Loading...
HomeMy WebLinkAboutCivil Plans 4.8.19 10PROPOSED BUILDING GFA=11,350 FFE=871.20 VIRGINIA BOULEVARDROAD WORK 500 FT POSTED SPEED LIMIT 35 END ROAD WORK C400MAINTENANCE OF TRAFFIC PLANw180605-C400 MOTELECTRICAL RISER GUY ANCHOR ELECTRIC JUNCTION BOX ORNAMENTAL LIGHT GENERATOR STREET LIGHT ELECTRIC MANHOLE ELECTRIC OUTLET UTILITY POLE UTILITY POLE W/ TRANSFORMER TRANSFORMER COMMUNICATIONS JUNCTION BOX COMMUNICATIONS MANHOLE COMMUNICATIONS PEDESTAL RIGHT OF WAY LINE FENCE GUARD RAIL BUILDING SETBACK LINE BOUNDARY LINE FIRE DEPT HOOKUP FIRE HYDRANT POST INDICATOR VALVE CHILLED WATER MANHOLE WATER MANHOLE SPRINKLER CONTROL BOX SPRINKLER CONTROL VALVE SPRINKLER SPIGOT WELL HEAD WATER METER WATER VALVE GAS METER GAS VALVE ELECTRIC METER TRAFFIC SIGNAL POLE TRAFFIC SIGNAL DOWN SPOUT COMMUNICATIONS RISER STORM CLEANOUT BEEHIVE INLET CURB INLET FLOOR DRAIN ROUND INLET SQUARE INLET STORM MANHOLE SANITARY SEWER CLEANOUT LIFT STATION SANITARY SEWER MANHOLE SANITARY STUB MARKER PARKING LOT LIGHT (1 HEAD) PARKING LOT LIGHT (3 HEAD) PARKING LOT LIGHT (4 HEAD) PARKING LOT LIGHT (2 HEAD) ROW RIGHT OF WAY BSL BUILDING SETBACK LINE ESMT EASEMENT D.&U.E.DRAINAGE AND UTILITY EASEMENT FFE FINISH FLOOR ELEVATION SITE PLAN LEGEND UTILITIES ABBREVIATIONS LINE TYPES SECTION LINE MAINTENANCE OF TRAFFIC PLAN LEGEND DRUM TYPE BARRICADES (ACCORDING TO LOCAL D.O.T. SPEC) SPACED AS NOTED. ADVANCED WARNING SIGN WORK AREA FLAGGER OPTIONAL PLAQUE SPEED LIMIT SIGN NARRATIVE IN ORDER TO INSTALL THE PROPOSED CURB-CUT, THE RIGHT-HAND LANE OF THE EAST-BOUND SIDE OF MAIN STREET WILL BE CLOSED FOR ONLY AS LONG AS IT IS REQUIRED TO CONSTRUCT SAID ENTRANCE. THE CONTRACTOR WILL COORDINATE THIS LANE CLOSURE WITH THE CITY OF CARMEL AHEAD OF TIME. MAINTENANCE OF TRAFFIC NOTES 1.DURING THE COURSE OF CONSTRUCTION, ONE LANE REDUCTION WILL BE ALLOWED BETWEEN THE HOURS OF 9am. AND 4pm. CONSTRUCTION MUST BE COMPLETE WITHIN THE PROVISIONS OF THE PERMIT AND THE LANE MUST BE REOPENED AT THE END OF EACH DAY THAT IT IS CLOSED. 2.THE BARRICADES SHALL BE MOVED TO THE EDGE OF PAVEMENT AT TIMES OF NO CONSTRUCTION TO ALLOW FOR UNOBSTRUCTED TRAFFIC FLOW THROUGH THE CONSTRUCTION AREA. MAINTAIN MINIMUM 10' LANE WIDTH BETWEEN BARRICADES AND ADJACENT LANE STRIPING. 3.FENCING, BARRICADES AND/OR APPROPRIATELY SIZED STEEL PLATES SHALL BE PLACED SO AS TO ENCOMPASS ANY EXPOSED TRENCH AREA AT TIMES OF NO CONSTRUCTION. 4.THE ADVANCED WARNING SIGNS SHALL ALSO BE COVERED OR TURNED AWAY FROM THE ROADWAY AT TIMES OF NO CONSTRUCTION. 5.THE MAINTENANCE OF TRAFFIC SHALL CONFORM TO THE STANDARD SPECIFICATIONS OF THE INDIANA DEPARTMENT OF TRANSPORTATION STANDARD DETOUR SHEETS AND THE INDIANA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS DATED 2011 AND ALL SUBSEQUENT REVISIONS. 6.ANY DROP OFF ADJACENT TO THE TRAVEL LANE WHICH EXCEEDS 4" MUST HAVE TYPE II DRUMS WITH TYPE 'A' FLASHERS SPACED AS NOTED. 7.ALL STAGING AND EQUIPMENT STORAGE WILL OCCUR OFF ROAD AND ON THE WORK SITE. 8.THE APPROVED PERMIT AND PLANS SHALL BE ONSITE DURING CONSTRUCTION. 9.ALL PAVEMENT MARKINGS WITHIN INDOT AND/OR CITY/COUNTY RIGHT-OF-WAY TO BE IN ACCORDANCE WITH THE INDIANA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS DATED 2011 AND ALL SUBSEQUENT REVISIONS. 10.CONTRACTOR TO NOTIFY AUTHORITY HAVING JURISDICTION 5 DAYS PRIOR TO THE START OF WORK AND WITHIN 7 DAYS OF COMPLETION OF WORK. W S N E REVISIONS AND ISSUESPart of SE/4, Section 26, Township 18 North, Range 3 East, Clay Township, Hamilton County, INW18.0605PREPARED FOR:SOUTHWEST CORNER OF GRAND & MAIN, CARMEL, INPROJECT NO. SHEET NO.CHECKED BY:DRAWN BY:RLWDESIGNED BY:DWG NAME:PROJECT NO.:W18.0605DATEBYSSRDATE:RLWKnow what's below. before you dig.Call R APPROVAL PENDINGNOT FOR CONSTRUCTIONSHOPPES ON MAINSUBMITTED FOR TAC REVIEW10.20.2017RLWSTEVEN SCOTT RUCKER P.E. 11300279ENGINEERS317 | 846 - 6611800 | 452 - 6408317 | 843 - 0546 faxWEIHELand Surveying | Civil EngineeringLandscape ArchitectureALLAN H. WEIHE, P.E., L.S. - FOUNDER10505 N. College AvenueIndianapolis, Indiana 46280weihe.netBuild with confidence.SMPLANS REVISED FOR CARMEL TAC COMMENTS12.08.2017RLWPLANS REVISED FOR REVIEW COMMENTS01.23.2018RLW04.08.2019PLANS REVISED FOR REVIEW COMMENTS02.12.2018RLWPLANS UPDATED FOR STUDIO M ARCHITECTS04.08.2019RLW