Loading...
HomeMy WebLinkAboutC400 Drainage PlanPRELIMINARY - NOT FOR CONSTRUCTIONCITY OF CARMEL GENERAL DRAINAGE NOTE:ALL EXISTING PERIMETER ROAD DRAINAGESTRUCTURES AND BRIDGES ACROSS THE FRONTAGEOF THIS DEVELOPMENT ARE INDICATED ON THEPLANS. PROVISIONS HAVE BEEN MADE TO IMPROVEOR REPLACE ANY DRAINAGE STRUCTURES ANDBRIDGES AS NECESSARY OR AS REQUEST BY THE CITYTO ACCOMMODATE THE PAVEMENT WIDENING,AUXILIARY LANES, MULTI-USE PATH, AND ANY OTHERREQUIRED IMPROVEMENTS TO THE PROPERTY ORTHE ROADWAY. THE COST TO IMPROVE OR REPLACEANY DRAIANGE STRUCTURES AND BRIDGES WILL BEBORNE BY THE DEVELOPER.STR. 100STR. 101STR. 200STR. 201EXPANDED POND DESIGN SUMMARY TABLE(FOR AGENCY REVIEW ONLY)ONSITE AREA = 1.26 ACRESOFFSITE AREA = 3.01 ACRES5/7/2024