HomeMy WebLinkAboutTake 5 ChangemarksChangemarks Report
Project Name:
Workflow Started:
Report Generated:
Cycle
4
4
4
4
4
4
4
4
4
4
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
2
2
2
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Complete?
False
False
False
False
False
False
False
False
False
False
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
False
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
False
False
False
False
True
True
False
True
False
False
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
True
False
False
Status
UnResolved
UnResolved
UnResolved
UnResolved
UnResolved
UnResolved
UnResolved
UnResolved
UnResolved
UnResolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
UnResolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
UnResolved
UnResolved
UnResolved
UnResolved
Resolved
Resolved
UnResolved
Resolved
UnResolved
UnResolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
Resolved
UnResolved
UnResolved
PZ19050026 DP ADLS - Take 5 Quick Lube
05/17/2019 3:40 PM
10/31/2019 10:59 AM
Department
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Planning & Zoning
Planning & Zoning
Planning & Zoning
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Sign Permits
CrossRoad Engineers
Vectren Energy
Planning & Zoning
Sign Permits
Sign Permits
Engineering
Sign Permits
Sign Permits
Sign Permits
Sign Permits
Sign Permits
Sign Permits
Sign Permits
Sign Permits
Sign Permits
Sign Permits
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Transportation Systems
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
CrossRoad Engineers
CrossRoad Engineers
CrossRoad Engineers
CrossRoad Engineers
CrossRoad Engineers
CrossRoad Engineers
CrossRoad Engineers
CrossRoad Engineers
CrossRoad Engineers
CrossRoad Engineers
CrossRoad Engineers
CrossRoad Engineers
CrossRoad Engineers
Urban Forestry
Urban Forestry
Planning & Zoning
Planning & Zoning
Planning & Zoning
Planning & Zoning
Planning & Zoning
Planning & Zoning
Planning & Zoning
Planning & Zoning
Planning & Zoning
Planning & Zoning
Planning & Zoning
Planning & Zoning
Planning & Zoning
Planning & Zoning
Planning & Zoning
Planning & Zoning
Planning & Zoning
Planning & Zoning
Planning & Zoning
Planning & Zoning
Planning & Zoning
Planning & Zoning
Planning & Zoning
Planning & Zoning
Planning & Zoning
Planning & Zoning
Planning & Zoning
Planning & Zoning
Planning & Zoning
Planning & Zoning
Planning & Zoning
Planning & Zoning
Planning & Zoning
Planning & Zoning
Planning & Zoning
Planning & Zoning
Planning & Zoning
Planning & Zoning
Planning & Zoning
Planning & Zoning
Planning & Zoning
Planning & Zoning
Urban Forestry
Urban Forestry
Urban Forestry
Urban Forestry
Urban Forestry
Urban Forestry
Urban Forestry
Urban Forestry
Carmel Water Operations
Vectren Energy
File
Carmel Road Improvement Estimate_20190930.pdf
Carmel Road Improvement Estimate_20190930.pdf
O&M Manual.pdf
O&M Manual.pdf
O&M Manual.pdf
O&M Manual.pdf
O&M Manual.pdf
O&M Manual.pdf
O&M Manual.pdf
O&M Manual.pdf
C805 GENERAL DETAILS.pdf
Drainage Report.pdf
C502 MASS GRADING & CONSTRUCTION SWPP PLAN.pdf
C502 MASS GRADING & CONSTRUCTION SWPP PLAN.pdf
C502 MASS GRADING & CONSTRUCTION SWPP PLAN.pdf
C801 GENERAL DETAILS.pdf
C401 UTILITY PLAN.pdf
C401 UTILITY PLAN.pdf
A-200 Elevations.pdf
A-200 Elevations.pdf
A-200 Elevations.pdf
C504 SWPP NARRATIVE.pdf
C503 POST CONSTRUCTION SWPP PLAN.pdf
C100 COVER SHEET.pdf
C301 GRADING PLAN.pdf
C301 GRADING PLAN.pdf
C301 GRADING PLAN.pdf
SIGNAGE (2).pdf
C301 GRADING PLAN.pdf
C401 UTILITY PLAN.pdf
Dumpster Enclosure.pdf
SIGNAGE (3).pdf
SIGNAGE (3).pdf
C100 COVER SHEET.pdf
SIGNAGE (2).pdf
SIGNAGE (1).pdf
SIGNAGE (1).pdf
SIGNAGE (1).pdf
DP & ADLS Applications.pdf
DP & ADLS Applications.pdf
DP & ADLS Applications.pdf
L101 LANDSCAPE PLAN.pdf
SIGNAGE (3).pdf
A-200 Elevations.pdf
C401 UTILITY PLAN.pdf
C503 POST CONSTRUCTION SWPP PLAN.pdf
C503 POST CONSTRUCTION SWPP PLAN.pdf
C502 MASS GRADING & CONSTRUCTION SWPP PLAN.pdf
C502 MASS GRADING & CONSTRUCTION SWPP PLAN.pdf
C502 MASS GRADING & CONSTRUCTION SWPP PLAN.pdf
C501 INITIAL CONTROLS SWPP PLAN.pdf
C501 INITIAL CONTROLS SWPP PLAN.pdf
C501 INITIAL CONTROLS SWPP PLAN.pdf
C201 SITE PLAN.pdf
C301 GRADING PLAN.pdf
C301 GRADING PLAN.pdf
C301 GRADING PLAN.pdf
C301 GRADING PLAN.pdf
C301 GRADING PLAN.pdf
L102 LANDSCAPE DETAILS.pdf
C201 SITE PLAN.pdf
C201 SITE PLAN.pdf
C201 SITE PLAN.pdf
C201 SITE PLAN.pdf
C102 EXISTING CONDITIONS & DEMOLITION PLAN.pdf
C102 EXISTING CONDITIONS & DEMOLITION PLAN.pdf
C102 EXISTING CONDITIONS & DEMOLITION PLAN.pdf
C102 EXISTING CONDITIONS & DEMOLITION PLAN.pdf
C102 EXISTING CONDITIONS & DEMOLITION PLAN.pdf
C301 GRADING PLAN.pdf
C301 GRADING PLAN.pdf
C301 GRADING PLAN.pdf
C301 GRADING PLAN.pdf
C301 GRADING PLAN.pdf
Drainage Report.pdf
Drainage Report.pdf
Drainage Report.pdf
Drainage Report.pdf
Drainage Report.pdf
C502 MASS GRADING & CONSTRUCTION SWPP PLAN.pdf
C502 MASS GRADING & CONSTRUCTION SWPP PLAN.pdf
DP & ADLS Applications.pdf
DP & ADLS Applications.pdf
DP & ADLS Applications.pdf
DP & ADLS Applications.pdf
C502 MASS GRADING & CONSTRUCTION SWPP PLAN.pdf
C102 EXISTING CONDITIONS & DEMOLITION PLAN.pdf
L101 LANDSCAPE PLAN.pdf
C100 COVER SHEET.pdf
SIGNAGE (2).pdf
A-100 Floor Plan.pdf
A-200 Elevations.pdf
A-200 Elevations.pdf
A-200 Elevations.pdf
A-200 Elevations.pdf
A-200 Elevations.pdf
A-200 Elevations.pdf
A-200 Elevations.pdf
A-200 Elevations.pdf
A-200 Elevations.pdf
A-200 Elevations.pdf
A-200 Elevations.pdf
A-200 Elevations.pdf
A-200 Elevations.pdf
A-200 Elevations.pdf
A-200 Elevations.pdf
A-200 Elevations.pdf
A-200 Elevations.pdf
A-200 Elevations.pdf
A-200 Elevations.pdf
A-200 Elevations.pdf
A-200 Elevations.pdf
A-200 Elevations.pdf
C201 SITE PLAN.pdf
C201 SITE PLAN.pdf
C201 SITE PLAN.pdf
C201 SITE PLAN.pdf
C201 SITE PLAN.pdf
C201 SITE PLAN.pdf
C201 SITE PLAN.pdf
C201 SITE PLAN.pdf
C201 SITE PLAN.pdf
C201 SITE PLAN.pdf
L101 LANDSCAPE PLAN.pdf
L101 LANDSCAPE PLAN.pdf
L101 LANDSCAPE PLAN.pdf
L101 LANDSCAPE PLAN.pdf
L101 LANDSCAPE PLAN.pdf
L101 LANDSCAPE PLAN.pdf
L101 LANDSCAPE PLAN.pdf
L101 LANDSCAPE PLAN.pdf
C401 UTILITY PLAN.pdf
C401 UTILITY PLAN.pdf
Markup Name
AJ
AJ
AJ
AJ
AJ
AJ
AJ
AJ
AJ
AJ
AJ
AJ
AJ
AJ
AJ
AJ
AJ
AJ
RMK
RMK
RMK
AJ
AJ
AJ
AJ
AJ
AJ
Sign Review 3
CRE
Chad Miller - Vecten Energy
RMK
Sign Review 2
Sign Review 2
AJ
Sign Review 1
Sign review 1
Sign review 1
Sign review 1
Sign Review 1
Sign Review 1
Sign Review 1
Sign Review 1
Sign Review 1
Sign Review 1
AJ
AJ
AJ
AJ
AJ
AJ
AJ
AJ
AJ
DLj
AJ
AJ
AJ
AJ
AJ
AJ
AJ
AJ
AJ
AJ
AJ
AJ
CRE
CRE
CRE
CRE
CRE
CRE
CRE
CRE
CRE
CRE
CRE
CRE
CRE
DM
DM
RMK
RMK
RMK
RMK
RMK
RMK
RMK
RMK
RMK
RMK
RMK
RMK
RMK
RMK
RMK
RMK
RMK
RMK
RMK
RMK
RMK
RMK
RMK
RMK
RMK
RMK
RMK
RMK
RMK
RMK
RMK
RMK
RMK
RMK
RMK
RMK
RMK
RMK
RMK
RMK
RMK
RMK
DM
DM
DM
DM
DM
DM
DM
DM
water
Chad Miller - Vectren Energy
Changemark Subject
Please revise this price to be $12/linear feet
Please break this item down into the separate components
Please replace with the City's owner acknowledgement agreement
Please provide mowing guidelines for the native vegetation
Please list the bioskirt on here along with the sump/SNOUT
Please list this as "Infiltration Basin with Native Vegetation"
Please show the limits of the native vegetation and the location of the protective signage on the site map
Please provide the planting list on this sheet
Please show the limits of the plantings and the location of the protective signage
Please provide a detail for the protective signage on this sheet
Please provide a bio-skirt
Please verify that this elevation is correct
Improvements are proposed within tree protection fencing
Silt fence proposed within the tree protection area
Silt fence across the swale will impede drainage
This detail can be removed
This will need to be RCP
Board of Public Works approval will be required for street cut
Call out new spandrel panel dimension
Tower material
Brick or EIFS?
Please list the second BMP under this section of the SWPPP narrative
Please call out this BMP on the plans
Please provide an operation and maintenance manual with the next submittal
Please show ponding of inlet in the clogged condition
These elevations appear to be incorrect
These elevations do not match
Changemark #13
305.02
Vectren Energy - Centerpoint
Dumpster enclosure
Checkered Panels
Wall Sign Size
Please provide a SWPPP narrative
Incidental Sign
Ground Sign Height
Ground sign base
Changeable Copy
Dimensions of each sign
Total Height of each sign
Square Footage of each sign
Ground Sing Landscaping
Wall Signs
Spandrel Panel Width
Please show the buildings roof drains
Please show erosion control blanket on the bottom and banks of the basin
Please show silt fence on this sheet
Please readjust the construction limits to contain the stockpile
Please provide a temporary rock horseshoe check dam around the outlet control structure
Please place a temporary check dam in front of this end section
Please turn the silt fence into the site like I have shown in red
Please leave gaps in the silt fence for the sidewalk installation
Please show tree protection fencing
Bicycle parking standards
This easement will need to be a BMP easement as well
Please replace with a 6" dual wall underdrain
Please show the limits of the native plantings and provide the planting list on the civil plans
Please provide protective signage for the native plantings
Please place a structure in the right-of-way to collect drainage
Please place this list in the civil plans
Thoroughfare Plan compliance
Entrance must comply with standard drawing 10-22
Please insvestigate connecting to this structure
Please provide a water quality unit
Please show all initial storm water controls on this sheet
Board of Public Works and Safety approval required for the following
102.02.v.e
102.02.v.g
102.02.v.a.a]
102.02.xi.d
102.02.xi.h
102.02.xi.m
102.02.xi.p
102.02.xi.s
302.03
Summary
spillway width
Primary
Outlet Detail
preserving tree?
preserving trees, another location?
Date submitted
Docket number
Docket number ADLS
Lighting
Tree protection fencing
Tree preservation fencing
Ground sign landscaping needed
Please add docket number to title sheet
Ground sign location
Hatched area
Gutter color
Tower materials
Feature under window?
EIFS percent
Sign accent band
Logo sign
Tower wall accent
Wall sconces
EIFS accent band
Additional brick detailing
Additional brick detailing south
Lights on east elevation
Water table height on tower element
Sign spandrel panel dimensions
Box on south elevation
Window design
Material change?
Light?
Brown accent?
Additional window for office?
Building height
Roof pitch of tower
Building dimensions
Basin location
Sign setbacks
Dumpster location
Bike parking dimensions
Sidewalk connection
Label distance
Planting area on north property line
Label width of foundation planting area
Move bike racks to east
add shrubs
arrow doesn't point to shrubs on property
revised UDO
add trees
tree preservation fence
bufferyard width 5' required
existing trees
shade tree for bufferyard
Changemark #01
Vectren Energy - Centerpoint
Changemark Details
Please provide separate unit prices for the base, intermediate, and surface.
I have uploaded this document into the correspondence folder. Please replace this sheet and list all BMPs on the document provided.
The native vegetation should be mowed once a year, either in early spring or late fall.
Please change this call out throughout the O&M and plans.
Please revise this in the O&M as well as the plans.
We will allow for a snout in place of a water quality unit as long as a bio-skirt is provided. Please provide a detail for this and call out on the plans and in the O&M.
This elevation is roughly 30' lower than the elveations provided in the table. Please review and revise.
Please remove the improvements from the tree protection area or relocate the fencing.
We have concerns that the trenching required for installing silt fence will damage the tree roots. Please install a practice that will be less invasive or place the silt fence along
the tree protection fencing.
Please relocate the silt fence here or provide a gap to allow drainage to be conveyed in the roadside swale.
This will not longer be used on the plans so the detail can be removed.
We only allow RCP within the City right-of-way. Please revise.
Please submit a request letter asking the BPW for permission to cut the street and to close/restrict any lanes. A maintenance of traffic will need to be provided for this work.
Please add the dimension of this area from under the white brick accent at the top, to the top of the white brick detail for the garage doors.
I am still concerned about this area of the tower, as well as the side. This should all be brick to match the front. Please confirm and provide addtional renderings/views to show this.
I am still unclear if this side portion is EIFS or brick. I could understand and be supportive of EIFS at the top part of the tower (yellow), but I think the sides and rear should be
brick if showing.
Please also ensure that the BMPE is extended to completely contain this structure.
I have uploaded the document "City of Carmel SWPPP Requirements" to the correspondence folder. The O&M will need to contain all the information listed under #5 of the of the post-construction
SWPPP section.
Please show the limits of the ponding that will occur around this inlet in the 100-year clogged event.
The elevation of the SSD is set above the bottom of the basin. Please revise.
Please revise so that these elevations are the same.
Please upload the revised elevations showing the flip. I understand Staff has them, but Rachel will need them on ProjectDox, so they may be stamped approved.
Please also include the spandrel panel dimensions for the wall sign.
Minimum diameter for all subsurface drains shall be six (6) inches.
No comments.
I am not seeing a gas service line on the utility plan, but if you need gas service, please call 1-800-990-1930 or newservice@vectren.com.
Chad Miller - Vectren Energy
Please revise this to have the dumpster enclosure made out of brick to match the building. Vinyl fencing will not be ok as the material for the entire enclosure, only the fencing part
covering the front for access.
Please reduce the checkered panels to 3 sq. ft. or less. They are considered signage and must be 3 sq ft. or less in order to be considered exempt and allowed
As proposed the wall sign is too tall.The spandrel is measured at 32' (384") wide x 3.25' (39") (this is within the accent band and does not include the outside of it). Signs within
this spandrel may then only be 27.3" tall. Please adjust the sign accordingly.
Please condense the two incidental signs into one. A good spot for one sign, serving as both an entrance and exit sign, is at the northeast corner of the lawn. Please see the site plan
with changemarks for the location.
As proposed the ground sign is larger than permitted. Signs are measured by drawing a box around the entire sign (Take 5 can and changeable copy) and then calculating the square footage.
In this instance the ground sign is 52.75" x 133.5" (87" + 46.56") or 48.9 sq. ft. Please adjust accordingly.
What is the base made of? The Carmel sign standards require masonry material to match the design of the building, in this instance brick.
Please confirm the changeable copy will be manual letters that need to be change individually and not scrollers or electronic.
Please change to "Per Carmel Ordinance"
Please change to read "Per Carmel ordinance"
Please change to read "Per Carmel ordinance"
Please include landscaping around the ground sign equal to the sign area. If not included in the landscape plan it will need to be submitted with the sign permit applicaiton.
As proposed the wall signs count as two sings because they occupy to potential spandrel panels. Please recude the wall signs to one.
Please identify the spandrel panel width.
Please refer to the City of Carmel's bicycle parking standards to ensure that the racks will be installed in compliance with them. Racks are to be installed a minimum of 24 inches from
all walls or obstructions.
Please show the limits of where the native plantings will extend to. Please also provide the planting list on the civil plans as well as the landscape plans.
Please show the location of protective signage on the cross-section and plan view. A detail will need to be provided for this signage as well.
Please collect the right-of-way and bring it into the site to be treated and detained.
Please provide this list on C301 next to the basin cross-section.
Compliance with the City’s Thoroughfare Plan includes construction of half of the improvements prescribed by the Thoroughfare Plan across the frontage. If these improvments are not made,
money equal to the value of constructing these improvements should be contributed to the City for deposit in the City’s non-reverting Thoroughfare Plan fund.
Please revise the entrance to comply with the City standard commercial driveway detail. This requires 30' radii, depressed curb, and concrete within the right-of-way.
There is a manhole within this intersection that has an invert on 875.98. Please investigate the possiblility of tying the outlet pipe into this structure.
We require that each site provide two BMPs. Please provide a watere quality unit to act as the second BMP for the site. Please ensure that it is sized per our standards.
Please show all necessary erosion and sediment controls for demolition. This would include the construction entrance, perimeter protection, inlet protection, tree protection, etc.
Please submit a request letter to our office to for the following:
- To restrict a lane/close 98th Street for this cut. Please also provide standard drawing 10-24 for street cut repair.
- To vacate the existing curb cut on 98th Street
- To request approval for the proposed cut on to 98th Street
the Existing Project Site Layout shall include the identification and delineation of vegetative cover such as grass, weeds, brush, and trees on the project site.
the Existing Project Site Layout shall include the land use of all adjacent properties.
the Existing Project Site Layout shall include all topography of land surrounding the site to a distance of at least one hundred (100) feet if the project site is less than or equal
to two (2) acres in total land area.
the grading and drainage plan shall include the delineation of all proposed land disturbing activities.
the grading and drainage plan shall indicate as to the system being public or private.
the grading and drainage plan shall include a drainage summary, which summarizes the basic conditions of the drainage design, including site acreage, off-site/upstream acreage, allowable
release rates, post-developed 10-year, and 100-year flows leaving the site, volume of detention required, volume of detention provided, and any release rate.
the grading and drainage plan shall include the definition of minimum flood protection grade in accordance with this manual.
the grading and drainage plan shall include a typical cross section of pond if not in accordance with standard cross section.
For sites where the pre-developed area has more than one (1) outlet, the release rate should be computed based on pre-developed discharge to each outlet point. The computed release
rate for each outlet point shall not be exceeded at the respective outlet point even if the post developed conditions would involve a different arrangement of outlet points. It appears
that the combined post-developed 98th St roadside ditch exceeds the pre-developed EX1. PLease review and revise.
This does not appear to be correct.
13 feet, 20 feet or 26.5 feet?
Plans show a 26.5' spillway at 882.3, summary on page 8 of this report shows the spillway at 13'. The #2 primary is not shown in the construction plans. The 6-inch outlet pipe will
not control the outflow from this site. The infiltration through the 4" of mulch, 8" of planting soil, gravel jacket and 4" perforated underdrain will control the outflow from this
system, and it has not been accounted for in these calculations. Please review and revise.
This detal should be included in the construction plans
At this time, the plan is to save these trees. Please adjust the construction limits and silt fence to not include these trees in the construction limits. Tree preservation fencing should
be installed around all trees near construction as well. see detail on sheet L102
At this time, the plan is to save these trees. Please adjust the construction limits and silt fence to not include these trees in the construction limits. Tree preservation fencing should
be installed around all trees near construction as well. see detail on sheet L102
Please add the date (5/15/19) submitted to the application.
Please add the docket number 19050027 DP/ADLS to the application.
Please add the docket number 19050027 DP/ADLS to the ADLS application.
Please provide cut sheets for all lights proposed.
Please make a note on these plans about tree preservation fencing for the trees that are to remain.
Please make addtional notes that tree preservation fencing should be installed around the trees which are to remain.
Please add additional landscaping around the proposed ground sign. Amount of landscaping around sign should equal sign area.
Please add docket number 19050026 Z and 19050027 DP/ADLS to the title sheet.
Please make sure the ground sign location matches what is shown on the site plan. Ground signs must be placed in the ground with a landscaped base around it.
What is located in this area? Storage?
Please paint gutters to match brick color behind it so it blends into the facade.
Please illustrate and label the matching materials (brick) that will be used for the back side of the tower feature on all elevations.
What is this?
Please provide a calculation of the percent of EIFS used on the building. It must be 10% or less of the non window (doors) facade area.
Please add an accent "frame" around the main wall sign, which will help create what we call a spandrel panel area. This is typically done with a soldier course row of bricks or some
other brick patterning. It can be done in the same color brick or an accent color.
The logo sign must be moved over to be combined with the drive thru oil change wording. As shown now, this is two signs for this elevation, which would require a variance that the dept.
will not support.
Instead of the logo sign, please add a frame or other brick accent feature in this space to add character and additional design features to the building.
The proposed wall sconces in this elevation view seem out of scale. Please provide larger light fixtures for this wall that match the scale of the building.
Please change this band to stone or brick.
Please add additional brick detailing to the facades to break them up further. Faux windows or frames could be placed below the accent band. Above the accent band, we would like to see
a frame that would match what should be added to the west elevation for the wall sign.
Please add additional brick detailing on the south facade to enhance this elevation. We would like to see a "frame" element on the upper portion of the building and faux or "bricked
in" windows on either side of the door.
Please add lights on the east facade to match the west facade.
Please increase the height of the water table on the tower columns. Right now there is not enough of a difference between this area and the rest of the building to call attention to
it.
Once the framed in area is added, we will need the dimensions of the width and height of it called out on the elevation.
What is this box? A vent?
Please revise this window design to more closely match/mimic the shape/design of the garage bay door windows. Can the height of this window be increased?
Is this a material change behind the tower element or did it just not get rendered as brick? This needs to be brick to match the rest of the facade.
What is this? light fixture?
What is this? A light?
Can an addtional window be added for the office? Or perhaps a transom window? (Transom window idea for this facade shown in blue rectangles)
Please revise the height of the building to be right at 20'. This is required adjacent to residentially zoned properties. UDO Section 3.88.C
Please label the roof pitch of the tower element.
Please label the building's longest and widest dimensions on the site plan.
Can this basin be moved to the north at all? Would like to provide as much separation for preservation of the large tree to the south.
Please label the ground sign location from both street right-of-ways.
Why is the dumpster location set back so far from the pavement edges?
Please label the bike parking pad dimensions and distance from the entry door.
Please provide crosswalk striping across this area. The do not enter could be moved to a sign.
Please label the overall distance from the east property line.
Please increase the width of this area to the 5' minimum for required plantings. There is no drive aisle requirement for a one way traffic lane that is not adjacent to parking spaces.
Please label the width of the foundation planting area.
As a compromise, we may need you to move the bike racks a little to the east to increase the area that foundation plantings can be placed.
Please screen the dumpster here and any other electric mechanisms on the site. please also screen the parking at this location.
Is this on the adjacent property or this site. Please adjust arrow and message accordingly.
These calculations are from an old UDO version. Please obtain the newest version from our department.
There will need to be Mich Rd overlay trees (3 shade, 1 ornamental) and overlay parking landscaping (3 shade, 1 ornamental and 30 shrubs) required in the greenbelt, in addition to the
parking requirement. I see the shrubs are just outside the greenbelt which is fine.
I am not sure where it is best, but please provide a tree preservation fence around all of the trees to be saved as far away from the tree as construction allows. I have a rough blue
line as an example on the plan.
this area looks like its only 2.8'.
5' width minium is required for landscaping
the existing trees that area labeled are all wrong, the species and sometimes the size and locations are wrong. The 32" elm is a boxelder tree with 2 - smaller persimmon right next to
the basin. It may not be worth saving. Reviewing all of the existing tree, especially the ones right next to construction may need to be looked at better.
a least a couple of the required shade trees should be in this section of the perimeter bufferyard
see notes
The existing house has gas service, please call 1-800-227-1376 to have the gas service retired before the house is tore down. I did not see you are needing gas service to the new building
on the utlilty sheet. Will you need gas service? 5/24/2019 Chad Miller
Markup Date
10/31/2019 10:02 AM
10/31/2019 10:02 AM
10/31/2019 9:54 AM
10/31/2019 9:54 AM
10/31/2019 9:54 AM
10/31/2019 9:54 AM
10/31/2019 9:54 AM
10/31/2019 9:54 AM
10/31/2019 9:54 AM
10/31/2019 9:54 AM
09/26/2019 12:51 PM
09/26/2019 12:49 PM
09/26/2019 9:32 AM
09/26/2019 9:32 AM
09/26/2019 9:32 AM
09/26/2019 9:04 AM
09/26/2019 8:44 AM
09/26/2019 8:44 AM
09/25/2019 1:52 PM
09/25/2019 1:52 PM
09/25/2019 1:52 PM
09/24/2019 2:02 PM
09/24/2019 2:00 PM
09/24/2019 10:54 AM
09/26/2019 7:42 AM
09/26/2019 7:42 AM
09/26/2019 7:42 AM
09/10/2019 1:02 PM
08/05/2019 2:15 PM
07/26/2019 9:06 AM
07/25/2019 11:23 AM
07/19/2019 11:50 AM
07/19/2019 11:50 AM
06/21/2019 1:43 PM
06/21/2019 11:45 AM
06/21/2019 11:43 AM
06/21/2019 11:43 AM
06/21/2019 11:43 AM
06/21/2019 11:28 AM
06/21/2019 11:28 AM
06/21/2019 11:28 AM
06/21/2019 11:24 AM
06/21/2019 11:21 AM
06/21/2019 11:21 AM
06/19/2019 1:49 PM
06/19/2019 1:45 PM
06/19/2019 1:45 PM
06/19/2019 1:47 PM
06/19/2019 1:47 PM
06/19/2019 1:47 PM
06/21/2019 1:41 PM
06/21/2019 1:41 PM
06/21/2019 1:41 PM
06/18/2019 11:53 AM
06/21/2019 1:40 PM
06/21/2019 1:40 PM
06/21/2019 1:40 PM
06/21/2019 1:40 PM
06/21/2019 1:40 PM
06/18/2019 10:41 AM
06/21/2019 1:35 PM
06/21/2019 1:35 PM
06/21/2019 1:35 PM
06/21/2019 1:35 PM
06/18/2019 10:26 AM
06/18/2019 10:26 AM
06/14/2019 2:51 PM
06/14/2019 2:51 PM
06/14/2019 2:51 PM
06/14/2019 2:45 PM
06/14/2019 2:45 PM
06/14/2019 2:45 PM
06/14/2019 2:45 PM
06/14/2019 2:45 PM
06/14/2019 2:53 PM
06/14/2019 2:53 PM
06/14/2019 2:53 PM
06/14/2019 2:53 PM
06/14/2019 2:53 PM
06/05/2019 2:15 PM
06/05/2019 2:15 PM
06/03/2019 3:47 PM
06/03/2019 3:47 PM
06/03/2019 3:47 PM
06/03/2019 3:47 PM
06/03/2019 3:46 PM
06/03/2019 3:46 PM
06/03/2019 3:46 PM
06/03/2019 3:46 PM
06/03/2019 3:46 PM
06/03/2019 3:46 PM
06/03/2019 3:45 PM
06/03/2019 3:45 PM
06/03/2019 3:45 PM
06/03/2019 3:45 PM
06/03/2019 3:46 PM
06/03/2019 3:46 PM
06/03/2019 3:46 PM
06/03/2019 3:46 PM
06/03/2019 3:46 PM
06/03/2019 3:46 PM
06/03/2019 3:46 PM
06/03/2019 3:46 PM
06/03/2019 3:46 PM
06/03/2019 3:46 PM
06/03/2019 3:46 PM
06/03/2019 3:46 PM
06/03/2019 3:46 PM
06/03/2019 3:46 PM
06/03/2019 3:46 PM
06/03/2019 3:46 PM
06/03/2019 3:46 PM
06/03/2019 3:46 PM
06/03/2019 3:45 PM
06/03/2019 3:45 PM
06/03/2019 3:45 PM
06/03/2019 3:45 PM
06/03/2019 3:45 PM
06/03/2019 3:45 PM
06/03/2019 3:45 PM
06/03/2019 3:45 PM
06/03/2019 3:45 PM
06/03/2019 3:45 PM
06/05/2019 3:06 PM
06/05/2019 3:06 PM
06/05/2019 3:06 PM
06/05/2019 3:06 PM
06/05/2019 3:06 PM
06/05/2019 3:06 PM
06/05/2019 3:06 PM
06/05/2019 3:06 PM
05/24/2019 1:32 PM
05/24/2019 9:09 AM
Updated By
Alex Jordan
Alex Jordan
Alex Jordan
Alex Jordan
Alex Jordan
Alex Jordan
Alex Jordan
Alex Jordan
Alex Jordan
Alex Jordan
Alex Jordan
Alex Jordan
Alex Jordan
Alex Jordan
Alex Jordan
Alex Jordan
Alex Jordan
Alex Jordan
Rachel Keesling
Rachel Keesling
Rachel Keesling
Alex Jordan
Alex Jordan
Alex Jordan
Alex Jordan
Alex Jordan
Alex Jordan
Nathan Chavez
Willie Hall
Chad Miller
Rachel Keesling
Nathan Chavez
Nathan Chavez
Alex Jordan
Nathan Chavez
Nathan Chavez
Nathan Chavez
Nathan Chavez
Nathan Chavez
Nathan Chavez
Nathan Chavez
Nathan Chavez
Nathan Chavez
Nathan Chavez
Alex Jordan
Alex Jordan
Alex Jordan
Alex Jordan
Alex Jordan
Alex Jordan
Alex Jordan
Alex Jordan
Alex Jordan
David Littlejohn
Alex Jordan
Alex Jordan
Alex Jordan
Alex Jordan
Alex Jordan
Alex Jordan
Alex Jordan
Alex Jordan
Alex Jordan
Alex Jordan
Alex Jordan
Alex Jordan
Willie Hall
Willie Hall
Willie Hall
Willie Hall
Willie Hall
Willie Hall
Willie Hall
Willie Hall
Willie Hall
Willie Hall
Willie Hall
Willie Hall
Willie Hall
Daren Mindham
Daren Mindham
Rachel Keesling
Rachel Keesling
Rachel Keesling
Rachel Keesling
Rachel Keesling
Rachel Keesling
Rachel Keesling
Rachel Keesling
Rachel Keesling
Rachel Keesling
Rachel Keesling
Rachel Keesling
Rachel Keesling
Rachel Keesling
Rachel Keesling
Rachel Keesling
Rachel Keesling
Rachel Keesling
Rachel Keesling
Rachel Keesling
Rachel Keesling
Rachel Keesling
Rachel Keesling
Rachel Keesling
Rachel Keesling
Rachel Keesling
Rachel Keesling
Rachel Keesling
Rachel Keesling
Rachel Keesling
Rachel Keesling
Rachel Keesling
Rachel Keesling
Rachel Keesling
Rachel Keesling
Rachel Keesling
Rachel Keesling
Rachel Keesling
Rachel Keesling
Rachel Keesling
Rachel Keesling
Rachel Keesling
Daren Mindham
Daren Mindham
Daren Mindham
Daren Mindham
Daren Mindham
Daren Mindham
Daren Mindham
Daren Mindham
Steve Cook
Chad Miller
Applicant Response
Bioskirt note and detail added
Typo has been corrected
Tree protection updated
FILTER SOCK PROPOSED WITHIN DRIPLINES OF TREES ALONG SOUTH SIDE OF PROJECT SITE.
SILT FENCE RELOCATED AS REQUESTED
Detail has been removed
UPDATED TO PROVIDE RCP WITHIN CITY RIGHT OF WAY
MAINTENANCE OF TRAFFIC PLAN ADDED TO PLAN SET, LETTER TO BPW IS INCLUDED IN RESUBMITTAL DOCUMENTS
Uploaded as "A-200 Elevations Support"
Uploaded as "A-200 Elevations Support"
Uploaded as "A-200 Elevations Support"
NARRATIVE UPDATED TO INCLUDE SECOND BMP AS REQUESTED
Bmpe extended as requested
O&M MANUAL IS INCLUDED IN RESUBMITTAL DOCUMENTS
limits of ponding added as requested
revised ssd elevation as requested
revised to match as requested
rachel uploaded
OK. Gas is not needed
Done
Done
Done
Added as requested
Per discussion on 7/2, we will leave as is.
Revised and re-uploaded.
Revised and re-uploaded.
That is correct
Revised and re-uploaded.
Revised and re-uploaded.
Revised and re-uploaded.
addressed through site visit and coordination with Daren Mindham
Revised and re-uploaded.
Revised and re-uploaded.
added ref keynote "ST4"
added to banks, but not on bottom per conversation with A Jordan & J Thomas on 7/1.
per discussions with A Jordan and J Thomas on 7/1, silt fence not required on this sheet.
adjusted as requested
CHECK DAM ADDED AROUND STRUCTURE 602 AS REQUESTED
comment noted. we will provide upon completion of drainage design through engineering dept.
revised as requested
revised as requested
added as requested
Confirmed.
updated label as requested
updated as requested
added as requested
added as requested
A CULVERT HAS BEEN ADDED FROM THE 98TH STREET ROADSIDE DITCH INTO THE INFILTRATION BASIN AS REQUESTED.
Added to C301 as requested
CONTRIBUTION WILL BE MADE. ESTIMATE OF COSTS IS INCLUDED IN THIS RESUBMITTAL.
Concrete within ROW updated. See keynote A1. Will request variance on curb radii to allow 20' as proposed. BPW LETTER IS INCLUDED WITH THIS SUBMITTAL
Investigating.
Investigating
Not required. Shown on C501. Note added to sheet C501.
LETTER IS INCLUDED WITH THIS SUBMITTAL
added as requested
added as requested
ADDITIONAL TOPOGRAPIC CONTOURS ADDED FROM GIS MAPPING AS REQUESTED AND PREVIOUSLY DISCUSSED. THERE IS NO OFFSITE FLOW OF RUNOFF TO THIS PROJECT SITE IDENTIFIED.
DISTURBANCE LIMITS ADDED TO C301 AS REQUESTED.
note added to c301 as requested
DRAINAGE SUMMARY ADDED TO C301 AS REQUESTED
added as requested.
provided as requested
BASED ON PREVIOUS CONVERSATIONS AND FOLLOW UP EMAIL FROM WILLIE HALL, THE BASIN HAS BEEN EXPANDED TO ALLOW FOR THE NECESSARY OUTFALL LIMITS FOR THE 100 YEAR DESIGN STORM. THE TWO YEAR
AND 10 YEAR DESIGN STORMS SLIGHTLY EXCEED THE PERMISSIBLE 0.1 CFS/ACRE DUE TO THE SMALL CONTRIBUTING DRAINAGE AREA. HOWEVER, THE DOWNSTREAM RECEIVING PIPE HAS MORE THAN SUFFICIENT
CAPACITY TO HANDLE THE EXTRA 0.01 CFS THAT WILL BE CONVEYED TO IT FOR THE 10 YEAR STORM.
Addressed in resubmitted docs
PLANS AND REPORT HAVE BEEN UPDATED TO MATCH.
PLANS AND REPORT HAVE BEEN UPDATED TO MATCH.
Addressed in resubmitted docs
comment noted. Ref C502 & L101-L102
comment noted. ref C502 & L101-L102
Revised and re-uploaded.
Revised and re-uploaded.
Revised and re-uploaded.
Uploaded
added as requested. ref keynote "TF"
updated key note "F" on C102
addressed through site visit and coordination with Daren Mindham
Added as requested
Revised and re-uploaded.
Yes
Revised and re-uploaded.
Added "A-200 Elevations Support" This addresses your concerns.
PTAC System. This is added to the re-uploaded elevations.
Revised and re-uploaded.
Revised and re-uploaded.
Revised and re-uploaded.
See what we have now. We thought this looked better than a border with nothing in it. We tried it and it looked like something was supposed to be inside the border, but there wasn't
Revised and re-uploaded.
With the additional detailing, we removed this band.
Revised and re-uploaded.
Revised and re-uploaded.
Revised and re-uploaded.
Revised and re-uploaded.
Added "A-200 Elevations Support" This addresses your concerns.
Yes. Added comment to revised elevations.
Revised and re-uploaded.
Revised and re-uploaded. It is brick
Yes
Overhead scupper. Comment added to revised elevations.
Revised South elevation per our discussion on 7/2. No window was added.
Revised and re-uploaded.
Revised and re-uploaded.
added as requested
Per Urban Forester, ex. tree is question shall be removed.
Added as requested.
To provide space for gate swing without interfering with parking spaces.
Done
Ramp and crosswalk added to the west of do not enter markings.
Done
Width increased to provide min 5' planting between back of curb and ROW
Done
bike parking shifted to east
addressed through site visit and coordination with Daren Mindham
addressed through site visit and coordination with Daren Mindham
addressed through site visit and coordination with Daren Mindham
addressed through site visit and coordination with Daren Mindham
addressed through site visit and coordination with Daren Mindham
addressed through site visit and coordination with Daren Mindham
addressed through site visit and coordination with Daren Mindham
addressed through site visit and coordination with Daren Mindham
all comments and notes have been addressed
NO GAS SERVICE IS NEEDED FOR THIS DEVELOPMENT.