HomeMy WebLinkAboutC500 - EROSION CONTROL PLANLD
LD
LD
PPST PPST
PPST PPST
PPST PPST
IPn
MON
MON
MON
MON
MON
MON
W
WW
W
W
W
W
W
W
W
PPST
PPST
PPST
RB-0
H
H
H
H
H
(1-sty block gas station)(concrete border)T
conc. conc. conc. conc. conc. conc. conc.grassgrassgrassgrassgrassgrassgrassgrassgrass
woodswoodsasphaltasphaltasphaltasphalt asphaltplanter12" rcp 4" pvc42" rcp42" rcp12" rcp12" rcp12" rcp
15" rcp15" cpp12"
r
c
p
42
"
r
cp
21" rcp
6"
v
c
p
2" pvc6" pvc4" pvc8" pvc3" pvc18" rcp12" rcp
192" cmp
12" rcp
3" pvc - forcemain
3" pvc - forcemain3"
p
v
c
-
f
o
r
c
e
m
a
i
nWESTFIELD BLVD116th STREET
EXISTING LEGEND
EROSION CONTROL LEGEND
C500
EROSION CONTROL
PLAN
PLOT DATE: 6/3/2019 10:01 PMPLOT SCALE: 1:2.5849EDIT DATE: 5/28/2019EDITED BY: SOLDFIELDDRAWING FILE: P:\2015\02458\D. Drawings\Civil\Construction Documents\Demolition Plans\2015.02458.CE.C500.ECP.DEMO.dwg7260 Shadeland Station | Indianapolis, Indiana 46256
TEL 317.547.5580 | FAX 317.543.0270
www.structurepoint.com
Project Number
CERTIFIED BY
ISSUANCE INDEX
DATE:
PROJECT PHASE:
REVISION SCHEDULE
NO.DESCRIPTION DATE
05/16/2019
DEMOLITION PLANS
2015.02458
The Corner
Retail Development
Demolition Plans
SW Corner of
116th Street &
Rangeline Road
Carmel, Indiana