HomeMy WebLinkAboutC500 Utility PlanPRELIMINARY - NOT FOR CONSTRUCTIONCITY OF CARMEL GENERAL UTILITY NOTE:UTILITY RELOCATIONS REQUIRED BY THE PROJECTSHALL BE THE RESPONSIBILITY OF THE DEVELOPER.UTILITY LINE RELOCATIONS REQUIRED FOR ROADPROJECTS THAT RESULT IN A CONFLICT WITHPROPOSED DEVELOPMENT SHALL BE THEDEVELOPER'S RESPONSIBILITY TO RESOLVE WITH THEUTILITY. EXISTING UTILITY POLES AND LINESREQUIRED TO BE RELOCATED SHALL BE LOCATED TOWITHIN ONE FOOT OF PROPOSED RIGHT-OF-WAYLINE.5/7/2024