Loading...
HomeMy WebLinkAboutC100 COVER SHEETPROJECT NO. CHECK:DRAWN: PLAN DATE: DESIGN: STATE OF No. PE10707583 OO14020 Mississinewa Drive Carmel, Indiana 46033 P: 317.324.8695 F: 317.324.8717 www.Fritz-Eng.com ashton@Fritz-Eng.com Fritz Engineering Services, LLC REVISIONS AND ISSUES BYDATE CLIENT: PROJECT: PROJECT LOCATION: PROJECT TEAM: SECTION, TOWNSHIP, RANGE: THE AVENUE AT BENNETT FARM JDF DEVELOPMENT 11710 PEBBLEPOINTE PASS CARMEL, INDIANA 46033 11/18/2020 200905 11100 & 11150 N. MICHIGAN RD. CARMEL, INDIANA 46077 HAMILTON COUNTY SW 1 4, S6, T17N, R3E SHEET NAME SHEET NO. JDF DEVELOPMENT 11710 PEBBLEPOINTE PASS CARMEL, INDIANA 46033 Contact Person: Joe Farr 317-509-7388 jfarr@jdfdevelopment.com CONSTRUCTION PLANS FOR: THE AVENUE AT BENNETT FARM 11100 & 11150 N. MICHIGAN RD. CARMEL, CLAY TOWNSHIP, HAMILTON COUNTY, INDIANA SECTION 6, TOWNSHIP 17N, RANGE 3E SITE VICINITY & ZONING MAP FLOOD ZONE: The project site is located within the FEMA Community Panel Map #18011C0353E dated January 18, 2012 and #18057C0205G dated November 19, 2014. Review of the map indicates the site is located within the Flood Designations 'Zone X' (unshaded). The proposed buildings and improvements are located in Zone X Unshaded and are therefore not subject to Flood Control Ordinance requirements. SITE LOCATION 2.0 Acres Zoned: B3 SITE DATA: TOTAL SITE ACREAGE - 2.07 AC TOTAL ACREAGE OF DISTURBANCE - 1.7 AC GROSS SQUARE FOOTAGE OF BUILDING MULTI-TENANT- 11,000 SF DRIVE THROUGH RESTAURANT TENANT - 2,000 SF PROPOSED CONSTRUCTION START - FEBRUARY 1, 2021 PROPOSED CONSTRUCTION END - NOVEMBER 1, 2021 WORK IS SCHEDULED TO BE COMPLETED IN ONE CONTINUOUS CONSTRUCTION PHASE SETBACKS:REQUIRED PROVIDED FRONT YARD 30 FT (MICHIGAN)91.4 FT 60 FT (BENNETT)95.2 FT 60 FT (REDD RD)38.3 FT (VARIANCE REQUESTED) SIDE YARD 0 FT 66.1 FT (SOUTH) REAR YARD 30 FT N/A (NO REAR YARD)N C100 COVER SHEET 1. REV PER CARMEL TAC 2/11/2021 2. ISSUED FOR BID 2/26/2021 3. REV. PER CARMEL CMMTS 3/9/2021 4.REV NORTH DR/PARKING 3/28/2021 AF AF AF AF AF AF KG 1.The construction plans shall govern over any other form of media, which includes digital files of this project. 2.The contractor shall be responsible for obtaining or verifying that all permits and approvals are obtained from the respective city, county, state & federal agencies prior to starting construction. 3.It shall be the contractors responsibility to determinate the exact location of all existing utilities in the vicinity of the construction area prior to starting construction. Once all utilities have been located, it will be the contractor's responsibility to maintain in service all existing utilities encountered during construction unless otherwise indicated in the construction drawings. 4.Before working with or around existing utilities, the applicable utility company shall be contacted by the contractor. It shall be the contractor's responsibility to notify and coordinate construction with all respective utilities. 5.All construction methods and materials must conform to current standards and specifications for the governing municipality requirements. 6.Maintenance of traffic needed for this project shall be installed and maintained per INDOT specifications and the indiana MUTCD Manual. 7.The contractor shall be responsible for all field dimensions and shall verify all dimensions on the site prior to start of construction. If any discrepancies are found in these plans from actual field conditions, the contractor shall notify the engineer immediately. 8.All quantities given on these construction plans or in the scope of work section are estimates and shall be confirmed by the bidding contractors. 9.It shall be the responsibility of the developer and contractor to maintain quality control throughout this project. 10.Bearings, dimensions, and easements are shown for reference only. See record surveys and plats for exact information.B3 MULTI-FAMILY ZIONSVILLE N SITE LOCATION MAP SITE LOCATION NOT TO SCALE HEN D RI C KS MARION MORGAN SHELBY JOHN S O N BOONE HAM I L TO N CLINTON MONT G O ME R Y BENCHMARK: COORDINATE SYSTEM: US STATE PLANE 1983 (AT GROUND) PROJECT DATUM: WORLD GEODETIC SYSTEM (WGS 1984) VERTICAL DATUM NAVD 88 ZONE:INDIANA EAST 1301 GEOID MODEL: GEOID03 (CONUS) COORDINATE UNITS US SURVEY FEET DISTANCE UNITS US SURVEY FEET HEIGHT UNITS US SURVEY FEET USGS BENCHMARK BM 59 STP PROJECT NO. 9903 (020), ESTABLISHED BY BLN-4/2004. MINE SPIKE & WASHER IN UTILITY POLE #898-6379 AT THE NW CORNER OF 1 06TH STREET AND US 421. ELEV. = 895. 17' TBM CUT "X" IN EASTERNMOST BONNET BOLT OF FIRE HYDRANT LYING WEST OF US 421. SOUTH OF BENNETT PARKWAY. ELEV.=901.56' CARMEL UTILITIES 30 West Main Street Carmel, IN 46032 (317) 571-2442 (Customer Service) CITIZEN'S ENERGY GROUP 2150 Dr. Martin Luther King Jr. Street indianapolis, IN 46202 (317) 263-6418 CARMEL DEPARTMENT OF COMMUNITY SERVICES 1 Municipal Drive Carmel, IN 46032 (317) 571-2417 DUKE ENERGY 100 South Mill Creek Road Noblesville, Indiana 46060 (317) 776-5365 VECTREN 16000 Allisonville Road Noblesville, Indiana 46061 (317) 776-5532 CARMEL DEPARTMENT OF ENGINEERING 1 Municipal Drive Carmel, IN 46032 (317) 571-2411 COMCAST 5330 E. 65th Street Indianapolis, IN 46220 (317) 774-3384 TRICO REGIONAL WASTE 10701 N College Ave, Suite A Indianapolis, IN 46280 CITY OF CARMEL CONSTRUCTION STANDARDS AND SPECIFICATIONS, LATEST EDITION, TO BE USED AS SUPPLEMENTAL INFORMATION WITH THESE PLANS. INDIANA STATE DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS, LATEST EDITION, TO BE USED AS SUPPLEMENTAL INFORMATION WITH THESE PLANS. CARMEL ENGINEERING DEPARTMENT NOTE: ALL PAVING WITHIN THE EXISTING AND PROPOSED CITY RIGHT-OF-WAY SHALL CONFORM TO THE REQUIREMENTS OF THE DEPARTMENT OF ENGINEERING. THE CONTRACTOR SHALL CONTACT THE DEPARTMENT OF ENGINEERING TO SCHEDULE A PRE-CONSTRUCTION MEETING TO REVIEW THE DEPARTMENT'S CONSTRUCTION REQUIREMENTS, STAFF NOTIFICATION REQUIREMENTS, REQUIRED INSPECTIONS FOR CERTAIN STAGES OF THE WORK AND TO REVIEW THE AUTHORITY OF THE DEPARTMENT AS IT RELATES TO WORK WITHIN THE EXISTING AND PROPOSED RIGHT-OF-WAY. EXISTING RIGHT OF WAY NOTE: DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL BE RESTORED/REPAIRED TO THE SATISFACTION OF THE CITY AT THE COMPLETION OF THE PROJECT. THE CONTRACTOR IS ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THE CITY PRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THE EXISTING CONDITION OF THE RIGHT-OF-WAY. B2 S1 CARMEL PETITION REFERENCE: DOCKET NO. PZ-2020-00198 DP/ADLS: THE AVENUE AT BENNETT FARM. DOCKET NO. PZ-2020-00206 ZW: 20' MAXIMUM BUILDING HEIGHT, 22'6” AND 22'4” REQUESTED. DOCKET NO. PZ-2020-00207 ZW: 30' MINIMUM GREENBELT WIDTH REQUIRED, 28' REQUESTED. DOCKET NO. PZ-2020-00208 ZW: NUMBER OF PARKING SPACES - 88 REQUIRED, 77 REQUESTED. STORMWATER PERMIT: PLANS PREPARED FOR: OPERATING AUTHORITIES GENERAL NOTES SHEET LIST TABLE SHEET NUMBER SHEET TITLE C100 COVER SHEET C101 GENERAL INFORMATION PLAN C102 EXISTING CONDITIONS PLAN C103 MAINTENANCE OF TRAFFIC PLAN C201 SITE PLAN C301 GRADING PLAN C401 SITE UTILITY PLAN C402 STORM PLAN & PROFILE C403 STORM PLAN & PROFILE C501 INITIAL CONTROLS SWPPP C502 MASS GRADING & CONSTRUCTION SWPPP C503 POST CONSTRUCTION SWPPP C504 SWPPP NARRATIVE C505 EROSION CONTROL DETAILS C801 GENERAL DETAILS C802 GENERAL DETAILS C803 CURB RAMP DETAILS C804 SANITARY SERVICE DETAILS C805 WATER SERVICE DETAILS C901 GENERAL SPECIFICATIONS C902 CARMEL CURB & PAVEMENT SPECS L101 LANDSCAPE PLAN & DETAILS