHNIQUES. ALL MATERIALS USED TO ABSORB SPILLS SHALL BE PROPERLY
DISPOSED OF IN AN APPROVED MANNER IN COMPLIANCE WITH LOCAL AND STATE LAWS. DO NOT
FLUSH SPILL MATERIALS WITH WATER UNLESS DIRECTED TO DO SO BY A GOVERNING AGENCY.
14. CONTACT INFORMATION FOR TRAINED INDIVIDUAL RESPONSIBLE FOR STORM WATER POLLUTION
PREVENTION FOR THE PROJECT SITE - SEE THIS SHEET FOR INFORMATION
15. CURRENT REVISION DATE ON ALL SHEETS - SEE TITLE BLOCK
SWPPP FOR POST CONSTRUCTION
1. DESCRIPTION OF POLLUTANTS AND THEIR SOURCES ASSOCIATED WITH THE PROPOSED LAND USE -
POTENTIAL POLLUTANTS FROM POST-CONSTRUCTION ACTIVITY SUCH AS SANDS AND SALTS FROM
SNOW REMOVAL; OIL, GREASE, ANTIFREEZE, ETC. FROM VEHICLES INCLUDING HEAVY METAL FROM
BRAKE PAD WEAR SHOULD BE PROPERLY ATTENDED TO TO REDUCE THE CONTAMINANTS FROM
ENTERING THE STORM SYSTEM. TRASH SHOULD BE CLEANED UP TO REDUCE CLOGGING OF STORM
SYSTEMS AND REDUCE POTENTIAL BACTERIA AND/OR OTHER BIOLOGICAL AGENTS FROM ENTERING
IN THE STORM SYSTEM. EXCESS FERTILIZERS AND HERBICIDES SHOULD BE AVOIDED. CLEAN UP
IMMEDIATELY IF ANY IS SPILLED.POST-CONSTRUCTION STORMWATER QUALITY MEASURES -
A. LOCATION - STRUCTURE 495 TO BE A 3' HYDRO INTERNATIONAL FIRST DEFENSE HIGH CAPACITY.
B. DIMENSIONS - SEE SHEETS C600, C601.
C. SIZING CALCULATIONS - SEE DRAINAGE REPORT
D. DETAILED SPECIFICATIONS - SEE SHEETS C600, C601.
E. CONSTRUCTION DETAILS - SEE SHEETS C600, C601.
2. SEQUENCE DESCRIBING STORMWATER QUALITY MEASURE IMPLEMENTATION-SEE CONSTRUCTION
SEQUENCE, INSTALL 3' HYDRO INTERNATIONAL FIRST DEFENSE HIGH CAPACITY AT TIME OF STORM
SEWER CONSTRUCTION.
3. STORMWATER QUALITY MEASURES TO BE IMPLEMENTED TO PREVENT OR MINIMIZE ADVERSE
IMPACTS TO STREAM OR RIPARIAN HABITATS - SEE STORMWATER POLLUTION PREVENTION PLAN,
SHEET C200 & C201. THE MAJORITY OF THE STORMWATER WILL BE CHANNELED THROUGH
ENCLOSED STORM PIPE INTO AN EXISTING DETENTION POND.
ROUTINE INSPECTIONS SHOULD OCCUR EVERY 6 MONTHS BY THE OWNER.
MAINTENANCE:
1. CHECK OIL & SEDIMENT DEPTH. THIS SHOULD OCCUR AFTER EVERY MAJOR RAIN EVENT.
-MAINTENANCE SHOULD OCCUR AT 15% OF TOTAL STORAGE FOR SEDIMENT OR 8" OF SEDIMENT
DEPTH.
-IF AN OIL SPILL OCCURS, MAINTAIN IMMEDIATELY. MAINTENANCE SHOULD OCCUR BY A
LICENSED LIQUID WASTE HAULER. NOTIFY LOCAL REGULATORY AGENCY AS REQUIRED ON SPILL
REPORTING CHART UPPER RIGHT OF THIS SHEET.
08/23/22
C202 SWPPP SpecsC202SWPPP SPECS & DETAILSW210497BCHW210497 xxxDAS----340 SANNER COURT, INDIANAPOLIS, IN 46290Reserve at Springmill10 9 abcd8 7 6 efgh10 9 8 7 6 REVISIONS AND ISSUES5 4 3 2 1
PROJECT NO.
SHEET NO.abcd5 4 3 2 CHECKED BY:DRAWN BY:DESIGNED BY:DWG NAME:PROJECT NO.:DATEBYeDATE:1
LOCATION: H:\2021\W210497\Engineering\design\conset\C202 SWPPP Specs.dwgLAYOUT: C203DATE/TIME: August 11, 2022 - 7:32amPLOTTED BY: HansenbfhgENGINEERS317 | 846 - 6611800 | 452 - 6408317 | 843 - 0546faxWEIHELand Surveying | Civil EngineeringLandscape ArchitectureALLAN H. WEIHE, P.E., L.S. - FOUNDER10505 N. College AvenueIndianapolis, Indiana 46280weihe.netBuild with confidence.S MPart of Section 11, Township 17 North, Range 3 East, Clay Township, Hamilton County, IndianaREVISED PER TAC COMMENTS05-13-2022 TPG/BCHREVISED PER TRICO COMMENTS05-19-2022 BCHREVISED PER TAC COMMENTS06-28-2022 TPG/BCHREVISED PER TAC COMMENTS08-10-2022 TPG/BCH
WOOD OR METAL
STAKES TO SECURE
THE STRAW BALES
(TWO PER BALE)
10' MIN.VARIES10 MIL. PLASTIC LINING
STRAW BALE (TYP)
SECTION LINE
STRAW BALE (TYP)
BINDING WIRE
WOOD OR METAL
STAKES (TYP) - 2 PER
BALENATIVE MATERIAL (OPTIONAL)
POLYETHYLENE LINING 10
MIL. EXTENDING OVER
BALES
(NO SCALE)TYPE "ABOVE GRADE
W/ STRAW BALES"4"WOOD OR METAL
STAKES TO SECURE
THE STRAW BALES
(TWO PER BALE)
POLYETHYLENE LINING 10
MIL. EXTENDING OVER
BALES
METAL PINS OR STAPLES
TO SECURE THE
POLYETHYLENE LINING TO
THE STRAW BALES
METAL PINS OR STAPLES
TO SECURE THE
POLYETHYLENE LINING
TO THE STRAW BALES
CONCRETE
WASHOUT
WOOD POST 3"x3"x8'
BLACK LETTER 6" HEIGHT
3/8" TREATED
PLYWOOD 48"x24"
PAINTED WHITE
0.5" LAG SCREWS
INSTALLATION
1. UTILIZE AND FOLLOW THE DESIGN IN THE STORM WATER POLLUTION PREVENTION
PLAN TO INSTALL THE SYSTEM.
2. DEPENDENT UPON THE TYPE OF SYSTEM, EITHER EXCAVATE THE PIT OR INSTALL
THE CONTAINMENT SYSTEM.
3. A BASE SHALL BE CONSTRUCTED AND PREPARED THAT IS FREE OF ROCKS AND
OTHER DEBRIS THAT MAY CAUSE TEARS OR PUNCTURES IN THE POLYETHYLENE
LINING.
4. INSTALL THE POLYETHYLENE LINING. FOR EXCAVATED SYSTEMS, THE LINING
SHOULD EXTEND OVER THE ENTIRE EXCAVATION. THE LINING FOR BERMED
SYSTEMS SHOULD BE INSTALLED OVER THE POOLING AREA WITH ENOUGH MATERIAL
TO EXTEND THE LINING OVER THE BERM OR CONTAINMENT SYSTEM. THE LINING
SHOULD BE SECURED WITH PINS, STAPLES, OR OTHER FASTENERS.
5. PLACE FLAGS, SAFETY FENCING, OR EQUIVALENT TO PROVIDE A BARRIER TO
CONSTRUCTION EQUIPMENT AND OTHER TRAFFIC.
6. PLACE A NON-COLLAPSING, NON-WATER HOLDING COVER OVER THE WASHOUT
FACILITY PRIOR TO A PREDICTED RAINFALL EVENT TO PREVENT ACCUMULATION OF
WATER AND POSSIBLE OVERFLOW OF THE SYSTEM (OPTIONAL).
7. INSTALL SIGNAGE THAT IDENTIFIES CONCRETE WASHOUT AREAS.
8. POST SIGNS DIRECTING CONTRACTORS AND SUPPLIERS TO DESIGNATED
LOCATIONS.
9. WHERE NECESSARY, PROVIDE STABLE INGRESS AND EGRESS (SEE TEMPORARY
CONSTRUCTION INGRESS/EGRESS PAD ON PAGE 17) OR ALTERNATIVE APPROACH
PAD FOR CONCRETE WASHOUT SYSTEMS.3'3'PLAN
1. ACTUAL LAYOUT DETERMINED IN
FIELD.
2. THE CONCRETE WASHOUT SIGN
SHALL BE INSTALLED WITHIN
30FT. OF THE TEMP. CONCRETE
WASHOUT FACILITY.
SECTION
CONCRETE WASHOUT
TEMPORARY CONSTRUCTION INGRESS/EGRESS PAD
150' (MIN.)
SWPPP INFORMATION SIGN
COPY
OF
NOI
COPY OF
IDEM
NOTICE OF
SUFFICIENCY
SWPPP INFORMATION
DETAILED DESCRIPTION OF THE LOCATION OF THE
SWPPP DOCUMENTATION (BINDER AND SITE MAPS)
ON THE SITE.
4' (MINIMUM)4' (MINIMUM)SIGN TO BE CONSTRUCTED OF A
RIGID MATERIAL, SUCH AS
PLYWOOD OR OUTDOOR SIGN
BOARD. SIGN MUST BE
CONSTRUCTED IN A MANNER TO
PROTECT DOCUMENTS FROM
DAMAGE DUE TO WEATHER (WIND,
SUN, MOISTURE, ETC.).
"SWPPP INFORMATION" MUST BE
DISPLAYED PROMINENTLY ACROSS
THE TOP OF THE SIGN, AS SHOWN IN
THE DETAIL.3" MIN.3" MIN.COPY
OF
DRAINAGE
APPROVAL
LETTER
COPY
OF
CONSTRUCTION
SITE
NOTICE AS
APPLICABLE
COPY
OF
CONSTRUCTION
SITE
NOTICE AS
APPLICABLE
COPY
OF
CONSTRUCTION
SITE
NOTICE AS
APPLICABLE
(NO SCALE)
SEDIMENTATION/SILT FENCE
MAXIMUM LOAD SLOPE AND DISTANCE FOR
WHICH A SILT FENCE IS APPLICABLE
INSTALLATION
PREFABRICATED SILT FENCE
1. LAY OUT THE LOCATION OF THE FENCE SO THAT IT IS PARALLEL TO THE CONTOUR OF THE SLOPE AND AT LEAST 10 FEET BEYOND THE TOE OF THE SLOPE TO PROVIDE A SEDIMENT
STORAGE AREA. TURN THE ENDS OF THE FENCE UP SLOPE SUCH THAT THE POINT OF CONTACT BETWEEN THE GROUND AND THE BOTTOM OF THE FENCE END TERMINATES AT A HIGHER
ELEVATION THAN THE TOP OF THE FENCE AT ITS LOWEST POINT.
2. EXCAVATE AN EIGHT-INCH DEEP BY FOUR-INCH WIDE TRENCH ALONG THE ENTIRE LENGTH OF THE FENCE LINE. INSTALLATION BY PLOWING IS ALSO ACCEPTABLE.
3. INSTALL THE SILT FENCE WITH THE FILTER FABRIC LOCATED ON THE UP-SLOPE SIDE OF THE EXCAVATED TRENCH AND THE SUPPORT POSTS ON THE DOWN-SLOPE SIDE OF THE TRENCH.
4. DRIVE THE SUPPORT POSTS AT LEAST 18 INCHES INTO THE GROUND, TIGHTLY STRETCHING THE FABRIC BETWEEN THE POSTS AS EACH IS DRIVEN INTO THE SOIL. MINIMUM OF 12 INCHES
OF THE FILTER FABRIC SHOULD EXTEND INTO THE TRENCH.
5. LAY THE LOWER FOUR INCHES OF FILTER FABRIC ON THE BOTTOM OF THE TRENCH AND EXTEND IT TOWARD THE UP-SLOPE SIDE OF THE TRENCH.
6. BACKFILL THE TRENCH WITH SOIL MATERIAL AND COMPACT IT IN PLACE.
NOTE: IF THE SILT FENCE IS BEING CONSTRUCTED ON-SITE, ATTACH THE FILTER FABRIC TO THE SUPPORT POSTS AND ATTACH WOODEN LATHE TO SECURE THE FABRIC TO THE POSTS.
ALLOW FOR AT LEAST 12 INCHES OF FABRIC BELOW GROUND LEVEL. COMPLETE THE SILT FENCE INSTALLATION, FOLLOWING STEPS 1 THROUGH 6 ABOVE.
MAINTENANCE
_ INSPECT WITHIN 24 HOURS OF A RAIN EVENT AND AT LEAST ONCE EVERY SEVEN CALENDAR DAYS.
_ IF FENCE FABRIC TEARS, STARTS TO DECOMPOSE, OR IN ANY WAY BECOMES INEFFECTIVE, REPLACE THE AFFECTED PORTION IMMEDIATELY. NOTE: ALL REPAIRS SHOULD MEET
SPECIFICATIONS AS OUTLINED WITHIN THIS MEASURE.
_ REMOVE DEPOSITED SEDIMENT WHEN IT IS CAUSING THE FILTER FABRIC TO BULGE OR WHEN IT REACHES ONE-HALF THE HEIGHT OF THE FENCE AT ITS LOWEST POINT. WHEN
CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE FENCE AND SEDIMENT DEPOSITS, GRADE THE SITE TO BLEND WITH THE SURROUNDING AREA, AND STABILIZE.
REFERENCE IN CHAPTER 7 PAGES 215-221 IN THE INDIANA STORM WATER QUALITY MANUAL
2-WOOD POST/STAKES WRAPPED
WITH SILT FENCE AND ROTATED AT
LEAST ONE FULL TURN TO SECURE
SILT FENCE END IN PLACE
SILT FENCE
SILT FENCE
POST
TO JOIN TO
ENDS OF TWO
FENCES.
EMBEDDED SILT FENCE MATERIAL MIN. 8"
INTO GROUND W/ 4" LAID ALONG BOTTOM OF
TRENCH. SOIL SLICING IN ACCORDANCE
WITH ASTM D 6462 8.2.2 IS ALSO
ACCEPTABLE.18" (MIN.)GEOTEXTILE FABRIC LAID ON
DOWN SLOPE SIDE AND
BOTTOM OF TRENCH
8"X4" TRENCH TO BE BACKFILLED
AND COMPACTED
WOVEN FILTER FABRIC SILT
FENCE MATERIAL COVER
POST 2"X2" WOOD OR 1.33
LBS/FOOT STEEL 6' MAX.
SPACING
EMBEDDED SILT FENCE MATERIAL MIN. 8"
INTO GROUND W/ 4" LAID ALONG BOTTOM OF
TRENCH. SOIL SLICING IN ACCORDANCE WITH
ASTM D 6462 8.2.2 IS ALSO ACCEPTABLE.18" (MIN.)GEOTEXTILE FABRIC LAID
ON DOWN SLOPE SIDE AND
BOTTOM OF TRENCH
POST 2"X2" WOOD OR 1.33 LBS/FOOT
STEEL 8' MAX. SPACING
WIRE FENCE 14 GUAGE (MIN)-6" MESH
REQ'D. IN SWALES OR AREAS OF
CONCENTRATED FLOW
NONWOVEN FILTER FABRIC -
SECURE TO POSTS WITH 2" LATH
2-WOOD POST/STAKES WRAPPED
WITH SILT FENCE AND ROTATED
AT LEAST TWO FULL TURNS TO
PROVIDE A SECURE CONNECTION
8"6"6"8"6"6"8"X4" TRENCH TO BE
BACKFILLED AND COMPACTED
POSTS: STEEL T OR U TYPE, OR 2"X2" HARD WOOD POST
FENCE: WOVEN WIRE, 14-1/2 GA., 6" MAX. MESH OPENING
FABRIC: IN ACCORDANCE WITH ASTM D 6461 LATEST EDITION.
LOAD SLOPE
LESS THAN 2%
2 TO 5%
5 TO 10%
10 TO 20%
MORE THAN 20%
MAX. DISTANCE ABOVE FENCE
100 FT.
75 FT.
50 FT.
25 FT.
15 FT.
WITHOUT WIRE SUPPORT WITH WIRE SUPPORT
(NO SCALE)
FLOW
FINISH GRADE
UNDISTURBED
GROUND
FLOW
FINISH GRADE
UNDISTURBED
GROUND
REPLACEABLE SEDIMENT BAGS
WITH GEOTEXTILE FILTER FABRIC
STAINLESS
STEEL
CLAMPING
BAND
STANDARD 2"
OVERFLOW
AREA 11 GAUGE STEEL SUSPENSION SYSTEM
LIFT HANDLESLIFT HANDLES
INSTALLATION:
1.
2.
REMOVE GRATE
DROP FLEXSTORM INLET FILTER ONTO
LOAD BEARING LIP OF CASTING OR
CONCRETE STRUCTURE
3. REPLACE GRATE
SHEET 1 OF 1
DRAWN
CHECKED
QA
MFG
APPROVED
DWG NOSIZE
SCALE
REV
ALL PRODUCTS MANUFACTURED
BY INLET & PIPE PROTECTION, INC
DISTRIBUTED BY ADS
WWW.INLETFILTERS.COM
(866) 287-8655 PH
(630) 355-3477 FX
INFO@INLETFILTERS.COM
IPP
TABLE 1. TEMPORARY SEEDING SPECIFICATIONS
SEED SPECIES 1 RATE PER ACRE PLANTING DEPTH OPTIMUM DATES2
_ I
TEMPORARY SEED
TABLE 1. TEMPORARY SEEDING SPECIFICATIONS
_
_
_
_
_
_
_
_
_
SEED MIXTURES RATE PER ACRE PURE LIVE SEED OPTIMUM SOIL PH
STEEP BANKS AND CUTS, LOW-MAINTENANCE AREAS (NOT MOWED)
LAWNS AND HIGH-MAINTENANCE AREAS
CHANNELS AND AREAS OF CONCENTRATED FLOW
PERMANENT SEED
OPEN LOW-MAINTENANCE AREAS (REMAINING IDLE MORE THAN SIX MONTHS)
SEED MIXTURES RATE PER ACRE PURE LIVE SEED OPTIMUM SOIL PH
SEED MIXTURES RATE PER ACRE PURE LIVE SEED OPTIMUM SOIL PH
SEED MIXTURES RATE PER ACRE PURE LIVE SEED OPTIMUM SOIL PH
SEASONAL SOIL PROTECTION CHART
PERMANENTSEEDING
SODDING
MULCHING
METHOD
STABILIZATION
SOIL
SEEDING
DORMANT
SEEDING
TEMPORARY
A = KENTUCKY BLUEGRASS* 40 LBS/ACRE; CREEPING RED FESCUE 40 LBS/ACRE;
PLUS 2 TONS STRAW MULCH/ACRE, OR ADD ANNUAL RYEGRASS 20 LBS/ACRE.
B = KENTUCKY BLUEGRASS* 60 LBS/ACRE; CREEPING RED FESCUE 60 LBS/ACRE;
PLUS 2 TONS STRAW MULCH/ACRE, OR ADD ANNUAL RYEGRASS 30 LBS/ACRE.
C = SPRING OATS 3 BUSHEL/ACRE.
D = WHEAT OR RYE 2 BUSHEL/ACRE.
E = ANNUAL RYEGRASS 40 LBS/ACRE.
F = SOD (BLEND 3 IMPROVED VARIETIES).
G = STRAW MULCH 2 TONS/ACRE.
*/I/* IRRIGATION NEEDED DURING JUNE, JULY, AND/OR SEPTEMBER.
** IRRIGATION NEEDED FOR 2 TO 3 WEEKS AFTER APPLYING SOD.
*KENTUCKY BLUEGRASS BLEND OF 3 IMPROVED VARIETIES.
08/23/22
LEGEND
= EXISTING STORM SEWER LINE
= SWALE
= EXISTING SANITARY SEWER LINE
= PROPOSED SANITARY SEWER LINE
= PROPOSED STORM SEWER LINE
= SANITARY SEWER MANHOLE
= STORM MANHOLE
= STORM INLET
= SOLID WALL UNDERDRAIN
SSD = SUBSURFACE DRAIN
U.E.
TOC
INV.
RCP
M.H.
STR.
D.&U.E.
M.E.
PROP.
TYP.
R.
EX.
S.S.E.
= FLOW DIRECTION
= EXISTING CONTOURS
= PROPOSED ELEVATION
= PROPOSED CONTOURS
= TOP OF CASTING
= INVERT
= REINFORCED CONCRETE PIPE
= MANHOLE
= STRUCTURE
= DRAINAGE AND UTILITY EASEMENT
= UTILITY EASEMENT
= SANITARY SEWER EASEMENT
= MATCH EXISTING GRADE
= TYPICAL
= PROPOSED
= EXISTING
= RADIUS
= PAD ELEV
(SEE EACH PAD FOR PAD SIZE)
= VARIABLE WIDTHV.W.
= BUILDING SETBACK LINE (B.S.L.)
= EASEMENT
ROW = RIGHT-OF-WAY
CL = CENTERLINE
PVC = POLYVINYL CHLORIDE PIPE
B-B = BACK TO BACK (CURB)
= SUBSURFACE DRAIN AND SUMP LINE
= MINIMUM FLOOD PROTECTION GRADEMFPG
= MINIMUM LOWEST ADJACENT GRADEMLAG
= FINISHED FLOOR ELEVATIONFFE
= EXISTING SUBSURFACE DRAIN
SANNER CO
U
R
T
MILLRIDGE DRIVE
LOT 72
LOT 67
LOT 66
LOT 63
LOT 62
LOT 61
LOT 60 LOT 59
LOT 58
LOT 57
LOT 56
LOT 55
LOT 54
W W W W
W W W W
W
W
W
80
79
78
7776
75
71
68
SANNER COURT
(PRIVATE STREET)SANSANSANSANSANSANSANKnow what'sbelow.
before you dig.Call
R
W
S
N
E
GENERAL GRADING NOTES
1. REFER TO THE INDIANA DEPARTMENT OF TRANSPORTATION (INDOT) STANDARD SPECIFICATIONS, LATEST EDITION, FOR
BASIC MATERIALS AND CONSTRUCTION METHODS.
2.FILL MATERIAL SHALL CONSIST OF SOIL OBTAINED FROM CUT AREAS, BORROW PITS OR OTHER APPROVED SOURCES. SOIL
SHALL BE FREE FROM ORGANIC MATTER, LARGE ROCKS AND OTHER DELETERIOUS SUBSTANCES. THE FILL MATERIAL SHALL
BE PLACED IN LAYERS NOT TO EXCEED SIX INCHES FOLLOWING COMPACTION, PROPER MOISTURE CONTENT OF FILL
MATERIAL WILL BE SUCH TO ACHIEVE SPECIFIED COMPACTION DENSITY. ALL FILL BENEATH PAVED AREAS, FLOOR SLABS
AND FUTURE BUILDINGS SHALL BE COMPACTED TO AT LEAST 95% OF THE MAXIMUM DRY DENSITY PER ASTM D-1557. FIELD
COMPACTION TESTS SHALL BE RUN ON EACH LIFT, IN FILL SECTIONS. THE REQUIRED COMPACTION ON EACH LIFT SHALL BE
IN ACCORDANCE WITH INDOT SECTION 211.
3.MAXIMUM LAWN SLOPE IS 3:1.
4.THE CONTRACTOR SHALL CONTACT ALL UTILITY COMPANIES TO LOCATE MAINS, CONDUITS, SERVICE LINES AND OTHER
FACILITIES IN THE AFFECTED CONSTRUCTION AREA. EXISTING UTILITY STRUCTURES ARE SHOWN HERE IN ACCORDANCE
WITH AVAILABLE INFORMATION. THE LOCATION AND PROTECTION OF UTILITY STRUCTURES, THEIR SUPPORT AND
MAINTENANCE DURING CONSTRUCTION (IN COOPERATION WITH APPLICABLE UTILITY COMPANY) IS THE EXPRESS
RESPONSIBILITY OF THE CONTRACTOR.
5.ALL SPOT ELEVATIONS ARE TO FINISHED GRADE.
6.COMPACTED "B" BORROW BACK FILL REQ'D. OVER ALL UTILITIES IN PAVED AREAS.
7.ALL GRADES AT BOUNDARY SHALL MEET EXISTING.
8.ANY PART OF SANITARY / STORM SEWER AND WATER MAIN TRENCHES RUNNING UNDER OR WITHIN 5' OF PAVEMENT TO BE
BACKFILLED WITH GRANULAR MATERIAL.
9.ALL CONSTRUCTION ON THIS SITE TO BE PERFORMED IN COMPLIANCE WITH O.S.H.A. STANDARDS FOR WORKER SAFETY.
10.THE CONTRACTOR SHALL CONFIRM ALL EARTHWORK QUANTITIES PRIOR TO THE START OF CONSTRUCTION. IF AN EXCESS
OR SHORTAGE OF SOIL IS ENCOUNTERED, THE CONTRACTOR SHALL CONFIRM WITH THE OWNER AND ENGINEER THE
REQUIREMENTS FOR STOCKPILING, REMOVING OR IMPORTING OF SOIL.
11.PROVIDE POSITIVE DRAINAGE WITHOUT PONDING IN ALL AREAS. CONTRACTOR TO TEST FOR AND CORRECT ANY PONDING
CONDITIONS.
12.CONTRACTOR TO INSTALL CONCRETE CRADLES WHEN THE VERTICAL SEPARATION (AS MEASURED FROM THE EXTERIOR OF
THE PIPES) BETWEEN SANITARY SEWER FACILITIES, WATER MAIN, AND STORM SEWERS IS 18" OR LESS.
13.GRANULAR BACKFILL TO BE USED FOR ALL UTILITY AND SEWER - STREET CROSSINGS.
14.ALL PROPOSED CURB TO BE ROLL CURB UNLESS NOTED OTHERWISE.
15.ALL 6" SSD TO BE DOUBLE WALL, GASKETED SMOOTH BORE, DRAIN TILE.
16.THE SITE DOES NOT LIE IN A SPECIAL FLOOD HAZARD AREA AS ESTABLISHED BY THE FEDERAL EMERGENCY MANAGEMENT
AGENCY - NATIONAL FLOOD INSURANCE PROGRAM, WHEN PLOTTED BY SCALE ON FLOOD INSURANCE RATE MAP
#18057C0208G, DATED NOVEMBER 19, 2014.
17.PROPOSED STORM SEWERS TO BE OWNED BY HAMILTON COUNTY.
18.MINIMUM FLOOD PROTECTION GRADE (MFPG) OF ALL STRUCTURES FRONTING A POND OR OPEN DITCH SHALL BE NO LESS
THAN 2 FEET ABOVE ANY ADJACENT 100-YEAR LOCAL OR REGIONAL FLOOD ELEVATIONS, WHICHEVER IS GREATER, FOR ALL
WINDOWS, DOORS, PIPE ENTRANCES, WINDOW WELLS, AND ANY OTHER STRUCTURE MEMBER WHERE FLOODWATERS CAN
ENTER A BUILDING.C300 Development PlanC300DEVELOPMENT PLANW210497BCHW210497 01-13-2022DASJRV10 9 abcd8 7 6 efgh10 9 8 7 6 REVISIONS AND ISSUES5 4 3 2 1
PROJECT NO.
SHEET NO.abcd5 4 3 2 CHECKED BY:DRAWN BY:DESIGNED BY:DWG NAME:PROJECT NO.:DATEBYeDATE:1
LOCATION: H:\2021\W210497\Engineering\design\conset\C300 Development Plan.dwgLAYOUT: C300DATE/TIME: August 11, 2022 - 7:32amPLOTTED BY: HansenbfhgENGINEERS317 | 846 - 6611800 | 452 - 6408317 | 843 - 0546faxWEIHELand Surveying | Civil EngineeringLandscape ArchitectureALLAN H. WEIHE, P.E., L.S. - FOUNDER10505 N. College AvenueIndianapolis, Indiana 46280weihe.netBuild with confidence.S MPart of Section 11, Township 17 North, Range 3 East, Clay Township, Hamilton County, IndianaREVISED PER TAC COMMENTS05-13-2022 TPG/BCHREVISED PER TRICO COMMENTS05-19-2022 BCHREVISED PER TAC COMMENTS06-28-2022 TPG/BCHREVISED PER TAC COMMENTS08-10-2022 TPG/BCH
SITE TBM
TBM#1
SET ON THE EAST BOLT ON A FIRE HYDRANT AT THE
BEGINNING OF THE CUL-DA-SAC ON THE NORTH SIDE OF
SANNER COURT.
ELEV. 841.80 (NAVD 88)
TBM#2
SET ON THE RIM OF A SANITARY MANHOLE AT THE END OF
THE CUL-DA-SAC OF SANNER COURT.
ELEV. 842.89 (NAVD 88)340 SANNER COURT, INDIANAPOLIS, IN 46290THE RESERVE AT SPRINGMILL, SECTION 2,REPLAT OF LOTS 68, 69C, 70C, & 71NOTES: THE DETENTION FOR THE SITE IS PROVIDED
BY ONE EXISTING WET POND. ONLY A PORTION OF
THE POND WATERSHED IS BEING ALTERED AND THE
PROPOSED CHANGES HAVE BEEN DESIGNED SUCH
THAT THE EXISTING POND PROVIDES DETENTION
PER THE APPROVED MASTER PLAN. THE POND
DISCHARGES INTO WILLIAMS CREEK.
DRAINAGE SUMMARY
PEAK DISCHARGE (CFS) INTO EXISTING POND
RETURN PERIOD
10-YR.
100-YR.
N/A 6.93
ALLOWABLE PROPOSED
OVERALL SITE ACREAGE
POND WATERSHED ACREAGE
DETENTION VOLUME REQUIRED
DETENTION VOLUME PROVIDED
3.49 ACRES
13.90 ACRES
PROVIDED IN EX POND
PROVIDED IN EX POND
N/A 15.62
8.22
EXISTING
17.10
08/23/22
LEGEND
= EXISTING STORM SEWER LINE
= SWALE
= EXISTING SANITARY SEWER LINE
= PROPOSED SANITARY SEWER LINE
= PROPOSED STORM SEWER LINE
= SANITARY SEWER MANHOLE
= STORM MANHOLE
= STORM INLET
= SOLID WALL UNDERDRAIN
SSD = SUBSURFACE DRAIN
U.E.
TOC
INV.
RCP
M.H.
STR.
D.&U.E.
M.E.
PROP.
TYP.
R.
EX.
S.S.E.
= FLOW DIRECTION
= EXISTING CONTOURS
= PROPOSED ELEVATION
= PROPOSED CONTOURS
= TOP OF CASTING
= INVERT
= REINFORCED CONCRETE PIPE
= MANHOLE
= STRUCTURE
= DRAINAGE AND UTILITY EASEMENT
= UTILITY EASEMENT
= SANITARY SEWER EASEMENT
= MATCH EXISTING GRADE
= TYPICAL
= PROPOSED
= EXISTING
= RADIUS
= PAD ELEV
(SEE EACH PAD FOR PAD SIZE)
= VARIABLE WIDTHV.W.
= BUILDING SETBACK LINE (B.S.L.)
= EASEMENT
ROW = RIGHT-OF-WAY
CL = CENTERLINE
PVC = POLYVINYL CHLORIDE PIPE
B-B = BACK TO BACK (CURB)
= SUBSURFACE DRAIN AND SUMP LINE
= MINIMUM FLOOD PROTECTION GRADEMFPG
= MINIMUM LOWEST ADJACENT GRADEMLAG
= FINISHED FLOOR ELEVATIONFFE
= EXISTING SUBSURFACE DRAIN
SANNER CO
U
R
T
MILLRIDGE DRIVE
LOT 72
LOT 67
LOT 66
LOT 63
LOT 62
LOT 61
LOT 60 LOT 59
LOT 58
LOT 57
LOT 56
LOT 55
LOT 54
W W W W
W W W W
W
W
W
80
79
78
7776
75
71
68
SANNER COURT
(PRIVATE STREET)
Know what'sbelow.
before you dig.Call
R
W
S
N
E
GENERAL GRADING NOTES
1. REFER TO THE INDIANA DEPARTMENT OF TRANSPORTATION (INDOT) STANDARD SPECIFICATIONS, LATEST EDITION, FOR
BASIC MATERIALS AND CONSTRUCTION METHODS.
2.FILL MATERIAL SHALL CONSIST OF SOIL OBTAINED FROM CUT AREAS, BORROW PITS OR OTHER APPROVED SOURCES. SOIL
SHALL BE FREE FROM ORGANIC MATTER, LARGE ROCKS AND OTHER DELETERIOUS SUBSTANCES. THE FILL MATERIAL SHALL
BE PLACED IN LAYERS NOT TO EXCEED SIX INCHES FOLLOWING COMPACTION, PROPER MOISTURE CONTENT OF FILL
MATERIAL WILL BE SUCH TO ACHIEVE SPECIFIED COMPACTION DENSITY. ALL FILL BENEATH PAVED AREAS, FLOOR SLABS
AND FUTURE BUILDINGS SHALL BE COMPACTED TO AT LEAST 95% OF THE MAXIMUM DRY DENSITY PER ASTM D-1557. FIELD
COMPACTION TESTS SHALL BE RUN ON EACH LIFT, IN FILL SECTIONS. THE REQUIRED COMPACTION ON EACH LIFT SHALL BE
IN ACCORDANCE WITH INDOT SECTION 211.
3.MAXIMUM LAWN SLOPE IS 3:1.
4.THE CONTRACTOR SHALL CONTACT ALL UTILITY COMPANIES TO LOCATE MAINS, CONDUITS, SERVICE LINES AND OTHER
FACILITIES IN THE AFFECTED CONSTRUCTION AREA. EXISTING UTILITY STRUCTURES ARE SHOWN HERE IN ACCORDANCE
WITH AVAILABLE INFORMATION. THE LOCATION AND PROTECTION OF UTILITY STRUCTURES, THEIR SUPPORT AND
MAINTENANCE DURING CONSTRUCTION (IN COOPERATION WITH APPLICABLE UTILITY COMPANY) IS THE EXPRESS
RESPONSIBILITY OF THE CONTRACTOR.
5.ALL SPOT ELEVATIONS ARE TO FINISHED GRADE.
6.COMPACTED "B" BORROW BACK FILL REQ'D. OVER ALL UTILITIES IN PAVED AREAS.
7.ALL GRADES AT BOUNDARY SHALL MEET EXISTING.
8.ANY PART OF SANITARY / STORM SEWER AND WATER MAIN TRENCHES RUNNING UNDER OR WITHIN 5' OF PAVEMENT TO BE
BACKFILLED WITH GRANULAR MATERIAL.
9.ALL CONSTRUCTION ON THIS SITE TO BE PERFORMED IN COMPLIANCE WITH O.S.H.A. STANDARDS FOR WORKER SAFETY.
10.THE CONTRACTOR SHALL CONFIRM ALL EARTHWORK QUANTITIES PRIOR TO THE START OF CONSTRUCTION. IF AN EXCESS
OR SHORTAGE OF SOIL IS ENCOUNTERED, THE CONTRACTOR SHALL CONFIRM WITH THE OWNER AND ENGINEER THE
REQUIREMENTS FOR STOCKPILING, REMOVING OR IMPORTING OF SOIL.
11.PROVIDE POSITIVE DRAINAGE WITHOUT PONDING IN ALL AREAS. CONTRACTOR TO TEST FOR AND CORRECT ANY PONDING
CONDITIONS.
12.CONTRACTOR TO INSTALL CONCRETE CRADLES WHEN THE VERTICAL SEPARATION (AS MEASURED FROM THE EXTERIOR OF
THE PIPES) BETWEEN SANITARY SEWER FACILITIES, WATER MAIN, AND STORM SEWERS IS 18" OR LESS.
13.GRANULAR BACKFILL TO BE USED FOR ALL UTILITY AND SEWER - STREET CROSSINGS.
14.ALL PROPOSED CURB TO BE ROLL CURB UNLESS NOTED OTHERWISE.
15.ALL 6" SSD TO BE DOUBLE WALL, GASKETED SMOOTH BORE, DRAIN TILE.
EMERGENCY OVERFLOW=
LEGEND:C301 EFRPC301EMERGENCY FLOOD ROUTE PLANW210497BCHW210497 xxxDAS----10 9 abcd8 7 6 efgh10 9 8 7 6 REVISIONS AND ISSUES5 4 3 2 1
PROJECT NO.
SHEET NO.abcd5 4 3 2 CHECKED BY:DRAWN BY:DESIGNED BY:DWG NAME:PROJECT NO.:DATEBYeDATE:1
LOCATION: H:\2021\W210497\Engineering\design\conset\C301 EFRP.dwgLAYOUT: C301DATE/TIME: August 11, 2022 - 7:33amPLOTTED BY: HansenbfhgENGINEERS317 | 846 - 6611800 | 452 - 6408317 | 843 - 0546faxWEIHELand Surveying | Civil EngineeringLandscape ArchitectureALLAN H. WEIHE, P.E., L.S. - FOUNDER10505 N. College AvenueIndianapolis, Indiana 46280weihe.netBuild with confidence.S MPart of Section 11, Township 17 North, Range 3 East, Clay Township, Hamilton County, IndianaREVISED PER TAC COMMENTS05-13-2022 TPG/BCHREVISED PER TRICO COMMENTS05-19-2022 BCHREVISED PER TAC COMMENTS06-28-2022 TPG/BCHREVISED PER TAC COMMENTS08-10-2022 TPG/BCH
SITE TBM
TBM#1
SET ON THE EAST BOLT ON A FIRE HYDRANT AT THE
BEGINNING OF THE CUL-DA-SAC ON THE NORTH SIDE OF
SANNER COURT.
ELEV. 841.80 (NAVD 88)
TBM#2
SET ON THE RIM OF A SANITARY MANHOLE AT THE END OF
THE CUL-DA-SAC OF SANNER COURT.
ELEV. 842.89 (NAVD 88)340 SANNER COURT, INDIANAPOLIS, IN 46290THE RESERVE AT SPRINGMILL, SECTION 2,REPLAT OF LOTS 68, 69C, 70C, & 7108/23/22
SANNER CO
U
R
T
LOT 73
LOT 72
LOT 67
W W W W W W W W
W
W
W
80 78
7776
75
71
68
SANNER COURT
(PRIVATE STREET)
LEGEND
= EXISTING STORM SEWER LINE
= SWALE
= EXISTING SANITARY SEWER LINE
= PROPOSED SANITARY SEWER LINE
= PROPOSED STORM SEWER LINE
= SANITARY SEWER MANHOLE
= STORM MANHOLE
= STORM INLET
= SOLID WALL UNDERDRAIN
SSD = SUBSURFACE DRAIN
U.E.
TOC
INV.
RCP
M.H.
STR.
D.&U.E.
M.E.
PROP.
TYP.
R.
EX.
S.S.E.
= TOP OF CASTING
= INVERT
= REINFORCED CONCRETE PIPE
= MANHOLE
= STRUCTURE
= DRAINAGE AND UTILITY EASEMENT
= UTILITY EASEMENT
= SANITARY SEWER EASEMENT
= MATCH EXISTING GRADE
= TYPICAL
= PROPOSED
= EXISTING
= RADIUS
= VARIABLE WIDTHV.W.
= BUILDING SETBACK LINE (B.S.L.)
= EASEMENT
ROW = RIGHT-OF-WAY
CL = CENTERLINE
PVC = POLYVINYL CHLORIDE PIPE
B-B = BACK TO BACK (CURB)
= SUBSURFACE DRAIN AND SUMP LINE
= EXISTING SUBSURFACE DRAIN
(LOCAL SECTION)
Sanner Court
820
825
830
835
840
845
850
855
820
825
830
835
840
845
850
855
-1+00-0+75-0+50-0+250+000+250+500+751+001+251+501+752+002+252+502+753+003+253+503+754+004+254+50FINISHED GRADE
EXISTING GRADE
PROFILE LEGEND
PROP. GRADE ELEV.
EXIST. GRADE ELEV.
Know what'sbelow.
before you dig.Call
R
W
S
N
E
NOTES
1. STANDARD SPECIFICATIONS BY THE LOCAL
HIGHWAY DEPARTMENT, LATEST EDITION,
SHALL APPLY TO THIS PROJECT FOR ALL
STREET IMPROVEMENTS.
2. ALL STREETS TO BE 26' IN WIDTH
(MEASURED FROM B-B OF CURB) UNLESS
OTHERWISE NOTED.
3. INGRESS & EGRESS EASEMENT TO BE 50'
IN WIDTH.
4. TEMPORARY TRAFFIC CONTROL DURING
CONSTRUCTION TO CONFORM TO
APPLICABLE LOCAL AND STATE
STANDARDS.
5. ALL CONSTRUCTION ACTIVITY ON THIS
SITE TO BE PERFORMED IN COMPLIANCE
WITH APPLICABLE O.S.H.A. STANDARDS
FOR WORKER SAFETY.
6. IT SHALL BE THE CONTRACTOR'S
RESPONSIBILITY TO FIELD VERIFY ALL
UTILITY LOCATIONS BEFORE
CONSTRUCTION BEGINS.
7. SEE SECONDARY PLAT FOR STREET
CENTERLINE GEOMETRY, EASEMENT
LOCATIONS AND DESIGNATIONS.C400 Street PnPC400STREET PLAN & PROFILEW210497BCHW210497 01-13-2022DASJRV10 9 abcd8 7 6 efgh10 9 8 7 6 REVISIONS AND ISSUES5 4 3 2 1
PROJECT NO.
SHEET NO.abcd5 4 3 2 CHECKED BY:DRAWN BY:DESIGNED BY:DWG NAME:PROJECT NO.:DATEBYeDATE:1
LOCATION: H:\2021\W210497\Engineering\design\conset\C400 Street PnP.dwgLAYOUT: C400DATE/TIME: August 11, 2022 - 7:52amPLOTTED BY: HansenbfhgENGINEERS317 | 846 - 6611800 | 452 - 6408317 | 843 - 0546faxWEIHELand Surveying | Civil EngineeringLandscape ArchitectureALLAN H. WEIHE, P.E., L.S. - FOUNDER10505 N. College AvenueIndianapolis, Indiana 46280weihe.netB uild with conf idence.S MPart of Section 11, Township 17 North, Range3 East, Clay Township, Hamilton County, IndianaREVISED PER TAC COMMENTS05-13-2022TPG/BCHREVISED PER TRICO COMMENTS05-19-2022BCHREVISED PER TAC COMMENTS06-28-2022TPG/BCHREVISED PER TAC COMMENTS08-10-2022TPG/BCHSITE TBM
TBM#1
SET ON THE EAST BOLT ON A FIRE HYDRANT AT THE
BEGINNING OF THE CUL-DA-SAC ON THE NORTH SIDE OF
SANNER COURT.
ELEV. 841.80 (NAVD 88)
TBM#2
SET ON THE RIM OF A SANITARY MANHOLE AT THE END OF
THE CUL-DA-SAC OF SANNER COURT.
ELEV. 842.89 (NAVD 88)340 SANNER COURT, INDIANAPOLIS, IN 46290THE RESERVE AT SPRINGMILL, SECTION 2,REPLAT OF LOTS 68, 69C, 70C, & 7108/23/22
LEGEND
= EXISTING STORM SEWER LINE
= SWALE
= EXISTING SANITARY SEWER LINE
= PROPOSED SANITARY SEWER LINE
= PROPOSED STORM SEWER LINE
= SANITARY SEWER MANHOLE
= STORM MANHOLE
= STORM INLET
= SOLID WALL UNDERDRAIN
SSD = SUBSURFACE DRAIN
U.E.
TOC
INV.
RCP
M.H.
STR.
D.&U.E.
M.E.
PROP.
TYP.
R.
EX.
S.S.E.
= TOP OF CASTING
= INVERT
= REINFORCED CONCRETE PIPE
= MANHOLE
= STRUCTURE
= DRAINAGE AND UTILITY EASEMENT
= UTILITY EASEMENT
= SANITARY SEWER EASEMENT
= MATCH EXISTING GRADE
= TYPICAL
= PROPOSED
= EXISTING
= RADIUS
= VARIABLE WIDTHV.W.
= BUILDING SETBACK LINE (B.S.L.)
= EASEMENT
ROW = RIGHT-OF-WAY
CL = CENTERLINE
PVC = POLYVINYL CHLORIDE PIPE
B-B = BACK TO BACK (CURB)
= SUBSURFACE DRAIN AND SUMP LINE
= EXISTING SUBSURFACE DRAIN
W W W W
W
W
W
W
W
77
SANNER COURT
(PRIVATE STREET)
Know what'sbelow.
before you dig.Call
R
W
S
N
E
CUL-DE-SAC DETAIL
SANNER COURT C401 Cul-De-Sac DetailC401CUL-DE-SAC DETAILW210497BCHW210497 01-13-2022DASJRV10 9 abcd8 7 6 efgh10 9 8 7 6 REVISIONS AND ISSUES5 4 3 2 1
PROJECT NO.
SHEET NO.abcd5 4 3 2 CHECKED BY:DRAWN BY:DESIGNED BY:DWG NAME:PROJECT NO.:DATEBYeDATE:1
LOCATION: C:\Users\hansenb\appdata\local\temp\AcPublish_32036\C401 Cul-De-Sac Detail.dwgLAYOUT: C401DATE/TIME: August 11, 2022 - 7:55amPLOTTED BY: HansenbfhgENGINEERS317 | 846 - 6611800 | 452 - 6408317 | 843 - 0546faxWEIHELand Surveying | Civil EngineeringLandscape ArchitectureALLAN H. WEIHE, P.E., L.S. - FOUNDER10505 N. College AvenueIndianapolis, Indiana 46280weihe.netBuild with confidence.S MPart of Section 11, Township 17 North, Range 3 East, Clay Township, Hamilton County, IndianaREVISED PER TAC COMMENTS05-13-2022 TPG/BCHREVISED PER TRICO COMMENTS05-19-2022 BCHREVISED PER TAC COMMENTS06-28-2022 TPG/BCHREVISED PER TAC COMMENTS08-10-2022 TPG/BCH
SITE TBM
TBM#1
SET ON THE EAST BOLT ON A FIRE HYDRANT AT THE
BEGINNING OF THE CUL-DA-SAC ON THE NORTH SIDE OF
SANNER COURT.
ELEV. 841.80 (NAVD 88)
TBM#2
SET ON THE RIM OF A SANITARY MANHOLE AT THE END OF
THE CUL-DA-SAC OF SANNER COURT.
ELEV. 842.89 (NAVD 88)
NOTES
1. STANDARD SPECIFICATIONS BY THE LOCAL
HIGHWAY DEPARTMENT, LATEST EDITION,
SHALL APPLY TO THIS PROJECT FOR ALL
STREET IMPROVEMENTS.
2. ALL STREETS TO BE 26' IN WIDTH
(MEASURED FROM B-B OF CURB) UNLESS
OTHERWISE NOTED.
3. INGRESS & EGRESS EASEMENT TO BE 50'
IN WIDTH.
4. TEMPORARY TRAFFIC CONTROL DURING
CONSTRUCTION TO CONFORM TO
APPLICABLE LOCAL AND STATE
STANDARDS.
5. ALL CONSTRUCTION ACTIVITY ON THIS
SITE TO BE PERFORMED IN COMPLIANCE
WITH APPLICABLE O.S.H.A. STANDARDS
FOR WORKER SAFETY.
6. IT SHALL BE THE CONTRACTOR'S
RESPONSIBILITY TO FIELD VERIFY ALL
UTILITY LOCATIONS BEFORE
CONSTRUCTION BEGINS.
7. SEE SECONDARY PLAT FOR STREET
CENTERLINE GEOMETRY, EASEMENT
LOCATIONS AND DESIGNATIONS.340 SANNER COURT, INDIANAPOLIS, IN 46290THE RESERVE AT SPRINGMILL, SECTION 2,REPLAT OF LOTS 68, 69C, 70C, & 7108/23/22
LEGEND
= EXISTING STORM SEWER LINE
= SWALE
= EXISTING SANITARY SEWER LINE
= PROPOSED SANITARY SEWER LINE
= PROPOSED STORM SEWER LINE
= SANITARY SEWER MANHOLE
= STORM MANHOLE
= STORM INLET
= SOLID WALL UNDERDRAIN
SSD = SUBSURFACE DRAIN
TOC
R.
= TOP OF CASTING
= RADIUS
= BUILDING SETBACK LINE (B.S.L.)
= EASEMENT
ROW = RIGHT-OF-WAY
B-B = BACK TO BACK (CURB)
= SUBSURFACE DRAIN AND SUMP LINE
= EXISTING SUBSURFACE DRAIN
SANNER CO
U
R
T
MILLRIDGE DRIVE
80
79
78
7776
75
71
68
SANNER COURT
(PRIVATE STREET)
Know what'sbelow.
before you dig.Call
R
W
S
N
E C402 Sign & SSD PlanC402SIGNAGE & SSD PLANW210497BCHW210497 xxxDAS----10 9 abcd8 7 6 efgh10 9 8 7 6 REVISIONS AND ISSUES5 4 3 2 1
PROJECT NO.
SHEET NO.abcd5 4 3 2 CHECKED BY:DRAWN BY:DESIGNED BY:DWG NAME:PROJECT NO.:DATEBYeDATE:1
LOCATION: H:\2021\W210497\Engineering\design\conset\C402 Sign & SSD Plan.dwgLAYOUT: C402DATE/TIME: August 11, 2022 - 7:55amPLOTTED BY: HansenbfhgENGINEERS317 | 846 - 6611800 | 452 - 6408317 | 843 - 0546faxWEIHELand Surveying | Civil EngineeringLandscape ArchitectureALLAN H. WEIHE, P.E., L.S. - FOUNDER10505 N. College AvenueIndianapolis, Indiana 46280weihe.netBuild with confidence.S MPart of Section 11, Township 17 North, Range 3 East, Clay Township, Hamilton County, IndianaREVISED PER TAC COMMENTS05-13-2022 TPG/BCHREVISED PER TRICO COMMENTS05-19-2022 BCHREVISED PER TAC COMMENTS06-28-2022 TPG/BCHREVISED PER TAC COMMENTS08-10-2022 TPG/BCH
SITE TBM
TBM#1
SET ON THE EAST BOLT ON A FIRE HYDRANT AT THE
BEGINNING OF THE CUL-DA-SAC ON THE NORTH SIDE OF
SANNER COURT.
ELEV. 841.80 (NAVD 88)
TBM#2
SET ON THE RIM OF A SANITARY MANHOLE AT THE END OF
THE CUL-DA-SAC OF SANNER COURT.
ELEV. 842.89 (NAVD 88)340 SANNER COURT, INDIANAPOLIS, IN 46290THE RESERVE AT SPRINGMILL, SECTION 2,REPLAT OF LOTS 68, 69C, 70C, & 7108/23/22
Know what'sbelow.
before you dig.Call
R C403 Street DetailsC403STREET DETAILSW210497BCHW210497 01-13-2022DASJRV10 9 abcd8 7 6 efgh10 9 8 7 6 REVISIONS AND ISSUES5 4 3 2 1
PROJECT NO.
SHEET NO.abcd5 4 3 2 CHECKED BY:DRAWN BY:DESIGNED BY:DWG NAME:PROJECT NO.:DATEBYeDATE:1
LOCATION: H:\2021\W210497\Engineering\design\conset\C403 Street Details.dwgLAYOUT: C403DATE/TIME: August 11, 2022 - 7:55amPLOTTED BY: HansenbfhgENGINEERS317 | 846 - 6611800 | 452 - 6408317 | 843 - 0546faxWEIHELand Surveying | Civil EngineeringLandscape ArchitectureALLAN H. WEIHE, P.E., L.S. - FOUNDER10505 N. College AvenueIndianapolis, Indiana 46280weihe.netBuild with confidence.S MPart of Section 11, Township 17 North, Range 3 East, Clay Township, Hamilton County, IndianaREVISED PER TAC COMMENTS05-13-2022 TPG/BCHREVISED PER TRICO COMMENTS05-19-2022 BCHREVISED PER TAC COMMENTS06-28-2022 TPG/BCHREVISED PER TAC COMMENTS08-10-2022 TPG/BCH340 SANNER COURT, INDIANAPOLIS, IN 46290THE RESERVE AT SPRINGMILL, SECTION 2,REPLAT OF LOTS 68, 69C, 70C, & 7108/23/22
LEGEND
= EXISTING STORM SEWER LINE
= SWALE
= EXISTING SANITARY SEWER LINE
= PROPOSED SANITARY SEWER LINE
= PROPOSED STORM SEWER LINE
= SANITARY SEWER MANHOLE
= STORM MANHOLE
= STORM INLET
= SOLID WALL UNDERDRAIN
SSD = SUBSURFACE DRAIN
U.E.
TOC
INV.
RCP
M.H.
STR.
D.&U.E.
M.E.
PROP.
TYP.
R.
EX.
S.S.E.
= TOP OF CASTING
= INVERT
= REINFORCED CONCRETE PIPE
= MANHOLE
= STRUCTURE
= DRAINAGE AND UTILITY EASEMENT
= UTILITY EASEMENT
= SANITARY SEWER EASEMENT
= MATCH EXISTING GRADE
= TYPICAL
= PROPOSED
= EXISTING
= RADIUS
= VARIABLE WIDTHV.W.
= BUILDING SETBACK LINE (B.S.L.)
= EASEMENT
ROW = RIGHT-OF-WAY
CL = CENTERLINE
PVC = POLYVINYL CHLORIDE PIPE
B-B = BACK TO BACK (CURB)
= SUBSURFACE DRAIN AND SUMP LINE
= EXISTING SUBSURFACE DRAIN
W W
W W W W W
W
W
W
80
79
78
7776
75
71
68
SANNER COURT
(PRIVATE STREET)SANSANSANSANSANSANSAN825
830
835
840
845
850
855
825
830
835
840
845
850
855
FINISHED GRADE
EXISTING GRADE
PROFILE LEGEND
CONTRACTOR MUST
VERIFY INVERT
INFORMATION PRIOR
TO BEGINNING
CONSTRUCTION. IF A
DISCREPANCY EXISTS,
CONTACT THE
ENGINEER
IMMEDIATELY.
SANITARY SEWER STRUCTURE DATA TABLE
STRUCTURE
NUMBER
RS-301
STRUCTURE
TYPE
48'' DIA. MANHOLE
TOP OF
CASTING
844.52
CASTING TYPE
R-1772
INVERT
INV OUT = 837.00(W)
SANITARY SEWER PIPE DATA TABLE
UPSTREAM
STRUCTURE
RS-301
DOWNSTREAM
STRUCTURE
RS-204
SIZE
8"
MATERIAL
PVC
LENGTH
202'
SLOPE
1.00%
Know what'sbelow.
before you dig.Call
R
SANITARY SEWER NOTES
1. THE CONTRACTOR SHALL CONTACT APPLICABLE UNDERGROUND-PLANT PROTECTION/LOCATION SERVICE AT LEAST
72 HOURS PRIOR TO ANY WORK.
2. THE CONTRACTOR SHALL CONTACT THE OWNER AND/OR ENGINEER IF UTILITIES APPEAR TO BE IN CONFLICT WITH
THE PROPOSED IMPROVEMENTS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL
EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS.
3. THE PLANS SHOW THE LOCATION OF ALL KNOWN UTILITIES LOCATED WITHIN THE LIMITS OF CONSTRUCTION
ACCORDING TO INFORMATION PROVIDED BY THE VARIOUS UTILITY COMPANIES, PREVIOUS CONSTRUCTION PLANS
AND AS EVIDENCED BY OBSERVATION OF ABOVE GROUND CONDITIONS BY THE SURVEYOR. THE ACCURACY OF
THIS INFORMATION IS NOT GUARANTEED.
4. THE LOCATION AND PROTECTION OF UTILITY STRUCTURES, THEIR SUPPORT AND MAINTENANCE DURING
CONSTRUCTION IS THE EXPRESS RESPONSIBILITY OF THE CONTRACTOR.
5. THE CONTRACTOR SHALL CONTACT ALL APPLICABLE UTILITY OWNERS TO VERIFY ANY AND ALL FEES ASSOCIATED
WITH THE INSTALLATION OF UTILITIES.
6. ALL CONSTRUCTION ON THIS SITE TO BE PERFORMED IN COMPLIANCE WITH O.S.H.A. STANDARDS FOR WORKER
SAFETY.
7. ANY PART OF SANITARY TRENCHES RUNNING UNDER OR WITHIN 5' OF PAVEMENT TO BE BACKFILLED WITH
GRANULAR MATERIAL.
8. IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY LOCATION, SIZE, AND ELEVATION OF EXISTING UTILITIES,
STRUCTURES, PIPES, AND PAVEMENTS. AS RELATED TO THEIR WORK. NOTIFY ENGINEER OF ANY CONFLICT AND/OR
DISCREPANCIES IN THE CONSTRUCTION DOCUMENTS.
9. CLEARANCE BETWEEN STORM / SANITARY SEWER SYSTEMS AND DOMESTIC/FIRE LINE SERVICE, SHALL BE
MAINTAINED AT 10' HORIZONTAL AND 18" VERTICAL.
10. CONTRACTOR TO INSTALL CONCRETE CRADLES AT PIPE CROSSINGS WHEN THE VERTICAL SEPARATION AS
MEASURED FROM THE EXTERIOR OF THE PIPES, BETWEEN SANITARY SEWERS, WATER MAINS AND STORM SEWERS
IS 18" OR LESS.
11. IF ANY EXISTING STRUCTURES TO REMAIN ARE DAMAGED DURING CONSTRUCTION, IT SHALL BE THE
CONTRACTOR'S RESPONSIBILITY TO REPAIR AND/OR REPLACE THE EXISTING STRUCTURE AS NECESSARY TO
RETURN IT TO IT'S CONDITION PRIOR TO CONSTRUCTION.
12. WHEN PERFORMING EXCAVATIONS DURING PERIODS OF WET WEATHER, PROVIDE ADEQUATE DEWATERING,
DRAINAGE AND GROUND WATER MANAGEMENT TO CONTROL MOISTURE OF SOILS.
13. COMPACTED "B" BORROW BACK FILL REQUIRED OVER ALL UTILITIES IN PAVED AREAS.
14. ALL UTILITY STRUCTURES IN PAVED AREAS SHALL BE FLUSH WITH PAVEMENT AND SHALL HAVE TRAFFIC BEARING
RINGS AND COVERS RATED FOR H20 LOADING.
15. FOLLOW ALL LOCAL AND STATE CODES IN REFERENCE TO SANITARY SEWER INSTALLATION.
16. SANITARY SEWER LATERALS SHALL BE BACKFILLED WITH GRANULAR MATERIAL FOR THE ENTIRE LENGTH OF THE
PIPE.
17. ALL EXISTING MANHOLES SHALL BE ADJUSTED TO NEW FINISH GRADE ELEVATIONS.
18. CLEANOUTS ARE REQUIRED WITHIN 18-60 INCHES OF THE BUILDING AND EVERY 100 FEET ALONG THE LATERAL.
19. LATERALS STATIONS ARE FROM THE NEAREST DOWNSTREAM MANHOLE.
20. REFER TO ASTM D2321 FOR INSTALLATION OF PVC SANITARY SEWER.
21. ALL SANITARY SEWER TO HAVE DEFLECTION AND LEAKAGE TESTING
AS PER CODE 327 IAC 3-6-19.C500 Sanitary PnPC500SANITARY PLAN & PROFILEW210497BCHW210497 01-13-2022DASJRV10 9 abcd8 7 6 efgh10 9 8 7 6 REVISIONS AND ISSUES5 4 3 2 1
PROJECT NO.
SHEET NO.abcd5 4 3 2 CHECKED BY:DRAWN BY:DESIGNED BY:DWG NAME:PROJECT NO.:DATEBYeDATE:1
LOCATION: H:\2021\W210497\Engineering\design\conset\C500 Sanitary PnP.dwgLAYOUT: C500DATE/TIME: August 11, 2022 - 7:56amPLOTTED BY: HansenbfhgENGINEERS317 | 846 - 6611800 | 452 - 6408317 | 843 - 0546faxWEIHELand Surveying | Civil EngineeringLandscape ArchitectureALLAN H. WEIHE, P.E., L.S. - FOUNDER10505 N. College AvenueIndianapolis, Indiana 46280weihe.netBuild with confidence.S MPart of Section 11, Township 17 North, Range 3 East, Clay Township, Hamilton County, IndianaREVISED PER TAC COMMENTS05-13-2022 TPG/BCHREVISED PER TRICO COMMENTS05-19-2022 BCHREVISED PER TAC COMMENTS06-28-2022 TPG/BCHREVISED PER TAC COMMENTS08-10-2022 TPG/BCH
SITE TBM
TBM#1
SET ON THE EAST BOLT ON A FIRE HYDRANT AT THE
BEGINNING OF THE CUL-DA-SAC ON THE NORTH SIDE OF
SANNER COURT.
ELEV. 841.80 (NAVD 88)
TBM#2
SET ON THE RIM OF A SANITARY MANHOLE AT THE END OF
THE CUL-DA-SAC OF SANNER COURT.
ELEV. 842.89 (NAVD 88)
W
S
N
E
340 SANNER COURT, INDIANAPOLIS, IN 46290THE RESERVE AT SPRINGMILL, SECTION 2,REPLAT OF LOTS 68, 69C, 70C, & 7108/23/22
C501 Sanitary SpecsC501SANITARY SPECS & DETAILSW210497BCHW210497 xxxDAS----10 9 abcd8 7 6 efgh10 9 8 7 6 REVISIONS AND ISSUES5 4 3 2 1
PROJECT NO.
SHEET NO.abcd5 4 3 2 CHECKED BY:DRAWN BY:DESIGNED BY:DWG NAME:PROJECT NO.:DATEBYeDATE:1
LOCATION: H:\2021\W210497\Engineering\design\conset\C501 Sanitary Specs.dwgLAYOUT: C501DATE/TIME: August 11, 2022 - 7:56amPLOTTED BY: HansenbfhgENGINEERS317 | 846 - 6611800 | 452 - 6408317 | 843 - 0546faxWEIHELand Surveying | Civil EngineeringLandscape ArchitectureALLAN H. WEIHE, P.E., L.S. - FOUNDER10505 N. College AvenueIndianapolis, Indiana 46280weihe.netBuild with confidence.S MPart of Section 11, Township 17 North, Range 3 East, Clay Township, Hamilton County, IndianaREVISED PER TAC COMMENTS05-13-2022 TPG/BCHREVISED PER TRICO COMMENTS05-19-2022 BCHREVISED PER TAC COMMENTS06-28-2022 TPG/BCHREVISED PER TAC COMMENTS08-10-2022 TPG/BCH340 SANNER COURT, INDIANAPOLIS, IN 46290THE RESERVE AT SPRINGMILL, SECTION 2,REPLAT OF LOTS 68, 69C, 70C, & 7108/23/22
LEGEND
= EXISTING STORM SEWER LINE
= SWALE
= EXISTING SANITARY SEWER LINE
= PROPOSED SANITARY SEWER LINE
= PROPOSED STORM SEWER LINE
= SANITARY SEWER MANHOLE
= STORM MANHOLE
= STORM INLET
= SOLID WALL UNDERDRAIN
SSD = SUBSURFACE DRAIN
U.E.
TOC
INV.
RCP
M.H.
STR.
D.&U.E.
M.E.
PROP.
TYP.
R.
EX.
S.S.E.
= TOP OF CASTING
= INVERT
= REINFORCED CONCRETE PIPE
= MANHOLE
= STRUCTURE
= DRAINAGE AND UTILITY EASEMENT
= UTILITY EASEMENT
= SANITARY SEWER EASEMENT
= MATCH EXISTING GRADE
= TYPICAL
= PROPOSED
= EXISTING
= RADIUS
= VARIABLE WIDTHV.W.
= BUILDING SETBACK LINE (B.S.L.)
= EASEMENT
ROW = RIGHT-OF-WAY
CL = CENTERLINE
PVC = POLYVINYL CHLORIDE PIPE
B-B = BACK TO BACK (CURB)
= SUBSURFACE DRAIN AND SUMP LINE
= EXISTING SUBSURFACE DRAINWWWWWWWW807978777675SANNER COURT(PRIVATE STREET)825
830
835
840
845
850
825
830
835
840
845
850
CONTRACTOR MUST
VERIFY INVERT
INFORMATION PRIOR
TO BEGINNING
CONSTRUCTION. IF A
DISCREPANCY EXISTS,
CONTACT THE
ENGINEER
IMMEDIATELY.
STORM SEWER STRUCTURE DATA TABLE
STRUCTURE
NUMBER
494
495
496
497
TOP OF
CASTING
838.09
843.47
843.20
843.20
STRUCTURE
TYPE
BEEHIVE INLET, 48'' DIA.
WATER QUALITY STRUCTURE, 36'' DIA.
CURB INLET, 24 X 24
CURB INLET, 24 X 24
CASTING TYPE
R-4342
PER MANUFACTURER
R-3501-TL
R-3501-TL
INVERT
INV IN (E)= 831.97 (15" EX. STM)
INV IN (N)= 834.74 (12" RCP)
INV OUT (W)= 831.97 (15" EX. STM)
INV IN (N)= 838.70 (12" RCP)
INV OUT (S)= 838.60 (12" RCP)
INV IN (N)= 839.05 (12" RCP)
INV OUT (S)= 838.95 (12" RCP)
INV OUT (S)= 839.20 (12" RCP)
STORM SEWER PIPE DATA TABLE
UPSTREAM
STRUCTURE
495
496
497
DOWNSTREAM
STRUCTURE
494
495
496
SIZE
12"
12"
12"
MATERIAL
RCP
RCP
RCP
LENGTH
159'
17'
26'
SLOPE
2.42%
1.47%
0.58%
FINISHED GRADE
EXISTING GRADE
PROFILE LEGEND
HYDRAULIC GRADE LINE
Know what'sbelow.
before you dig.Call
R
STORM SEWER NOTES
1. THE CONTRACTOR SHALL ADHERE TO ALL TERMS AND CONDITIONS AS OUTLINED IN THE EPA OR APPLICABLE STATE
GENERAL N.P.D.E.S. PERMIT FOR STORMWATER DISCHARGE ASSOCIATED WITH CONSTRUCTION ACTIVITIES AND
STORMWATER POLLUTION PREVENTION PLAN.
2. REFER TO THE INDIANA DEPARTMENT OF TRANSPORTATION (INDOT) STANDARD SPECIFICATIONS, LATEST EDITION,
FOR BASIC MATERIALS AND CONSTRUCTION METHODS.
3. THE CONTRACTOR SHALL CONTACT APPLICABLE STATE UNDERGROUND LOCATION SERVICE AT LEAST 72 HOURS
PRIOR TO ANY WORK AND SHALL CONTACT THE OWNER AND/OR ENGINEER SHOULD UTILITIES APPEAR TO BE IN
CONFLICT WITH THE PROPOSED IMPROVEMENTS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO
RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS.
4. THE PLANS SHOW THE LOCATIONS OF ALL KNOWN UTILITIES LOCATED WITHIN THE LIMITS OF CONSTRUCTION
ACCORDING TO INFORMATION PROVIDED BY THE VARIOUS UTILITY COMPANIES, PREVIOUS CONSTRUCTION PLANS
AND AS EVIDENCED BY OBSERVATION OF ABOVE GROUND CONDITIONS BY THE SURVEYOR. THE ACCURACY OF
THIS INFORMATION IS NOT GUARANTEED.
5. THE CONTRACTOR SHALL CONTACT ALL UTILITY COMPANIES TO LOCATE MAINS, CONDUITS, SERVICE LINES, AND
OTHER FACILITIES WITHIN THE CONSTRUCTION LIMITS. THE LOCATION AND PROTECTION OF UTILITY STRUCTURES,
THEIR SUPPORT AND MAINTENANCE DURING CONSTRUCTION (IN COOPERATION WITH APPLICABLE UTILITY
COMPANY) IS THE EXPRESSED RESPONSIBILITY OF THE CONTRACTOR.
6. THE CONTRACTOR SHALL CONTACT ALL APPLICABLE UTILITIES AND VERIFY ANY AND ALL FEES ASSOCIATED WITH
THE INSTALLATION OF ALL UTILITIES.
7. ALL CONSTRUCTION ON THIS SITE TO BE PERFORMED IN COMPLIANCE WITH O.S.H.A. STANDARDS FOR WORKER
SAFETY.
8. ANY PART OF STORM SEWER TRENCHES RUNNING UNDER OR WITHIN 5' OF PAVEMENT TO BE BACKFILLED WITH
GRANULAR MATERIAL.
9. IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY LOCATIONS, SIZES, AND ELEVATIONS OF EXISTING UTILITIES,
STRUCTURES, PIPES, PAVEMENTS AS RELATED TO THEIR WORK. NOTIFY ENGINEER OF ANY CONFLICT AND/OR
DISCREPANCIES IN THE CONSTRUCTION DOCUMENTS.
10. MINIMUM CLEARANCE BETWEEN STORM / SANITARY SEWER SYSTEMS AND DOMESTIC/FIRE LINE SERVICE, SHALL BE
10' HORIZONTAL AND 18" VERTICAL.
11. CONTRACTOR TO INSTALL CONCRETE CRADLES AT PIPE CROSSING WHEN THE VERTICAL SEPARATION (AS
MEASURED FROM THE EXTERIOR OF THE PIPES) BETWEEN SANITARY SEWERS, WATER MAINS AND STORM SEWERS
IS 18" OR LESS.
12. IF ANY EXISTING STRUCTURES TO REMAIN ARE DAMAGED DURING CONSTRUCTION, IT SHALL BE THE
CONTRACTOR'S RESPONSIBILITY TO REPAIR AND/OR REPLACE THE EXISTING STRUCTURE AS NECESSARY TO
RETURN IT TO IT'S CONDITION PRIOR TO CONSTRUCTION.
13. WHEN PERFORMING EXCAVATIONS DURING PERIODS OF WET WEATHER, PROVIDE ADEQUATE DEWATERING,
DRAINAGE AND GROUND WATER MANAGEMENT TO CONTROL MOISTURE OF SOILS.
14. COMPACTED "B" BORROW BACK FILL REQUIRED OVER ALL UTILITIES IN PAVED AREAS.
15. FOLLOW ALL LOCAL AND STATE CODES IN REFERENCE TO STORM SEWER INSTALLATION.
16. ALL EXISTING MANHOLE AND CATCH BASIN GRATES SHALL BE ADJUSTED TO NEW FINISH GRADE ELEVATIONS.
17. EXISTING PIPES WITHIN CONSTRUCTION LIMITS ARE TO BE CLEANED OUT TO REMOVE ALL SILT AND DEBRIS.
18. ALL STORM PIPE CONNECTIONS AT STRUCTURES SHALL BE GROUTED TO ASSURE CONNECTIONS AT STRUCTURES
ARE WATERTIGHT.
19. ALL STORM SEWER STRUCTURES IN PAVED AREAS SHALL BE FLUSH WITH PAVEMENT AND SHALL HAVE TRAFFIC
BEARING RING AND COVERS RATED FOR H20 LOADING.
20. ALL STORM SEWER STRUCTURES SHALL HAVE A SMOOTH AND UNIFORMLY POURED MORTAR CHANNEL FROM
INVERT IN TO INVERT OUT.
21. NEW PIPES AND STRUCTURES WITHIN CONSTRUCTION LIMITS ARE TO BE CLEANED OUT TO REMOVE ALL SILT AND
DEBRIS PRIOR TO FINAL TURNOVER TO THE OWNER.
22. IF HDPE PIPE IS SPECIFIED, USE DUAL WALLED, HANCOR HQ, ADS N-12 PIPE OR APPROVED EQUAL.
23. ALL FITTINGS AND ACCESSORIES INCLUDING BUT NOT LIMITED TO END CAPS, CLEANOUTS, REDUCERS, ETC., SHALL
BE HDPE MATERIAL; IF SPECIFIED, COMPARABLE WITH STORAGE PIPES.
24. PROVIDE BACKFILL WITH A MINIMUM OF 4" BEDDING MATERIAL OF #8 AGGREGATE COMPACTED IN 8" LIFTS TO 95%
MAXIMUM DRY DENSITY.
25. VERIFY EXISTING STORM INVERT ELEVATIONS PRIOR TO STARTING NEW STORM SEWER CONNECTION.
26. THE STORM SEWER SYSTEM SHALL BE CONSTRUCTED PER DESIGN SPECIFIED AND AS APPROVED BY THE CITY OF
CARMEL ON THE FINAL APPROVED CONSTRUCTION PLANS. DEVIATIONS FROM THE APPROVED DESIGN SHALL ONLY
BE PERMITTED DUE TO A SPECIAL CIRCUMSTANCES OR DIFFICULTY DURING CONSTRUCTION AND WILL REQUIRE
PRIOR FIELD APPROVAL FROM A DESIGNATED REPRESENTATIVE OF THE CITY OF CARMEL IN ADDITION TO
SUPPLEMENTAL APPROVAL BY THE DESIGN ENGINEER. AN EXAMPLE OF ANY SUCH DEVIATION SHALL BE INCLUDED
AS A REQUIREMENT ON AS-BUILT/RECORD DRAWINGS SUBMITTED FOR RELEASE OF PERFORMANCE GUARANTEES.
APPROVED DESIGN SLOPES IDENTIFIED AS GENERATING VELOCITIES OF 2.5 FPS OR LESS OR 10 FPS OR GREATER
(AT FULL FLOW CAPACITY) SHALL REQUIRE AS-BUILT CERTIFICATION AT THE TIME OF CONSTRUCTION, PRIOR TO
BACKFILLING THE PIPE. THE CONTRACTOR IS INSTRUCTED TO AS-BUILT EACH SECTION OF STORM PIPE AS IT IS
BEING INSTALLED TO ENSURE COMPLIANCE WITH THE DESIGN PLANS AND AS APPROVED BY THE CITY OF CARMEL.
16.C600 Storm PnPC600STORM PLAN & PROFILEW210497BCHW210497 01-13-2022DASJRV10 9 abcd8 7 6 efgh10 9 8 7 6 REVISIONS AND ISSUES5 4 3 2 1
PROJECT NO.
SHEET NO.abcd5 4 3 2 CHECKED BY:DRAWN BY:DESIGNED BY:DWG NAME:PROJECT NO.:DATEBYeDATE:1
LOCATION: H:\2021\W210497\Engineering\design\conset\C600 Storm PnP.dwgLAYOUT: C600DATE/TIME: August 11, 2022 - 7:56amPLOTTED BY: HansenbfhgENGINEERS317 | 846 - 6611800 | 452 - 6408317 | 843 - 0546faxWEIHELand Surveying | Civil EngineeringLandscape ArchitectureALLAN H. WEIHE, P.E., L.S. - FOUNDER10505 N. College AvenueIndianapolis, Indiana 46280weihe.netBuild with confidence.S MPart of Section 11, Township 17 North, Range 3 East, Clay Township, Hamilton County, IndianaREVISED PER TAC COMMENTS05-13-2022 TPG/BCHREVISED PER TRICO COMMENTS05-19-2022 BCHREVISED PER TAC COMMENTS06-28-2022 TPG/BCHREVISED PER TAC COMMENTS08-10-2022 TPG/BCH
SITE TBM
TBM#1
SET ON THE EAST BOLT ON A FIRE HYDRANT AT THE
BEGINNING OF THE CUL-DA-SAC ON THE NORTH SIDE OF
SANNER COURT.
ELEV. 841.80 (NAVD 88)
TBM#2
SET ON THE RIM OF A SANITARY MANHOLE AT THE END OF
THE CUL-DA-SAC OF SANNER COURT.
ELEV. 842.89 (NAVD 88)
N
W
E
S
340 SANNER COURT, INDIANAPOLIS, IN 46290THE RESERVE AT SPRINGMILL, SECTION 2,REPLAT OF LOTS 68, 69C, 70C, & 7108/23/22
C601 Storm SpecsC601STORM SPECS & DETAILSW210497BCHW210497 xxxDAS----10 9 abcd8 7 6 efgh10 9 8 7 6 REVISIONS AND ISSUES5 4 3 2 1
PROJECT NO.
SHEET NO.abcd5 4 3 2 CHECKED BY:DRAWN BY:DESIGNED BY:DWG NAME:PROJECT NO.:DATEBYeDATE:1
LOCATION: H:\2021\W210497\Engineering\design\conset\C601 Storm Specs.dwgLAYOUT: C601DATE/TIME: August 11, 2022 - 7:56amPLOTTED BY: HansenbfhgENGINEERS317 | 846 - 6611800 | 452 - 6408317 | 843 - 0546faxWEIHELand Surveying | Civil EngineeringLandscape ArchitectureALLAN H. WEIHE, P.E., L.S. - FOUNDER10505 N. College AvenueIndianapolis, Indiana 46280weihe.netBuild with confidence.S MPart of Section 11, Township 17 North, Range 3 East, Clay Township, Hamilton County, IndianaREVISED PER TAC COMMENTS05-13-2022 TPG/BCHREVISED PER TRICO COMMENTS05-19-2022 BCHREVISED PER TAC COMMENTS06-28-2022 TPG/BCHREVISED PER TAC COMMENTS08-10-2022 TPG/BCH340 SANNER COURT, INDIANAPOLIS, IN 46290THE RESERVE AT SPRINGMILL, SECTION 2,REPLAT OF LOTS 68, 69C, 70C, & 7108/23/22
SANNER CO
U
R
T
MILLRIDGE DRIVE
W W W W
W W W W
W
W
W
80
79
78
7776
75
71
68
SANNER COURT
(PRIVATE STREET)SANSANSANSANSANSANSANKnow what'sbelow.
before you dig.Call
R
W
S
N
E
LEGEND
W
W
T(A)
E(A)
G
Gas Pole
EXISTING WATER MAIN
PROPOSED WATER MAIN
PROPOSED HYDRANT WITH
HYDRANT VALVE
EXISTING HYDRANT WITH
HYDRANT VALVE
BUTTERFLY VALVE
VALVE
BLOWOFF ASSEMBLY
AIR RELIEF VALVE
PLUG
REDUCER
T.J. TEE
M.J. SLEEVE
CROSS
CASING PIPE
GAS LINES
TELEPHONE LINES
ELECTRIC LINES
FUTURE DRIVEWAY
ELECTRIC PEDESTAL
PHONE PEDESTAL
ELECTRICAL TRANSFORMER
SINGLE WATER LATERAL
TELEPHONE POLE
GAS POLE
INLET
TREE
GAS VALVE
PARCEL ID
ADAPTER
BEND
KICKER
WATER MAIN NOTES:
1. SEE CONSTRUCTION STANDARDS OF THE LOCAL WATER UTILITY FOR THE
INSTALLATION OF WATER MAINS, SERVICE LINES, METERS, AND
APPURTENANCES.
2. MINIMUM COVER OVER TOP OF ALL WATER MAINS TO BE 54 INCHES FROM
FINISHED GRADE.
3. ALL VALVES ARE TO BE INSTALLED WITHIN 10' OF AN INTERSECTION OR NEAR
A FIRE HYDRANT.
4. VALVES MUST HAVE POSI-CAP OR EQUIVALENT, FOR VALVE BOX
STABILIZATION AND CENTERING.
5. THE WATER MAIN MUST MAINTAIN A MINIMUM OF 10 FEET OF SEPARATION
WITH THE SEWER MAIN AT ALL TIMES.
6. HYDRANTS SHALL BE PER THE REQUIREMENTS OF CARMEL WATER.
7. FIRE HYDRANTS SHALL HAVE 5 INCH STORZ CONNECTION (MUELLER MODEL
290220 FOR CASTING AND 290221 CAP OR APPROVED EQUAL). THE 5 INCH
STORZ CONNECTION SHALL FACE THE STREET. HYDRANTS SHALL BE PLACED
BETWEEN THE CURB AND THE SIDEWALK IN THE RIGHT OF WAY.
8. INSTALL ALL DUCTILE IRON WATER MAINS AND ACCESSORIES IN
ACCORDANCE WITH AWWA C600.
9. WRAP ALL FITTINGS IN POLYETHYLENE ENCASEMENT.
10. THE MAXIMUM SPACING BETWEEN FIRE HYDRANTS IN RESIDENTIAL
NEIGHBORHOODS AND RESIDENTIALLY ZONES AREAS SHALL BE 500 FEET.
11. ALL WATER TO BE RESTRAINED CITY OF CARMEL STANDARDS.
12. WATER AVAILABILITY FEES WILL BE PAID AT THE TIME OF ACQUIRING THE
BUILDING PERMITS.
13. CARMEL WATER INSPECTION STAFF MUST BE NOTIFIED 48 HOURS PRIOR TO
COMMENCING WITH NEW WATER MAIN CONSTRUCTION.C700 Water PlanC700WATER PLANW210497BCHW210497 01-13-2022DASJRV10 9 abcd8 7 6 efgh10 9 8 7 6 REVISIONS AND ISSUES5 4 3 2 1
PROJECT NO.
SHEET NO.abcd5 4 3 2 CHECKED BY:DRAWN BY:DESIGNED BY:DWG NAME:PROJECT NO.:DATEBYeDATE:1
LOCATION: H:\2021\W210497\Engineering\design\conset\C700 Water Plan.dwgLAYOUT: C700DATE/TIME: August 11, 2022 - 7:57amPLOTTED BY: HansenbfhgENGINEERS317 | 846 - 6611800 | 452 - 6408317 | 843 - 0546faxWEIHELand Surveying | Civil EngineeringLandscape ArchitectureALLAN H. WEIHE, P.E., L.S. - FOUNDER10505 N. College AvenueIndianapolis, Indiana 46280weihe.netBuild with confidence.S MPart of Section 11, Township 17 North, Range 3 East, Clay Township, Hamilton County, IndianaREVISED PER TAC COMMENTS05-13-2022 TPG/BCHREVISED PER TRICO COMMENTS05-19-2022 BCHREVISED PER TAC COMMENTS06-28-2022 TPG/BCHREVISED PER TAC COMMENTS08-10-2022 TPG/BCH
SITE TBM
TBM#1
SET ON THE EAST BOLT ON A FIRE HYDRANT AT THE
BEGINNING OF THE CUL-DA-SAC ON THE NORTH SIDE OF
SANNER COURT.
ELEV. 841.80 (NAVD 88)
TBM#2
SET ON THE RIM OF A SANITARY MANHOLE AT THE END OF
THE CUL-DA-SAC OF SANNER COURT.
ELEV. 842.89 (NAVD 88)340 SANNER COURT, INDIANAPOLIS, IN 46290THE RESERVE AT SPRINGMILL, SECTION 2,REPLAT OF LOTS 68, 69C, 70C, & 7108/23/22
C701 Water SpecsC701WATER SPECS & DETAILSW210497BCHW210497 xxxDAS----10 9 abcd8 7 6 efgh10 9 8 7 6 REVISIONS AND ISSUES5 4 3 2 1
PROJECT NO.
SHEET NO.abcd5 4 3 2 CHECKED BY:DRAWN BY:DESIGNED BY:DWG NAME:PROJECT NO.:DATEBYeDATE:1
LOCATION: H:\2021\W210497\Engineering\design\conset\C701 Water Specs.dwgLAYOUT: C701DATE/TIME: August 11, 2022 - 7:57amPLOTTED BY: HansenbfhgENGINEERS317 | 846 - 6611800 | 452 - 6408317 | 843 - 0546faxWEIHELand Surveying | Civil EngineeringLandscape ArchitectureALLAN H. WEIHE, P.E., L.S. - FOUNDER10505 N. College AvenueIndianapolis, Indiana 46280weihe.netBuild with confidence.S MPart of Section 11, Township 17 North, Range 3 East, Clay Township, Hamilton County, IndianaREVISED PER TAC COMMENTS05-13-2022 TPG/BCHREVISED PER TRICO COMMENTS05-19-2022 BCHREVISED PER TAC COMMENTS06-28-2022 TPG/BCHREVISED PER TAC COMMENTS08-10-2022 TPG/BCH340 SANNER COURT, INDIANAPOLIS, IN 46290THE RESERVE AT SPRINGMILL, SECTION 2,REPLAT OF LOTS 68, 69C, 70C, & 7108/23/22