HomeMy WebLinkAboutC100 COVER SHEETPROJECT NO.
CHECK:DRAWN:
PLAN DATE:
DESIGN:
STATE OF
No.
PE10707583 OO14020 Mississinewa Drive
Carmel, Indiana 46033
P: 317.324.8695 F: 317.324.8717
www.Fritz-Eng.com
ashton@Fritz-Eng.com
Fritz Engineering
Services, LLC
REVISIONS AND ISSUES BYDATE
CLIENT:
PROJECT:
PROJECT LOCATION:
PROJECT TEAM:
SECTION, TOWNSHIP, RANGE:
THE
AVENUE
AT BENNETT FARM
JDF DEVELOPMENT
11710 PEBBLEPOINTE PASS
CARMEL, INDIANA 46033
11/18/2020
200905
11100 & 11150 N. MICHIGAN RD.
CARMEL, INDIANA 46077
HAMILTON COUNTY
SW 1
4, S6, T17N, R3E
SHEET NAME
SHEET NO.
JDF DEVELOPMENT
11710 PEBBLEPOINTE PASS
CARMEL, INDIANA 46033
Contact Person: Joe Farr
317-509-7388
jfarr@jdfdevelopment.com
CONSTRUCTION PLANS FOR:
THE AVENUE
AT BENNETT FARM
11100 & 11150 N. MICHIGAN RD.
CARMEL, CLAY TOWNSHIP, HAMILTON COUNTY, INDIANA
SECTION 6, TOWNSHIP 17N, RANGE 3E
SITE VICINITY & ZONING MAP
FLOOD ZONE:
The project site is located within the FEMA Community Panel Map
#18011C0353E dated January 18, 2012 and #18057C0205G
dated November 19, 2014. Review of the map indicates the site is
located within the Flood Designations 'Zone X' (unshaded). The
proposed buildings and improvements are located in Zone X
Unshaded and are therefore not subject to Flood Control
Ordinance requirements.
SITE LOCATION
2.0 Acres
Zoned: B3 SITE DATA:
TOTAL SITE ACREAGE - 2.07 AC
TOTAL ACREAGE OF DISTURBANCE - 1.7 AC
GROSS SQUARE FOOTAGE OF BUILDING
MULTI-TENANT- 11,000 SF
DRIVE THROUGH RESTAURANT TENANT - 2,000 SF
PROPOSED CONSTRUCTION START - FEBRUARY 1, 2021
PROPOSED CONSTRUCTION END - NOVEMBER 1, 2021
WORK IS SCHEDULED TO BE COMPLETED IN ONE CONTINUOUS
CONSTRUCTION PHASE
SETBACKS:REQUIRED PROVIDED
FRONT YARD 30 FT (MICHIGAN)91.4 FT
60 FT (BENNETT)95.2 FT
60 FT (REDD RD)38.3 FT (VARIANCE REQUESTED)
SIDE YARD 0 FT 66.1 FT (SOUTH)
REAR YARD 30 FT N/A (NO REAR YARD)N
C100
COVER SHEET
1. REV PER CARMEL TAC 2/11/2021
2. ISSUED FOR BID 2/26/2021
3. REV. PER CARMEL CMMTS 3/9/2021
4.REV NORTH DR/PARKING 3/28/2021
AF
AF
AF
AF
AF AF KG
1.The construction plans shall govern over any other form of media, which includes digital files of this project.
2.The contractor shall be responsible for obtaining or verifying that all permits and approvals are obtained from the respective city, county,
state & federal agencies prior to starting construction.
3.It shall be the contractors responsibility to determinate the exact location of all existing utilities in the vicinity of the construction area prior to
starting construction. Once all utilities have been located, it will be the contractor's responsibility to maintain in service all existing utilities
encountered during construction unless otherwise indicated in the construction drawings.
4.Before working with or around existing utilities, the applicable utility company shall be contacted by the contractor. It shall be the
contractor's responsibility to notify and coordinate construction with all respective utilities.
5.All construction methods and materials must conform to current standards and specifications for the governing municipality requirements.
6.Maintenance of traffic needed for this project shall be installed and maintained per INDOT specifications and the indiana MUTCD Manual.
7.The contractor shall be responsible for all field dimensions and shall verify all dimensions on the site prior to start of construction. If any
discrepancies are found in these plans from actual field conditions, the contractor shall notify the engineer immediately.
8.All quantities given on these construction plans or in the scope of work section are estimates and shall be confirmed by the bidding
contractors.
9.It shall be the responsibility of the developer and contractor to maintain quality control throughout this project.
10.Bearings, dimensions, and easements are shown for reference only. See record surveys and plats for exact information.B3
MULTI-FAMILY
ZIONSVILLE
N
SITE LOCATION MAP
SITE LOCATION
NOT TO SCALE
HEN
D
RI
C
KS
MARION
MORGAN
SHELBY
JOHN
S
O
N
BOONE
HAM
I
L
TO
N
CLINTON
MONT
G
O
ME
R
Y
BENCHMARK:
COORDINATE SYSTEM: US STATE PLANE 1983 (AT GROUND)
PROJECT DATUM: WORLD GEODETIC SYSTEM (WGS 1984)
VERTICAL DATUM NAVD 88
ZONE:INDIANA EAST 1301
GEOID MODEL: GEOID03 (CONUS)
COORDINATE UNITS US SURVEY FEET DISTANCE UNITS US SURVEY FEET
HEIGHT UNITS US SURVEY FEET USGS
BENCHMARK
BM 59 STP PROJECT NO. 9903 (020), ESTABLISHED BY BLN-4/2004. MINE
SPIKE & WASHER IN UTILITY POLE #898-6379 AT THE NW CORNER OF 1 06TH
STREET AND US 421. ELEV. = 895. 17'
TBM
CUT "X" IN EASTERNMOST BONNET BOLT OF FIRE HYDRANT LYING WEST
OF US 421. SOUTH OF BENNETT PARKWAY.
ELEV.=901.56'
CARMEL UTILITIES
30 West Main Street
Carmel, IN 46032
(317) 571-2442
(Customer Service)
CITIZEN'S ENERGY GROUP
2150 Dr. Martin Luther King Jr.
Street
indianapolis, IN 46202
(317) 263-6418
CARMEL DEPARTMENT OF
COMMUNITY SERVICES
1 Municipal Drive
Carmel, IN 46032
(317) 571-2417
DUKE ENERGY
100 South Mill Creek Road
Noblesville, Indiana 46060
(317) 776-5365
VECTREN
16000 Allisonville Road
Noblesville, Indiana 46061
(317) 776-5532
CARMEL DEPARTMENT OF
ENGINEERING
1 Municipal Drive
Carmel, IN 46032
(317) 571-2411
COMCAST
5330 E. 65th Street
Indianapolis, IN 46220
(317) 774-3384
TRICO REGIONAL WASTE
10701 N College Ave, Suite A
Indianapolis, IN 46280
CITY OF CARMEL CONSTRUCTION STANDARDS AND
SPECIFICATIONS, LATEST EDITION, TO BE USED AS SUPPLEMENTAL
INFORMATION WITH THESE PLANS.
INDIANA STATE DEPARTMENT OF TRANSPORTATION STANDARD
SPECIFICATIONS, LATEST EDITION, TO BE USED AS SUPPLEMENTAL
INFORMATION WITH THESE PLANS.
CARMEL ENGINEERING DEPARTMENT NOTE:
ALL PAVING WITHIN THE EXISTING AND PROPOSED CITY RIGHT-OF-WAY SHALL CONFORM TO THE
REQUIREMENTS OF THE DEPARTMENT OF ENGINEERING. THE CONTRACTOR SHALL CONTACT THE
DEPARTMENT OF ENGINEERING TO SCHEDULE A PRE-CONSTRUCTION MEETING TO REVIEW THE
DEPARTMENT'S CONSTRUCTION REQUIREMENTS, STAFF NOTIFICATION REQUIREMENTS, REQUIRED
INSPECTIONS FOR CERTAIN STAGES OF THE WORK AND TO REVIEW THE AUTHORITY OF THE DEPARTMENT AS
IT RELATES TO WORK WITHIN THE EXISTING AND PROPOSED RIGHT-OF-WAY.
EXISTING RIGHT OF WAY NOTE:
DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL BE RESTORED/REPAIRED TO THE SATISFACTION OF THE
CITY AT THE COMPLETION OF THE PROJECT. THE CONTRACTOR IS ENCOURAGED TO INSPECT THE
RIGHT-OF-WAY WITH THE CITY PRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THE EXISTING
CONDITION OF THE RIGHT-OF-WAY.
B2
S1
CARMEL PETITION REFERENCE:
DOCKET NO. PZ-2020-00198 DP/ADLS: THE AVENUE AT BENNETT FARM.
DOCKET NO. PZ-2020-00206 ZW: 20' MAXIMUM BUILDING HEIGHT, 22'6” AND 22'4” REQUESTED.
DOCKET NO. PZ-2020-00207 ZW: 30' MINIMUM GREENBELT WIDTH REQUIRED, 28' REQUESTED.
DOCKET NO. PZ-2020-00208 ZW: NUMBER OF PARKING SPACES - 88 REQUIRED, 77 REQUESTED.
STORMWATER PERMIT:
PLANS PREPARED FOR:
OPERATING AUTHORITIES
GENERAL NOTES
SHEET LIST TABLE
SHEET
NUMBER SHEET TITLE
C100 COVER SHEET
C101 GENERAL INFORMATION PLAN
C102 EXISTING CONDITIONS PLAN
C103 MAINTENANCE OF TRAFFIC PLAN
C201 SITE PLAN
C301 GRADING PLAN
C401 SITE UTILITY PLAN
C402 STORM PLAN & PROFILE
C403 STORM PLAN & PROFILE
C501 INITIAL CONTROLS SWPPP
C502 MASS GRADING & CONSTRUCTION SWPPP
C503 POST CONSTRUCTION SWPPP
C504 SWPPP NARRATIVE
C505 EROSION CONTROL DETAILS
C801 GENERAL DETAILS
C802 GENERAL DETAILS
C803 CURB RAMP DETAILS
C804 SANITARY SERVICE DETAILS
C805 WATER SERVICE DETAILS
C901 GENERAL SPECIFICATIONS
C902 CARMEL CURB & PAVEMENT SPECS
L101 LANDSCAPE PLAN & DETAILS