Loading...
HomeMy WebLinkAbout2018.01057.CE.2019-10-31.EC Bond Estimate.stampedOPINION OF PROBABLE COSTS (based on Final Construction Document drawings dated 10/10/2019) Project:Intuitive Health Carmel Project No:2018.01057 Date:10/31/2019 Prepared by:Structurepoint Erosion Control Quantity Unit Unit Price Extended Cost Silt Fence 1,091 LF $1.67 $1,822 Inlet Protection 12 EA $150.00 $1,800 Concrete Washout 1 EA $1,000.00 $1,000 Erosion Control Blanket 52 SY $1.85 $97 Gravel Construction Entrance 1 EA $3,000.00 $3,000 Seeding, Permanent 5,245 SFT $0.10 $524 Aqua-Swirl AS-6 1 EA $25,000.00 $25,000 Rip Rap 1.40 SY $500.00 $702 Subtotal $33,945