HomeMy WebLinkAboutCivil Plans 4.8.19 5SEDIMENTATION/SILT FENCE
MAXIMUM LOAD SLOPE AND DISTANCE FOR
WHICH A SILT FENCE IS APPLICABLE
INSTALLATION
PREFABRICATED SILT FENCE
1. LAY OUT THE LOCATION OF THE FENCE SO THAT IT IS PARALLEL TO THE CONTOUR OF THE SLOPE AND AT LEAST 10 FEET BEYOND THE TOE OF THE SLOPE TO PROVIDE A SEDIMENT
STORAGE AREA. TURN THE ENDS OF THE FENCE UP SLOPE SUCH THAT THE POINT OF CONTACT BETWEEN THE GROUND AND THE BOTTOM OF THE FENCE END TERMINATES AT A HIGHER
ELEVATION THAN THE TOP OF THE FENCE AT ITS LOWEST POINT.
2. EXCAVATE AN EIGHT-INCH DEEP BY FOUR-INCH WIDE TRENCH ALONG THE ENTIRE LENGTH OF THE FENCE LINE. INSTALLATION BY PLOWING IS ALSO ACCEPTABLE.
3. INSTALL THE SILT FENCE WITH THE FILTER FABRIC LOCATED ON THE UP-SLOPE SIDE OF THE EXCAVATED TRENCH AND THE SUPPORT POSTS ON THE DOWN-SLOPE SIDE OF THE TRENCH.
4. DRIVE THE SUPPORT POSTS AT LEAST 18 INCHES INTO THE GROUND, TIGHTLY STRETCHING THE FABRIC BETWEEN THE POSTS AS EACH IS DRIVEN INTO THE SOIL. MINIMUM OF 12 INCHES
OF THE FILTER FABRIC SHOULD EXTEND INTO THE TRENCH.
5. LAY THE LOWER FOUR INCHES OF FILTER FABRIC ON THE BOTTOM OF THE TRENCH AND EXTEND IT TOWARD THE UP-SLOPE SIDE OF THE TRENCH.
6. BACKFILL THE TRENCH WITH SOIL MATERIAL AND COMPACT IT IN PLACE.
NOTE: IF THE SILT FENCE IS BEING CONSTRUCTED ON-SITE, ATTACH THE FILTER FABRIC TO THE SUPPORT POSTS AND ATTACH WOODEN LATHE TO SECURE THE FABRIC TO THE POSTS.
ALLOW FOR AT LEAST 12 INCHES OF FABRIC BELOW GROUND LEVEL. COMPLETE THE SILT FENCE INSTALLATION, FOLLOWING STEPS 1 THROUGH 6 ABOVE.
MAINTENANCE
_ INSPECT WITHIN 24 HOURS OF A RAIN EVENT AND AT LEAST ONCE EVERY SEVEN CALENDAR DAYS.
_ IF FENCE FABRIC TEARS, STARTS TO DECOMPOSE, OR IN ANY WAY BECOMES INEFFECTIVE, REPLACE THE AFFECTED PORTION IMMEDIATELY. NOTE: ALL REPAIRS SHOULD MEET
SPECIFICATIONS AS OUTLINED WITHIN THIS MEASURE.
_ REMOVE DEPOSITED SEDIMENT WHEN IT IS CAUSING THE FILTER FABRIC TO BULGE OR WHEN IT REACHES ONE-HALF THE HEIGHT OF THE FENCE AT ITS LOWEST POINT. WHEN
CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE FENCE AND SEDIMENT DEPOSITS, GRADE THE SITE TO BLEND WITH THE SURROUNDING AREA, AND STABILIZE.
REFERENCE IN CHAPTER 7 PAGES 215-221 IN THE INDIANA STORM WATER QUALITY MANUAL
2-WOOD POST/STAKES WRAPPED
WITH SILT FENCE AND ROTATED AT
LEAST ONE FULL TURN TO SECURE
SILT FENCE END IN PLACE
SILT FENCE
SILT FENCE
POST
TO JOIN TO
ENDS OF TWO
FENCES.
EMBEDDED SILT FENCE MATERIAL MIN. 8"
INTO GROUND W/ 4" LAID ALONG BOTTOM OF
TRENCH. SOIL SLICING IN ACCORDANCE
WITH ASTM D 6462 8.2.2 IS ALSO
ACCEPTABLE.
GEOTEXTILE FABRIC LAID ON
DOWN SLOPE SIDE AND
BOTTOM OF TRENCH
8"X4" TRENCH TO BE BACKFILLED
AND COMPACTED
WOVEN FILTER FABRIC SILT
FENCE MATERIAL COVER
POST 2"X2" WOOD OR 1.33
LBS/FOOT STEEL 6' MAX.
SPACING
EMBEDDED SILT FENCE MATERIAL MIN. 8"
INTO GROUND W/ 4" LAID ALONG BOTTOM OF
TRENCH. SOIL SLICING IN ACCORDANCE WITH
ASTM D 6462 8.2.2 IS ALSO ACCEPTABLE.
GEOTEXTILE FABRIC LAID
ON DOWN SLOPE SIDE AND
BOTTOM OF TRENCH
POST 2"X2" WOOD OR 1.33 LBS/FOOT
STEEL 8' MAX. SPACING
WIRE FENCE 14 GUAGE (MIN)-6" MESH
REQ'D. IN SWALES OR AREAS OF
CONCENTRATED FLOW
NONWOVEN FILTER FABRIC -
SECURE TO POSTS WITH 2" LATH
2-WOOD POST/STAKES WRAPPED
WITH SILT FENCE AND ROTATED
AT LEAST TWO FULL TURNS TO
PROVIDE A SECURE CONNECTION
INSTALLATION
1.REMOVE ALL VEGETATION AND OTHER OBJECTIONABLE MATERIAL FROM THE FOUNDATION AREA.
2.GRADE THE FOUNDATION AND CROWN FOR POSITIVE DRAINAGE.
3.INSTALL A CULVERT PIPE UNDER THE PAD IF NEEDED TO MAINTAIN PROPER PUBLIC ROAD DRAINAGE.
4.IF WET CONDITIONS ARE ANTICIPATED, PLACE GEOTEXTILE FABRIC ON THE GRADED FOUNDATION TO
IMPROVE STABILITY.
5.PLACE AGGREGATE (INDOT CA NO. 2) TO THE DIMENSIONS AND GRADE SHOWN IN THE CONSTRUCTION
PLANS, LEAVING THE SURFACE SMOOTH AND SLOPED FOR DRAINAGE.
6.TOP-DRESS THE DRIVE WITH WASHED AGGREGATE (INDOT CA NO.2).
7.WHERE POSSIBLE, DIVERT ALL STORM WATER RUNOFF AND DRAINAGE FROM THE TEMPORARY
CONSTRUCTION INGRESS/EGRESS PAD TO A SEDIMENT TRAP OR BASIN.
MAINTENANCE
_ INSPECT DAILY.
_ RESHAPE PAD AS NEEDED FOR DRAINAGE AND RUNOFF CONTROL.
_ TOP-DRESS WITH CLEAN AGGREGATE AS NEEDED.
_ IMMEDIATELY REMOVE MUD AND SEDIMENT TRACKED OR WASHED ONTO PUBLIC ROADS.
_ FLUSHING SHOULD ONLY BE USED IF THE WATER FROM THE CONSTRUCTION DRIVE CAN BE CONVEYED
INTO A SEDIMENT TRAP OR BASIN.
REFERENCED IN CHAPTER 7 PAGE 22 AND 23 IN INDIANA STORM WATER QUALITY MANUAL.
WIDTH:
(A) - 20' MINIMUM OR FULL WIDTH
OF ENTRANCE/EXIT DRIVE,
WHICHEVER IS GREATER.
WOOD OR METAL
STAKES TO SECURE
THE STRAW BALES
(TWO PER BALE)
10 MIL. PLASTIC LINING
STRAW BALE (TYP)
SECTION LINE
STRAW BALE (TYP)
BINDING WIRE
WOOD OR METAL
STAKES (TYP) - 2 PER
BALENATIVE MATERIAL (OPTIONAL)
POLYETHYLENE LINING 10
MIL. EXTENDING OVER
BALES
(NO SCALE)TYPE "ABOVE GRADE
W/ STRAW BALES"4"WOOD OR METAL
STAKES TO SECURE
THE STRAW BALES
(TWO PER BALE)
POLYETHYLENE LINING 10
MIL. EXTENDING OVER
BALES
METAL PINS OR STAPLES
TO SECURE THE
POLYETHYLENE LINING TO
THE STRAW BALES
METAL PINS OR STAPLES
TO SECURE THE
POLYETHYLENE LINING
TO THE STRAW BALES
CONCRETE
WASHOUT
WOOD POST 3"x3"x8'
BLACK LETTER 6" HEIGHT
3/8" TREATED
PLYWOOD 48"x24"
PAINTED WHITE
0.5" LAG SCREWS
INSTALLATION
1.UTILIZE AND FOLLOW THE DESIGN IN THE STORM WATER POLLUTION PREVENTION PLAN TO
INSTALL THE SYSTEM.
2.DEPENDENT UPON THE TYPE OF SYSTEM, EITHER EXCAVATE THE PIT OR INSTALL THE
CONTAINMENT SYSTEM.
3.A BASE SHALL BE CONSTRUCTED AND PREPARED THAT IS FREE OF ROCKS AND OTHER DEBRIS
THAT MAY CAUSE TEARS OR PUNCTURES IN THE POLYETHYLENE LINING.
4.INSTALL THE POLYETHYLENE LINING. FOR EXCAVATED SYSTEMS, THE LINING SHOULD EXTEND
OVER THE ENTIRE EXCAVATION. THE LINING FOR BERMED SYSTEMS SHOULD BE INSTALLED OVER
THE POOLING AREA WITH ENOUGH MATERIAL TO EXTEND THE LINING OVER THE BERM OR
CONTAINMENT SYSTEM. THE LINING SHOULD BE SECURED WITH PINS, STAPLES, OR OTHER
FASTENERS.
5.PLACE FLAGS, SAFETY FENCING, OR EQUIVALENT TO PROVIDE A BARRIER TO CONSTRUCTION
EQUIPMENT AND OTHER TRAFFIC.
6.PLACE A NON-COLLAPSING, NON-WATER HOLDING COVER OVER THE WASHOUT FACILITY PRIOR TO
A PREDICTED RAINFALL EVENT TO PREVENT ACCUMULATION OF WATER AND POSSIBLE
OVERFLOW OF THE SYSTEM (OPTIONAL).
7.INSTALL SIGNAGE THAT IDENTIFIES CONCRETE WASHOUT AREAS.
8.POST SIGNS DIRECTING CONTRACTORS AND SUPPLIERS TO DESIGNATED LOCATIONS.
9.WHERE NECESSARY, PROVIDE STABLE INGRESS AND EGRESS (SEE TEMPORARY CONSTRUCTION
INGRESS/EGRESS PAD ON PAGE 17) OR ALTERNATIVE APPROACH PAD FOR CONCRETE WASHOUT
SYSTEMS.
10.USE A 10 MIL. POLYETHYLENE LINED DUMPSTER AS AN ALTERNATE.
COIR LOG (FIBER ROLL)
C103SWPPP DETAILSw180605-C103 swppp det3'3'PLAN
1.ACTUAL LAYOUT DETERMINED IN
FIELD.
2.THE CONCRETE WASHOUT SIGN
SHALL BE INSTALLED WITHIN
30FT. OF THE TEMP. CONCRETE
WASHOUT FACILITY.
SECTION
CONCRETE WASHOUT8"8"8"X4" TRENCH TO BE
BACKFILLED AND COMPACTED
POSTS: STEEL T OR U TYPE, OR 2"X2" HARD WOOD POST
FENCE: WOVEN WIRE, 14-1/2 GA., 6" MAX. MESH OPENING
FABRIC: IN ACCORDANCE WITH ASTM D 6461 LATEST EDITION.
LOAD SLOPE
LESS THAN 2%
2 TO 5%
5 TO 10%
10 TO 20%
MORE THAN 20%
MAX. DISTANCE ABOVE FENCE
100 FT.
75 FT.
50 FT.
25 FT.
15 FT.
TEMPORARY CONSTRUCTION INGRESS/EGRESS PAD
WITHOUT WIRE SUPPORT WITH WIRE SUPPORT
SMALL SITES - LESS THAN TWO ACRES (NO SCALE)
GEOTEXTILE FABRIC UNDERLINER
#2 STONE AGGREGATE
PUB
LI
C
R
O
A
D
#2 STO
N
E
A
G
G
R
E
G
A
T
E
(
O
P
T
I
O
N
A
L
)
2"-3"(MIN.) (OPTIONAL)
50' (MIN.
)
(NO SCALE)
FLOW
FINISH GRADE
UNDISTURBED
GROUND
FLOW
FINISH GRADE
UNDISTURBED
GROUND
6" (MIN.)
NOTES:
1.THE SWPPP INFORMATION SIGN
MUST BE LOCATED NEAR THE
CONSTRUCTION EXIT OF THE
SITE, SUCH THAT IT IS
ACCESSIBLE AND VIEWABLE BY
THE GENERAL PUBLIC, BUT NOT
OBSTRUCTING VIEWS AS TO
CAUSE A SAFETY HAZARD.
2.ALL POSTED DOCUMENTS MUST
BE MAINTAINED IN A CLEARLY
READABLE CONDITION AT ALL
TIMES THROUGHOUT
CONSTRUCTION AND UNTIL THE
NOTICE-OF-TERMINATION (NOT)
IS FILED FOR THE PERMIT.
3.CONTRACTOR SHALL POST
OTHER STORM WATER AND/OR
EROSION AND SEDIMENT
CONTROL RELATED PERMITS ON
THE SIGN AS REQUIRED BY THE
GOVERNING AGENCY.
4.SIGN SHALL BE LOCATED
OUTSIDE OF PUBLIC
RIGHT-OF-WAY AND EASEMENTS
UNLESS APPROVED BY THE
GOVERNING AGENCY.
5.CONTRACTOR IS RESPONSIBLE
FOR ENSURING STABILITY OF
THE SWPPP INFORMATION SIGN.
SWPPP INFORMATION SIGN
COPY
OF
NOI
COPY OF
IDEM
NOTICE OF
SUFFICIENCY
SWPPP INFORMATION
DETAILED DESCRIPTION OF THE LOCATION OF THE
SWPPP DOCUMENTATION (BINDER AND SITE MAPS)
ON THE SITE.
SIGN TO BE CONSTRUCTED OF A
RIGID MATERIAL, SUCH AS
PLYWOOD OR OUTDOOR SIGN
BOARD. SIGN MUST BE
CONSTRUCTED IN A MANNER TO
PROTECT DOCUMENTS FROM
DAMAGE DUE TO WEATHER (WIND,
SUN, MOISTURE, ETC.).
"SWPPP INFORMATION" MUST BE
DISPLAYED PROMINENTLY ACROSS
THE TOP OF THE SIGN, AS SHOWN IN
THE DETAIL.3" MIN.3" MIN.COPY
OF
DRAINAGE
APPROVAL
LETTER
COPY
OF
CONSTRUCTION
SITE
NOTICE AS
APPLICABLE
COPY
OF
CONSTRUCTION
SITE
NOTICE AS
APPLICABLE
COPY
OF
CONSTRUCTION
SITE
NOTICE AS
APPLICABLE
(NO SCALE)
ALTERNATE
CONTRACTOR MAY USE A 10 MIL. POLYETHYLENE LINED DUMPSTER FOR CONCRETE WASHOUT.
SHEET 1 OF 1
DRAWN
CHECKED
QA
MFG
APPROVED
DWG NOSIZE
SCALE
REV
REPLACEABLE SEDIMENT BAGS
WITH GEOTEXTILE FILTER FABRIC
LIFT HANDLES
STAINLESS
STEEL
CLAMPING
BAND
REAR CURB GUARD FLAP
WITH MAGNETIC TIE-DOWNS
ALL PRODUCTS MANUFACTURED
BY INLET & PIPE PROTECTION, INC
DISTRIBUTED BY ADS
WWW.INLETFILTERS.COM
(866) 287-8655 PH
(630) 355-3477 FX
INFO@INLETFILTERS.COM
INSTALLATION:
1.
2.
REMOVE GRATE
DROP FLEXSTORM INLET FILTER ONTO
LOAD BEARING LIP OF CASTING OR
CONCRETE STRUCTURE
3.REPLACE GRATE
STANDARD 2"
OVERFLOW
AREA 11 GAUGE STEEL SUSPENSION SYSTEM
IPP TEMPORARY SEED
TABLE 1. TEMPORARY SEEDING SPECIFICATIONS
AUG. 1 - SEPT. 1
GERMAN MILLET
WHEAT OR RYE 150 LBS. 1 TO 1½ INCHES SEPT. 15 - OCT. 30
SPRING OATS 100 LBS. 1 INCH MARCH 1 - APRIL 15
ANNUAL RYEGRASS 40 LBS.¼ INCH MARCH 1 - MAY 1
40 LBS.1 TO 2 INCHES MAY 1 - JUNE 1
SUDANGRASS 35 LBS.MAY 1 - JULY 30
BUCKWHEAT 60 LBS. APRIL 15 - JUNE 1
CORN (BROADCAST)300 LBS.MAY 11 - AUG. 10
SORGHUM 35 LBS.MAY 1 - JULY 15
1 TO 2 INCHES
1 TO 2 INCHES
1 TO 2 INCHES
1 TO 2 INCHES
1. PERENNIAL SPECIES MAY BE USED AS A TEMPORARY COVER, ESPECIALLY IF THE AREA TO BE
SEEDED WILL REMAIN IDLE FOR MORE THAN ONE YEAR.
2. SEEDING DONE OUTSIDE THE OPTIMUM SEEDING DATES INCREASES THE CHANCES OF SEEDING FAILURE. DATES
MAY BE EXTENDED OR SHORTENED BASED ON THE LOCATION OF THE PROJECT
SITE WITHIN THE STATE.
NOTES
1. MULCH ALONE IS AN ACCEPTABLE TEMPORARY COVER AND MAY BE USED IN LIEU OF TEMPORARY SEEDING, PROVIDED THAT IT IS
APPROPRIATELY ANCHORED.
2. A HIGH POTENTIAL FOR FERTILIZER, SEED, AND MULCH TO WASH EXISTS ON STEEP BANKS, CUTS, AND IN CHANNELS AND AREAS
OF CONCENTRATED FLOW.
SEEDBED PREPARATION
1. TEST SOIL TO DETERMINE PH AND NUTRIENT LEVELS.
2. APPLY SOIL AMENDMENTS AS RECOMMENDED BY THE SOIL TEST. IF TESTING IS NOT DONE, APPLY 400 TO 600 POUNDS PER ACRE
OF 12-12-12 ANALYSIS FERTILIZER, OR EQUIVALENT.
3. WORK THE SOIL AMENDMENTS INTO THE UPPER TWO TO FOUR INCHES OF THE SOIL WITH
A DISK OR RAKE OPERATED ACROSS THE SLOPE.
SEEDING
1. SELECT A SEED SPECIES OR AN APPROPRIATE SEED MIXTURE AND APPLICATION RATE FROM TABLE 1.
2. APPLY SEED UNIFORMLY WITH A DRILL OR CULTIPACKER SEEDER OR BY BROADCASTING. PLANT OR COVER SEED TO THE DEPTH
SHOWN IN TABLE 1.
NOTES
1. IF DRILLING OR BROADCASTING THE SEED, ENSURE GOOD SEED-TO-SOIL CONTACT BY FIRMING THE SEEDBED WITH A ROLLER OR
CULTIPACKER AFTER COMPLETING SEEDING OPERATIONS.
2. DAILY SEEDING WHEN THE SOIL IS MOIST IS USUALLY MOST EFFECTIVE.
3. IF SEEDING IS DONE WITH A HYDROSEEDER, FERTILIZER AND MULCH CAN BE APPLIED WITH THE SEED IN A SLURRY MIXTURE.
3. APPLY MULCH AND ANCHOR IT IN PLACE.
MAINTENANCE
1.INSPECT WITHIN 24 HOURS OF EACH RAIN EVENT AND AT LEAST ONCE EVERY SEVEN CALENDAR DAYS.
2. CHECK FOR EROSION OR MOVEMENT OF MULCH AND REPAIR IMMEDIATELY.
3. MONITOR FOR EROSION DAMAGE AND ADEQUATE COVER (80 PERCENT DENSITY); RESEED, FERTILIZE, AND APPLY 4. MULCH
WHERE NECESSARY.
4. IF NITROGEN DEFICIENCY IS APPARENT, TOP-DRESS FALL SEEDED WHEAT OR RYE SEEDING WITH 50 POUNDS PER ACRE OF
NITROGEN IN FEBRUARY OR MARCH.
REFERENCE IN CHAPTER 7 PAGES 31-33 IN THE INDIANA STORM WATER QUALITY MANUAL
TEMPORARY SEED
TABLE 1. TEMPORARY SEEDING SPECIFICATIONS
SEED SPECIES1 RATE PER ACRE PLANTING DEPTH OPTIMUM DATES2
2"x2"x36" HARDWOOD
STAKES (TYP.) @ 10.0' O.C.
12" MIN. DEEP FROM GRADE
12" FILTREXX
SILTSOXX PER
MANUFACTURER'S
SPECIFICATIONS OR
APPROVED EQUAL
EXISTING
GRADE
MAINTENANCE
1.INSPECT DAILY AND AFTER EACH STORM EVENT FOR LEAKS, SPILLS, TRACKING OF SOIL BY EQUIPMENT, AND THE
POLYETHYLENE LINING FOR FAILURE.
2.ONCE CONCRETE WASTES HARDEN, REMOVE AND DISPOSE OF THE MATERIAL. EXCESS CONCRETE SHOULD BE REMOVED
WHEN THE WASHOUT SYSTEM REACHES 50 PERCENT OF THE DESIGN CAPACITY AND SHOULD NOT BE USED UNTIL
PROPERLY CLEANED OUT.
3.PLASTIC LINER SHOULD BE REPLACED AFTER EVERY CLEANING, THE REMOVAL OF MATERIAL USUALLY DAMAGES IT.
4.REPAIR OR ENLARGE AS NECESSARY TO MAINTAIN CAPACITY FOR CONCRETE WASTE.
5.IF LIQUIDS DO NOT EVAPORATE IT MAY BE NECESSARY TO VACUUM OR REMOVE THE LIQUIDS AND DISPOSE OF THEM IN
AN ACCEPTABLE METHOD.
6.WHEN CONCRETE WASHOUT SYSTEMS ARE NO LONGER REQUIRED THEY SHALL BE CLOSED AND HOLES, DEPRESSIONS
AND OTHER DISTURBANCES ASSOCIATED WITH THE SYSTEM SHOULD BE BACKFILLED, GRADED, AND STABILIZED.REVISIONS AND ISSUESPart of SE/4, Section 26, Township 18 North, Range 3 East, Clay Township, Hamilton County, INW18.0605PREPARED FOR:SOUTHWEST CORNER OF GRAND & MAIN, CARMEL, INPROJECT NO.
SHEET NO.CHECKED BY:DRAWN BY:RLWDESIGNED BY:DWG NAME:PROJECT NO.:W18.0605DATEBYSSRDATE:RLWKnow what's below.
before you dig.Call
R APPROVAL PENDINGNOT FOR CONSTRUCTIONSHOPPES ON MAINSUBMITTED FOR TAC REVIEW10.20.2017RLWSTEVEN SCOTT RUCKER P.E. 11300279ENGINEERS317 | 846 - 6611800 | 452 - 6408317 | 843 - 0546 faxWEIHELand Surveying | Civil EngineeringLandscape ArchitectureALLAN H. WEIHE, P.E., L.S. - FOUNDER10505 N. College AvenueIndianapolis, Indiana 46280weihe.netBuild with confidence.SMPLANS REVISED FOR CARMEL TAC COMMENTS12.08.2017RLWPLANS REVISED FOR REVIEW COMMENTS01.23.2018RLW04.08.2019PLANS REVISED FOR REVIEW COMMENTS02.12.2018RLWPLANS UPDATED FOR STUDIO M ARCHITECTS04.08.2019RLW