HomeMy WebLinkAboutCivil Plans 4.8.19 10PROPOSED BUILDING
GFA=11,350
FFE=871.20
VIRGINIA BOULEVARDROAD
WORK
500 FT
POSTED
SPEED
LIMIT
35
END
ROAD WORK
C400MAINTENANCE OF TRAFFIC PLANw180605-C400 MOTELECTRICAL RISER
GUY ANCHOR
ELECTRIC JUNCTION BOX
ORNAMENTAL LIGHT
GENERATOR
STREET LIGHT
ELECTRIC MANHOLE
ELECTRIC OUTLET
UTILITY POLE
UTILITY POLE W/ TRANSFORMER
TRANSFORMER
COMMUNICATIONS JUNCTION BOX
COMMUNICATIONS MANHOLE
COMMUNICATIONS PEDESTAL
RIGHT OF WAY LINE
FENCE
GUARD RAIL
BUILDING SETBACK LINE
BOUNDARY LINE
FIRE DEPT HOOKUP
FIRE HYDRANT
POST INDICATOR VALVE
CHILLED WATER MANHOLE
WATER MANHOLE
SPRINKLER CONTROL BOX
SPRINKLER CONTROL VALVE
SPRINKLER
SPIGOT
WELL HEAD
WATER METER
WATER VALVE
GAS METER
GAS VALVE
ELECTRIC METER
TRAFFIC SIGNAL POLE
TRAFFIC SIGNAL
DOWN SPOUT
COMMUNICATIONS RISER
STORM CLEANOUT
BEEHIVE INLET
CURB INLET
FLOOR DRAIN
ROUND INLET
SQUARE INLET
STORM MANHOLE
SANITARY SEWER CLEANOUT
LIFT STATION
SANITARY SEWER MANHOLE
SANITARY STUB MARKER
PARKING LOT LIGHT (1 HEAD)
PARKING LOT LIGHT (3 HEAD)
PARKING LOT LIGHT (4 HEAD)
PARKING LOT LIGHT (2 HEAD)
ROW RIGHT OF WAY
BSL BUILDING SETBACK LINE
ESMT EASEMENT
D.&U.E.DRAINAGE AND UTILITY EASEMENT
FFE FINISH FLOOR ELEVATION
SITE PLAN LEGEND
UTILITIES
ABBREVIATIONS
LINE TYPES
SECTION LINE
MAINTENANCE OF TRAFFIC PLAN LEGEND
DRUM TYPE BARRICADES (ACCORDING TO
LOCAL D.O.T. SPEC) SPACED AS NOTED.
ADVANCED WARNING SIGN
WORK AREA
FLAGGER
OPTIONAL PLAQUE
SPEED LIMIT SIGN
NARRATIVE
IN ORDER TO INSTALL THE PROPOSED CURB-CUT, THE RIGHT-HAND LANE OF THE
EAST-BOUND SIDE OF MAIN STREET WILL BE CLOSED FOR ONLY AS LONG AS IT IS
REQUIRED TO CONSTRUCT SAID ENTRANCE. THE CONTRACTOR WILL COORDINATE THIS
LANE CLOSURE WITH THE CITY OF CARMEL AHEAD OF TIME.
MAINTENANCE OF TRAFFIC NOTES
1.DURING THE COURSE OF CONSTRUCTION, ONE LANE REDUCTION WILL BE ALLOWED
BETWEEN THE HOURS OF 9am. AND 4pm. CONSTRUCTION MUST BE COMPLETE WITHIN
THE PROVISIONS OF THE PERMIT AND THE LANE MUST BE REOPENED AT THE END OF
EACH DAY THAT IT IS CLOSED.
2.THE BARRICADES SHALL BE MOVED TO THE EDGE OF PAVEMENT AT TIMES OF NO
CONSTRUCTION TO ALLOW FOR UNOBSTRUCTED TRAFFIC FLOW THROUGH THE
CONSTRUCTION AREA. MAINTAIN MINIMUM 10' LANE WIDTH BETWEEN BARRICADES
AND ADJACENT LANE STRIPING.
3.FENCING, BARRICADES AND/OR APPROPRIATELY SIZED STEEL PLATES SHALL BE
PLACED SO AS TO ENCOMPASS ANY EXPOSED TRENCH AREA AT TIMES OF NO
CONSTRUCTION.
4.THE ADVANCED WARNING SIGNS SHALL ALSO BE COVERED OR TURNED AWAY FROM
THE ROADWAY AT TIMES OF NO CONSTRUCTION.
5.THE MAINTENANCE OF TRAFFIC SHALL CONFORM TO THE STANDARD SPECIFICATIONS
OF THE INDIANA DEPARTMENT OF TRANSPORTATION STANDARD DETOUR SHEETS AND
THE INDIANA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND
HIGHWAYS DATED 2011 AND ALL SUBSEQUENT REVISIONS.
6.ANY DROP OFF ADJACENT TO THE TRAVEL LANE WHICH EXCEEDS 4" MUST HAVE TYPE
II DRUMS WITH TYPE 'A' FLASHERS SPACED AS NOTED.
7.ALL STAGING AND EQUIPMENT STORAGE WILL OCCUR OFF ROAD AND ON THE WORK
SITE.
8.THE APPROVED PERMIT AND PLANS SHALL BE ONSITE DURING CONSTRUCTION.
9.ALL PAVEMENT MARKINGS WITHIN INDOT AND/OR CITY/COUNTY RIGHT-OF-WAY TO BE
IN ACCORDANCE WITH THE INDIANA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES
FOR STREETS AND HIGHWAYS DATED 2011 AND ALL SUBSEQUENT REVISIONS.
10.CONTRACTOR TO NOTIFY AUTHORITY HAVING JURISDICTION 5 DAYS PRIOR TO THE
START OF WORK AND WITHIN 7 DAYS OF COMPLETION OF WORK.
W
S
N
E REVISIONS AND ISSUESPart of SE/4, Section 26, Township 18 North, Range 3 East, Clay Township, Hamilton County, INW18.0605PREPARED FOR:SOUTHWEST CORNER OF GRAND & MAIN, CARMEL, INPROJECT NO.
SHEET NO.CHECKED BY:DRAWN BY:RLWDESIGNED BY:DWG NAME:PROJECT NO.:W18.0605DATEBYSSRDATE:RLWKnow what's below.
before you dig.Call
R APPROVAL PENDINGNOT FOR CONSTRUCTIONSHOPPES ON MAINSUBMITTED FOR TAC REVIEW10.20.2017RLWSTEVEN SCOTT RUCKER P.E. 11300279ENGINEERS317 | 846 - 6611800 | 452 - 6408317 | 843 - 0546 faxWEIHELand Surveying | Civil EngineeringLandscape ArchitectureALLAN H. WEIHE, P.E., L.S. - FOUNDER10505 N. College AvenueIndianapolis, Indiana 46280weihe.netBuild with confidence.SMPLANS REVISED FOR CARMEL TAC COMMENTS12.08.2017RLWPLANS REVISED FOR REVIEW COMMENTS01.23.2018RLW04.08.2019PLANS REVISED FOR REVIEW COMMENTS02.12.2018RLWPLANS UPDATED FOR STUDIO M ARCHITECTS04.08.2019RLW