HomeMy WebLinkAboutCivil Plans 4.8.19 1GRAND BLVDW MAIN ST
GRAND BLVDW MAIN ST
FAIRFAX MANOR DRVIRGINIA BLVDUNION SPRING
DR
SOUTHWEST CORNER OF GRAND & MAIN
CARMEL, IN 46032
DOCKET #17100028 DP AMEND / ADLS
C001TITLE SHEETw180605-C001 titleNO SCALE
PROJECT LOCATION
LOCATION MAP
AMERICAN STRUCTUREPOINT SITE BENCHMARK, HARRISON CAST IRON MONUMENT AT NORTHEAST
CORNER SOUTHEAST QUARTER SECTION 26-T18N-R3E ELEV. 856.31 (NAVD 88)
BENCHMARK INFORMATION
BLOCK 1 IN GRAND & MAIN SECONDARY PLAT, A PART OF THE SOUTHEAST QUARTER OF SECTION 26,
TOWNSHIP 18 NORTH, RANGE 3 EAST, CLAY TOWNSHIP, HAMILTON COUNTY, INDIANA ACCORDING TO
THE PLAT THEREOF RECORDED APRIL 8, 2016 IN PLAT CABINET 5, SLIDE 479 AS INSTRUMENT NO.
2016015691 IN THE OFFICE OF THE RECORDER OF HAMILTON COUNTY, INDIANA.
LAND DESCRIPTION
1.THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING, OR
VERIFYING THAT ALL PERMITS AND APPROVALS ARE OBTAINED FROM
THE RESPECTIVE CITY, COUNTY, AND STATE AGENCIES PRIOR TO
STARTING CONSTRUCTION.
2.IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO DETERMINE THE
EXACT LOCATION OF ALL EXISTING UTILITIES IN THE VICINITY OF THE
CONSTRUCTION AREA PRIOR TO STARTING CONSTRUCTION
3.IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO NOTIFY AND
COORDINATE CONSTRUCTION WITH ALL RESPECTIVE UTILITIES.
4.ALL QUANTITIES GIVEN ON THESE PRINTS, VERBALLY OR IN THE SCOPE
OF WORK SECTION ARE ESTIMATES AND SHALL BE CONFIRMED BY THE
BIDDING CONTRACTORS.
5.OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA)
STANDARDS FOR EXCAVATIONS; FINAL RULE 29 CFR PART 1926, SUBPART
"P" APPLIES TO ALL EXCAVATIONS EXCEEDING FIVE (5) FEET IN DEPTH.
6.IN ADDITION, EXCAVATION EXCEEDING TWENTY (20) FEET IN DEPTH
REQUIRE THE DESIGN OF A TRENCH SAFETY SYSTEM BY A REGISTERED
PROFESSIONAL ENGINEER.
7.IT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER AND CONTRACTOR
TO MAINTAIN QUALITY CONTROL THROUGHOUT THIS PROJECT.
8.TEMPORARY TRAFFIC CONTROL DURING CONSTRUCTION TO CONFORM
TO APPLICABLE LOCAL STANDARDS.
9.THE ENGINEER AND/OR OWNER DISCLAIM ANY ROLE IN THE
CONSTRUCTION MEANS AND METHODS ASSOCIATED WITH THE PROJECT
AS SET FORTH IN THESE PLANS.
10.ANY FIELD TILES ENCOUNTERED DURING EXCAVATION SHALL BE
REPAIRED AND CONNECTED TO NEW STORM SEWERS AND POSITIVE
DRAINAGE PRESERVED.
11.IT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER THAT ALL
LANDSCAPE REQUIREMENTS ARE MET AND CONFORM TO APPLICABLE
LOCAL STANDARDS.
12.THE SITE DOES NOT LIE IN A SPECIAL FLOOD HAZARD AREA AS
ESTABLISHED BY THE FEDERAL EMERGENCY MANAGEMENT AGENCY -
NATIONAL FLOOD INSURANCE PROGRAM, WHEN PLOTTED BY SCALE ON
FLOOD INSURANCE RATE MAP #18057C0207G PANEL 207 OF 300, DATED
NOVEMBER 19, 2014.
13.BEARINGS, DIMENSIONS AND EASEMENTS ARE SHOWN FOR REFERENCE
ONLY. SEE RECORD SURVEYS & PLAT FOR EXACT INFORMATION.
14.THIS SITE DOES NOT CONTAIN ANY WETLANDS AT SHOWN ON THE U.S.
DEPARTMENT OF THE INTERIOR FISH AND WILDLIFE SERVICE; CARMEL,
INDIANA, NATIONAL WETLANDS INVENTORY MAP ONLINE VIEWER, VIEWED
SEPTEMBER 2017.
GENERAL NOTES CITY OF CARMEL STANDARD NOTES
1.NO EARTH DISTURBING ACTIVITY MAY TAKE PLACE WITHOUT AN APPROVED STORM WATER MANAGEMENT
PERMIT
2.THESE PLANS COMPLY WITH ALL ADA REQUIREMENTS.
3.UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER.
UTILITY LINE RELOCATIONS REQUIRED FOR ROAD PROJECTS THAT RESULT IN A CONFLICT WITH PROPOSED
DEVELOPMENT SHALL BE THE DEVELOPER TO RESOLVE WITH THE UTILITY. EXISTING POLE LINES REQUIRED
TO BE RELOCATED TO WITHIN ONE FOOT OF PROPOSED RIGHT-OF-WAY LINE.
4.ALL EXISTING PERIMETER ROAD DRAINAGE STRUCTURES AND BRIDGES ACROSS THE FRONTAGE OF THIS
DEVELOPMENT ARE INDICATED ON THE PLANS. PROVISIONS HAVE BEEN MADE TO IMPROVE OR REPLACE ANY
DRAINAGE STRUCTURES AND BRIDGES AS NECESSARY OR AS REQUEST BY THE CITY TO ACCOMMODATE THE
PAVEMENT WIDENING, AUXILIARY LANES, MULTI-USE PATH, AND ANY OTHER REQUIRED IMPROVEMENTS TO
THE PROPERTY OR THE ROADWAY. THE COST TO IMPROVE OR REPLACE ANY DRAINAGE STRUCTURES AND
BRIDGES WILL BE BORNE BY THE DEVELOPER.
5.DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL BE RESTORED/REPAIRED TO THE SATISFACTION OF THE
CITY AT THE COMPLETION OF THE PROJECT. THE CONTRACTOR IS ENCOURAGED TO INSPECT THE
RIGHT-OF-WAY WITH THE CITY PRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THE EXISTING
CONDITION OF THE RIGHT-OF-WAY.
6.CONTRACTOR SHALL PROTECT THE EXISTING CITY DUAL DUCT BANK IN THE RIGHT -OF-WAY. IN THE EVENT
OF CONFLICT WITH THE PROPOSED IMPROVEMENTS, RELOCATION OF THE DUAL DUCT BANK AND ALL
ASSOCIATED/APPURTENANT/ANCILLARY ITEMS SHALL BE THE SOLE RESPONSIBILITY OF THE DEVELOPER
SUBJECT TO REVIEW AND APPROVAL BY THE CITY.
7.ALL PAVING WITHIN THE EXISTING AND PROPOSED CITY RIGHT -OF-WAY SHALL CONFORM TO THE
REQUIREMENTS OF THE DEPARTMENT OF ENGINEERING. THE CONTRACTOR SHALL CONTACT THE
DEPARTMENT OF ENGINEERING TO SCHEDULE A PRE-CONSTRUCTION MEETING TO REVIEW THE
DEPARTMENT'S CONSTRUCTION REQUIREMENTS, STAFF NOTIFICATION REQUIREMENTS, REQUIRED
INSPECTIONS FOR CERTAIN STAGES OF THE WORK AND TO REVIEW THE AUTHORITY OF THE DEPARTMENT AS
IT RELATES TO WORK WITHIN THE EXISTING AND PROPOSED RIGHT-OF-WAY.
DESIGN DATA
EXISTING ZONING: PUD
ZONING OVERLAY: N/A
TOTAL ACREAGE: 1.32 ACRES
NET ACREAGE: 1.32 ACRES
LIMITS OF DISTURBANCE: 1.54 ACRES
BUILDING COVER RATIO: 19.4%
BUILDING SQUARE FOOTAGE: 11,200 SQUARE FEET
IMPERVIOUS COVER RATIO: 86%
SETBACKS: 10' FRONT, 5' BACK
W
S
N
E
CITY OF CARMEL PLANNING
ONE CIVIC SQUARE
CARMEL, IN 46032
ANGIE CONN / ALEXIA LOPEZ
TEL: 317/571-2417
CITY OF CARMEL ENGINEERING
ONE CIVIC SQUARE
CARMEL, IN 46032
JOHN THOMAS / ALEX JORDAN
TEL: 317/571-2441
CITY OF CARMEL BLDG SERVICES
ONE CIVIC SQUARE
CARMEL, IN 46032
JIM BLANCHARD
TEL: 317/571-2444
CITY OF CARMEL FIRE DEPARTMENT
TWO CIVIC SQUARE
CARMEL, INDIANA 46032
CHRIS ELLISON
TEL: 317/571-2600
CARMEL CITY UTILITIES
30 W MAIN ST, SUITE 220
CARMEL, INDIANA 46032
JOHN DUFFY
TEL: 317/571-2648
HAMILTON COUNTY SURVEYOR
ONE HAMILTON COUNTY SQUARE
SUITE 188
NOBLESVILLE, INDIANA 46060
TEL: 317/776-8495
HAMILTON COUNTY HIGHWAY DEPT
1700 SOUTH 10TH STREET
NOBLESVILLE, INDIANA 46060
TEL: 317/773-7770
HAMILTON COUNTY HEALTH DEPARTMENT
18030 FOUNDATION DR. SUITE A
NOBLESVILLE, INDIANA 46060
JASON LEMASTER
TEL: 317/776-8500
CLAY TOWNSHIP REGIONAL WASTE DISTRICT
10701 NORTH COLLEGE AVENUE, SUITE A
INDIANAPOLIS, IN 46280-1098
RYAN HARTMAN
TEL: 317/844-9200
DUKE ENERGY
100 SOUTH MILL CREEK RD.
NOBLESVILLE, INDIANA 46060
TEL: 317/776-5352
COMCAST
9750 E. 150th STREET
SUITE 1600
NOBLESVILLE, INDIANA 46060
TEL: 317/776-4495
VECTREN GAS
P.O. BOX 1700
NOBLESVILLE, INDIANA, 46060
TEL: 317/776-5573
AT&T
5858 NORTH COLLEGE
INDIANAPOLIS, INDIANA 46220
TEL: 317/252-5168
OPERATING AUTHORITIES
PLANS PREPARED BY
WEIHE ENGINEERS, INC.
10505 N. COLLEGE AVE.
INDIANAPOLIS, INDIANA 46280
TELEPHONE: (317) 846-6611
FAX: (317) 843-0546
CONTACT PERSON: RUSS WEBSTER, EIT
EMAIL: WEBSTERR@WEIHE.NET
CONSTRUCTION PLANS FOR
STUDIO M ARCHITECTURE
PLANS PREPARED FOR
STUDIO M ARCHITECTS
2 WEST MAIN STREET
CARMEL, IN 46032
TELEPHONE: (317) 810-1502
CONTACT PERSON: JOSH MAZUR, RA, LEEP AP
EMAIL: JMAZUR@STUDIOMARCHITECTURE.NET
PROJECT LOCATION
AREA MAP
I-465 I-46
5
106TH ST.
116TH ST.US-31KEYSTONE PARKWAY86TH ST.
96TH ST.
MAIN ST.TOWNE ROADREVISIONS AND ISSUESPart of SE/4, Section 26, Township 18 North, Range 3 East, Clay Township, Hamilton County, INW18.0605PREPARED FOR:SOUTHWEST CORNER OF GRAND & MAIN, CARMEL, INPROJECT NO.
SHEET NO.CHECKED BY:DRAWN BY:RLWDESIGNED BY:DWG NAME:PROJECT NO.:W18.0605DATEBYSSRDATE:RLWKnow what's below.
before you dig.Call
R APPROVAL PENDINGNOT FOR CONSTRUCTIONSHOPPES ON MAINSUBMITTED FOR TAC REVIEW10.20.2017RLWSTEVEN SCOTT RUCKER P.E. 11300279ENGINEERS317 | 846 - 6611800 | 452 - 6408317 | 843 - 0546 faxWEIHELand Surveying | Civil EngineeringLandscape ArchitectureALLAN H. WEIHE, P.E., L.S. - FOUNDER10505 N. College AvenueIndianapolis, Indiana 46280weihe.netBuild with confidence.SMPLANS REVISED FOR CARMEL TAC COMMENTS12.08.2017RLWPLANS REVISED FOR REVIEW COMMENTS01.23.2018RLW04.08.2019PLANS REVISED FOR REVIEW COMMENTS02.12.2018RLWPLANS UPDATED FOR STUDIO M ARCHITECTS04.08.2019RLWSheet List Table
Sheet Number Sheet Title
C001 TITLE SHEET
C100 STORMWATER POLLUTION PREVENTION PLAN PHASE 1
C101 STORMWATER POLLUTION PREVENTION PLAN PHASE 2
C102 SWPPP SPECIFICATIONS
C103 SWPPP DETAILS
C200 SITE PLAN
C201 SITE DETAILS
C202 SITE DETAILS
C300 GRADING PLAN
C400 MAINTENANCE OF TRAFFIC PLAN
C600 DRAINAGE PLAN
C601 STORM SEWER PLAN AND PROFILE
C602 STORM SEWER DETAILS
C603 OVERFLOW ROUTING
C800 UTILITY PLAN
C801 UTILITY DETAILS
C900 PROJECT SPECIFICATIONS
C901 PROJECT SPECIFICATIONS
L100 LANDSCAPE PLAN
L101 LANDSCAPE DETAILS
SHOPPES ON MAIN