Loading...
HomeMy WebLinkAboutC604 SITE DETAILSAQUA-SWIRL™ PCS SPECIFICATION NOTES 1.Manufacturer shall be responsible for complete assembly of Swirl Concentrator. 2. Polymer Coated Steel (PCS) Swirl Concentrator shall be fabricated from polymer pre-coated steel sheet for corrugated steel pipe, and shall comply with ASTM A 760 and ASTM A 742. 3. Stub outs and internal components shall be supplied by manufacturer and MIG welded using accepted welding practices. 4. Manufacturer shall supply direct access to Swirl Concentrator via 30-inch ID riser(s). Riser should not be field cut by Contractor, Riser should maintain its finish cut length as supplied by manufacturer to match final grade per approved site elevations (as indicated on approved shop drawing). If necessary to extend riser, Contractor should use adjusting rings to bring top of structure to grade. 5. Contractor shall supply pipe couplings to and from Swirl Concentrator, which shall be Mar-Mac, Fernco, or Mission style flexible boot with stainless steel tension bands and shear guard. Mar-Mac couplings should be used for connections to corrugated plastic pipe and are recommended for pipe 24" ID and up. Mar Mac can be reached at: 877-962-7622, or: cort.calk@marmac.com. 6. Contractor shall prepare excavation and off-load Aqua-Swirl. Contractor is responsible for bedding and backfill around Aqua-Swirl as detailed on site plan (see notes 11 and 12). Contractor shall inspect AquaSwirl for any exposed metal (scratches or other damage to the polymer coating). This must be recoated using the touch up kit supplied with each PCS unit prior to installation or placement of backfill. 7. Manufacturer shall supply standard manhole frame(s) and cover(s). (Traffic rated H20) 8. Where traffic loading (H-20) is required or anticipated, a 4-foot diameter, 14-inch thick reinforced concrete pad must be placed over the Swirl Concentrator to support and level the manhole frame. The top of riser pipe must be wrapped with compressible expansion joint material to a minimum 1-inch thickness to allow transfer of wheel loads from manhole cover to concrete slab. Manhole cover shall bear on concrete slab and not on riser pipe. The concrete slab shall have a minimum strength of 3,000 psi and be reinforced with #4 reinforcing steel (per drawing). Minimum cover over reinforcing steel shall be 1-inch. Top of manhole cover and concrete slab shall be level with finish grade. 9. Unless other traffic barriers are present, bollards shall be placed around access risers in non-traffic areas to prevent inadvertent loading by maintenance vehicles. Sample of typical bollard installation detail and recommended locations of bollards around the Swirl Concentrator can be provided upon request. 10. Where high groundwater elevations are present or anticipated, Contractor shall supply concrete anti-floatation pad underneath and poured over the octagonal base plate of the swirl (see Anti-Floatation Base Detail) to prevent buoyancy and base plate deflection (details, if necessary, available upon request). 11. Excavation and Bedding - The trench and trench bottom shall be constructed in accordance with ASTM A 798 Section 5, Trench Excavation, Section 6, Foundation, and Section 7, Bedding. The PCS Swirl Concentrator shall be installed on a stable base consisting of at least 6-inches of fine, readily compacted soil or granular fill material, and compacted to 95% proctor density. Bedding shall not contain stones retained on a 3-inch ring, frozen lumps, highly plastic clay, organic material, corrosive material, or other deleterious foreign materials. All required safety precautions for Swirl Concentrator installation are the responsibility of the Contractor and shall be per OSHA approved methods. 12. Backfill Requirements - Backfill materials shall be fine, readily compacted soil or granular fill material, and compacted to 90% proctor density. Processed granular materials with excellent structural characteristics are preferred. Coarse grained soils of USCS Groups GW, GP, GM, GC, SW, and SP as described in ASTM D 2487 are generally acceptable materials when compacted to 90% proctor density. Backfill shall not contain stones retained on a 3-inch ring, frozen lumps, highly plastic clay, organic material, corrosive material, or other deleterious foreign materials. Backfilling shall conform to ASTM A 798, Section 10, Structural Backfill Placement. Backfill shall be placed in 6 to 12 inch layers or “lifts” and compacted before adding the next lift. Backfill shall extend at least 18 inches outward from Swirl Concentrator and for the full height of the Swirl Concentrator (including riser(s)) extending laterally to undisturbed soils. ™ Phone (888) 344-9044 Fax (423) 826-2112 STORMWATER TREATMENT SOLUTIONS www.aquashieldinc.com Aqua-Swirl Concentrator Model AS-6 BYP PCS Standard Detail AS-6 PCS STD 01/06/15 Scale: Drawn By: Document: Date: JCW 1:20 U.S. Patent No. 6524473 and other Patent Pending Backfill shall extend at least 18 inches [457 mm] outward from Swirl Concentrator and for the full height of the Swirl Concentrator (including riser) extending laterally to undisturbed soils. (See MH Detail Below) STORMWATER TREATMENT SOLUTIONS Phone (888) 344-9044 www.aquashieldinc.com ™ Internal Baffles Slide riser over top ring and bolt in 4 places Riser 68" [1727 mm] 104" [2896 mm] to 116" [2946 mm] Swirl Inlet/Outlet Bedding Undisturbed Soil Backfill 6" [152 mm] 18" [457 mm] Section A-A Grade (Rim) 30" [762 mm] Rim elevations to match finished grade. Manhole Frame and Cover by Manufacturer. (See Details) 5" [127 mm] MH Frame VariesVaries Plan View 84" [2134 mm] 84" [2134 mm] Outlet A Internal Baffles Octagonal Base Plate Pipe coupling by Contractor. 12" [305 mm] long Stub-out by Manufacturer. Ø72" [Ø1829 mm] 3 5/8" [91 mm] 3/8" [10 mm] 13/16" [20 mm] Manhole Frame & Cover Detail NTS For Non-Traffic Areas Only Soil 13/16" [20 mm] Unless other traffic barriers are present, bollards shall be placed around access riser(s) in non-traffic areas to prevent inadvertent loading by maintenance vehicles. Soil Place small amount of concrete [3,000 psi [20 MPa] (min)] to support and level manhole frame. DO NOT allow manhole frame to rest upon riser. Riser Frame Cover 38 3/8" [975 mm] Min. 9 5/8" [244 mm] Wrap Compressible Expansion Joint Material to a minimum 1-inch [25 mm] thickness around top of riser to allow transfer of inadvertent loading from manhole cover to concrete slab. Backfill (90% Proctor Density) Concrete Concrete6 3/8" [163 mm] Gravel Backfill Gravel Backfill 3 5/8"Cover Frame 1" [25 mm] Thick Expansion Joint Material30" [762 mm] Riser #4 [13 mm] Rebar @ 6" [152 mm] Each Way 11 3/16"3/8" 3,000 psi [20 MPa] (min) Concrete Manhole Frame & Cover Detail For Traffic Loading Areas NTS If traffic loading (HS-25) is required or anticipated, a 4-foot [1.22 m] diameter, 14-inch [356 mm] thick reinforced concrete pad must be placed over the Stormwater Treatment System Riser to support and level the manhole frame, as shown. The top of riser pipe must be wrapped with compressible expansion joint material to a minimum 1-inch [25 mm] thickness to allow transfer of wheel loads from manhole cover to concrete slab. Manhole cover shall bear on concrete slab and not on riser pipe. The concrete slab shall have a minimum strength of 3,000 psi [20 MPa] and be reinforced with #4 [13 mm] reinforcing steel as shown. Minimum cover over reinforcing steel shall be 1-inch [25 mm]. Top of manhole cover and concrete slab shall be level with finish grade. Backfill (90% Proctor Density) 38 3/8" Aqua-Swirl Polymer Coated Steel (PCS) Stormwater Treatment System A Inlet 36" [914 mm] PCS Max 2733 Kanasita Drive, Suite 111, Chattanooga, TN 37343 * Please see accompanied Aqua-Swirl specification notes. * See Site Plan for actual system orientation. ** Orientation may vary from 90°, 180°, or custom angles to meet site conditions. Note: As an alternative, 42-inch OD, HS-20/25 rated precast concrete rings may be substituted. 14-inch thickness must be maintained. 180°** 7260 Shadeland Station | Indianapolis, Indiana 46256-3957 TEL 317.547.5580 | FAX 317.543.0270 www.structurepoint.com FINAL CONSTRUCTION DOCS PLOT DATE: 10/10/2019 1:32 PMPLOT SCALE: 1:2.5849EDIT DATE: 10/10/2019EDITED BY: CPATTERSONDRAWING FILE: P:\2018\01057\D. Drawings\Civil\Construction Documents\2018.01057.CE.C600.SD.dwgProject Number CERTIFIED BY ISSUANCE INDEX DATE: PROJECT PHASE: REVISION SCHEDULE NO.DESCRIPTION DATE 10/10/2019 2018.01057 INTUITIVE HEALTH RIVERVIEW HEALTH URGENT CARE & EMERGENCY ROOM 10830 N Michigan Rd Zionsville, IN 46077 10/10/2019 C604 SITE DETAILS