Loading...
HomeMy WebLinkAboutC503 POST CONSTRUCTION SWPP PLAN30' BSL AND US 421 GREENBELT30' BUFFERYARD50' BSL30' BSL 15' BSL 5' BUFFERYARD 5' BUFF ERYARD 5' BUFFERYARD PROPO S E D TAKE 5 OIL CHANG E BUI LDI NG (1,500 SF±) PROPO S E D INFI LTRAT I ON BASIN WITH NATIVE VEGET A TION BOT=879.5 MAX. 100 Y R = 881.3 TOP OF B ANK=882.3 PR. D.E . & BMP ESMTPR. D.E. & BMP ESMTPR. D.E . & BMP ESMTPR. D.E. & BMP ESMT MICHIGAN RD(HWY 421) 98TH ST (50'PUBLIC ROW) CL CL CL 3 TONS OF REVETMENT RIPRAP CATCH BASIN WITH SUMP, SNOUT F12 AND BIO-SKIRT 3 TONS OF REVETMENT RIPRAP PS PS PS L L PS FOR PERMANENT E.C.TREATMENT IN THIS AREA SEE SHEET L101 EB EB PS PS PROJECT NO. CHECK: DRAWN: PLAN DATE: DESIGN: STATE OF No. PE10707583 OO14020 Mississinewa Drive Carmel, Indiana 46033 P: 317.324.8695 F: 317.324.8717 www.Fritz-Eng.com PRELI MINA RY NOT FOR CONST R UCTI O N Fritz Engineering Services, LLC REVISIONS AND ISSUES BYDATE CLIENT: PROJECT: PROJECT LOCATION: GENERAL NOTES / LEGEND: SECTION, TOWNSHIP, RANGE: TAKE 5 QUICK LUBE TAKE 5 INDIANA, LLC 10884 GRESHAM PLACE NOBLESVILLE, INDIANA 46060 5/16/2019 1904001 9799 MICHIGAN RD. CARMEL, INDIANA 46032 HAMILTON COUNTY S7, T17N, R3E SHEET NAME SHEET NO. 0 20' 40' SCALE: 1" = 20' N "IT'S THE LAW" R Know what's below. Call before you dig. 2 WORKING DAYS BEFORE YOU DIG.C503 POST CONSTRUCTION SWPP PLAN 1.REV. PER TAC CMNTS 7/17/2019 2. REV. PER CARMEL ENG 10/15/2019 3. REV. PER CARMEL ENG 11/5/2019 AF AF AF AF AF KG KEY NOTES: IP FLEXSTORM INLET PROTECTION CE CONSTRUCTION ENTRANCE PS PERMANENT SEEDING TS TEMPORARY SEEDING EB EROSION CONTROL BLANKET WITH PERMANENT SEEDING SS SOIL STOCKPILE SF SILT FENCE CL CONSTRUCTION LIMITS CW CONCRETE WASHOUT L LANDSCAPE MATERIAL (FOR POST CONSTR. TREATMENT SEE LANDSCAPE PLAN) BR BIO-RETENTION VEGETATION TF TREE PROTECTION FENCING (REF. L102 FOR DETAILS) XX SF 1. EROSION CONTROL PLAN MUST BE EXECUTED BEFORE COMMENCING WITH CONSTRUCTION. 2. ALL EROSION CONTROL MATERIAL NEEDS TO BE APPROVED BY THE CITY INSPECTORS PRIOR TO INSTALLATION. CONTRACTOR TO KEEP EXISTING PAVEMENT SURROUNDING THE SITE (MICHIGAN ROAD & 98TH ST.) "BROOM CLEAN" AND FREE OF SOIL OR AGGREGATE THAT MIGHT BE BROUGHT OFF-SITE. DEPENDING ON THE CONSTRUCTION SEASON, MOISTURE CONTENT AND PROPERTIES OF THE SOILS ON SITE, CHEMICAL MODIFICATIONS AND/OR LIME STABILIZATION MAY BE REQUIRED. SEE SHEET C901 FOR SPECIFICATIONS. ALL CONCRETE PIPE JOINTS SHALL BE CONTINUOUS O-RING RUBBER GASKET CONFORMING TO ASTM C 443 GENERAL NOTES EROSION CONTROL NOTES ALL STORMWATER DRAINAGE CASTINGS SHALL BE LABELLED WITH ENVIRONMENTAL MESSAGING "NO DUMPING, DRAINS TO WATERWAY" CAST IN RAISED OR RECESSED LETTERS AT A MIN. 1-INCH HEIGHT. A SYMBOL OF A FISH SHALL ALSO BE CAST WITH THE LETTERS STORM SEWER INLET NOTE ALL STORM SEWER INFRASTRUCTURE TO BE CONSTRUCTED WITH THIS PROJECT SHALL BE PRIVATELY OWNED AND MAINTAINED BY BALDWIN CAPITAL. STORM SEWER SYSTEM NOTE DO NO USE FERTILIZER CONTAINING PHOSPHOROUS (12-12-12) UNLESS SOIL TESTS INDICATE A PHOSPHOROUS DEFICIENCY FERTILIZER NOTE WHERE REQUIRED, CRIMPED/ANCHORED MULCH OR MULCH WITH A TACKING AGENT SHALL BE USED. THE APPLICATION RATE SHOULD MEET GUIDLINES PER PRACTICE 3.15 OF THE INDIANA HANDBOOK FOR EROSION CONTROL IN DEVELOPING AREAS. MULCH NOTE INSTALL TEMPORARY SEEDING AFTER A SPECIFIC STAGE OF CONSTRUCTION HAS BEEN COMPLETED (TEMPORARY OR FINAL) WHERE AREAS WILL BE IDLE OF CONSTRUCTION ACTIVITIES FOR A PERIOD OF 15 DAYS OR MORE. SEEDING NOTE 02/19/20