Loading...
HomeMy WebLinkAboutENGINEERS ESTIMATE - EROSION CONTROLASI Project No.: Date: $0.07 $10,931.76 SILT FENCE INLET PROTECTION 5.00 EA $210.00 $1,050.00 ESTIMATED EROSION CONTROL PROBABLE COST Total: $23,743.00 2015.02458 6/3/2019 EROSION CONTROL BOND ESTIMATE 116th and Rangeline - Demolition Plans ESTIMATED EROSION CONTROL ENGINEER'S OPINION OF CONSTRUCTION COST 110% of Estimate: $26,117.30 EROSION CONTROL 1,708.00 LFT $2.00 $3,416.00 $23,742.26EROSION CONTROL SUBTOTAL: EROSION CONTROL BLANKET WITH NATIVE PLANTINGS 2,283.00 SYS $1.75 $3,995.25 $22.50CONSTRUCTION ENTRANCE 193.30 TON $4,349.25 PERMANENT SEEDING AND STRAW 156,168.00 SFT