Loading...
HomeMy WebLinkAbout1702wMAINst-CarmelENG5-t LETTER OF TRANSMITTAL DATE 2/08/2019 JOB NO. 1806-014 TO Carmel Engineering Dept. ATTENTION Alex Jordan RE: Singh Residence 1 Civic Sq., 1st Flr 1702 West Main Street Carmel, IN 46032 Carmel, Indiana WE ARE SENDING YOU Attached Under separate cover via Delivery the following items: Shop drawings Prints Plans Samples Specifications Copy of letter Change order ___ COPIES DATE NO. DESCRIPTION 1 2/08/2019 Set Revised Construction Documents THESE ARE TRANSMITTED as checked below: For approval Approved as submitted Resubmit ____ copies for approval For your use Approved as noted Submit ______ copies for distribution As requested Returned for corrections Return ______ corrected prints For review and comment ___ FOR BIDS DUE _____ PRINTS RETURNED AFTER LOAN TO US REMARKS Please contact us at any time if you have any further questions. This submittal is based on your email comments from 12/12/2018 and the following items have been revised with comments in CAPS: 1. Please provide the spillway elevation on the detail on sheet 2. REVISED ON SHEET 2 2. Is there enough fall to connect the SSD’s to the proposed outlet control structure as shown on the plans? NO WE HAVE PROVIDED A 2’ SUMP IN THE STRUCTURE FOR THE SSD’s OUTLET. 3. Please provide a scour pad for the sump line discharge. NOTE THE LOCATION OF THE NEW OUTLET AND SUMP PUMP DISCHARGE LINE. 4. Can the pipes (including the sump pump) be modified to enter the pond perpendicular to the pond bank? THE PIPES THAT COULD BE MODIFIED WERE MODIFIED TO MEET THIS REQUEST. 5. Please provide a temporary check dam around the outlet control structure on sheet 3. REVISED ON SHEET 3 6. Please add mulch to the permanent seeding legend item on sheet 3. REVISED ON SHEET 3 7. Please extend the silt fence on sheet 3 to encompass the 890 contour on the north and south sides of the pond. REVISED ON SHEET 3 8. Please extend the silt fence so that it contains the proposed grading around the home. REVISED ON SHEET 3 9. Please provide a drainage easement over the pond and connect it to the City’s right-of-way with an access easement. THE EASEMENT WAS PREVIOUSLY SHOWN ON SHEET 2 AND CONFORMS TO CARMEL REQUIREMENTS. 10. Please place silt fence around the disturbance that will be caused by the installation of the path. REVISED ON SHEET 3 11. Please provide an inlet protection detail. Please note that inlet protection within the right-of-way must be completely below the grate, such as flexstorm. REVISED ON SHEET 3 12. Due to the silt fence and requested check dam around the outlet control structure, the inlet protection in the Estates of Clay West subdivision can be removed. REVISED ON SHEET 3 13. The off-site disturbance for the sanitary line should be stabilized with erosion control blanket at a minimum. AN EROSION CONTROL BLANKET IS NOT NEEDED DUE TO THE VERY FLAT SLOPE OF THE EXISTING SITE, LOW TRAFFIC AREA, THE DISTRUBED AREA IS SUUROUNDED BY SILT FENCE, AND THERE IS AN EXTENSIVE GRASS FILTER STRIP IN ALL DIRECTIONS A LONG WAY FROM THE POND OR ANY STORM SEWER INLETS. MULCHING AND PERMANENT SEEDING SHOULD EASILY STABILIZE THIS AREA. 14. Please show the location of the concrete washout. THE CONCRETE WASHOUT WAS PREVIOUSLY SHOWN ON SHEET 3 AND CONFORMS TO CARMEL REQUIREMENTS. PLEASE FEEL FREE TO CONTACT US AT ANY TIME. Carrington Homes COPY TO ______________ ___ ___ SIGNED: _Adam DeHart, PS__ If enclosures are not as noted, kindly notify us at once.