Loading...
HomeMy WebLinkAboutC300 Storm Water Poll. & Prev. Plan-C300P.W.P. P.W.P. P.W.P. P.W.P.P.W.P.S00°20'13"W 2631.74'E. LINE, SE. 1/4, SEC. 34, T.18N., R.3E.TC=860.88' IE N. 18" PVC=839.99' IE S. 18" PVC=839.91' TC=857.24' IE N. & S. 18" PVC=838.99' IE 12" CMP=855.77'IE 12" CMP=855.94' FOUND REBAR W/ CAP STAMPED "WEIHE" 0.3' N. & 24.8' W. OF COR.ASPHALTCLARI A N H E A L T H PARTN E R S, I N C . INSTR. N o. 2 0 0 3 - 9 2 2 1 3 12'11'88.0'9'WOODED AREA SPRING MILL ROAD(PUBLIC - VARIABLE R/W)21.0' PAVEMENT WIDTH CULTIVATED FIELD ASPHALTASPHALTONE STORY WOOD FRAME & LIMESTONE HOUSE WOOD SHED WOOD SHED 860.81860.81860.57 T.P.860.60860.88860.54860.84860.12860.33859.49859.69858.75858.23858.34858.00857.84857.76857.93 857.99858.16858.52P.W.P. EOH_E 139 856.50 M M 858.85P.W.P.859.20857.73857.45858.89P.W.P.857.12857.49 E R H U N E L A N E V E HAMLET DRIVEOTTO LANEEX. MH. #JG839 T.C.=855.69 8" S.D.R. 35 P.V.C N INV.=844.18 8" S.D.R. 35 P.V.C E INV.=844.08 EX. MH. #JG838 T.C.=857.74 8" S.D.R. 35 P.V.C W INV.=842.47 8" S.D.R. 35 P.V.C N INV.=842.37 EX. MH. #JG840 T.C.=856.93 8" S.D.R. 35 P.V.C N INV.=845.73 8" S.D.R. 35 P.V.C W INV.=845.81 8" S.D.R. 35 P.V.C S INV.=845.63 EX. MH. #JG847 T.C.=857.31 8" S.D.R. 35 P.V.C W INV.=847.53 8" S.D.R. 35 P.V.C S INV.=847.33 10' B.L. VAR. R.D.E.&U.E.&P.A.E. &S.S.E.&L.M.A.E.&B.M.P.E. VAR. D.&U.E. & L . M . A . E . VAR. D.&U.E.&L . M . A . E .10' B.L.50' 1/2 R/W13' B.L. & D.U.&S.S.E.15' B.L.15' B.L.10' B.L.10' B.L.5' N.A.E.5' N.A.E.10' B .L.10' U.E.30' R.D.E.&U.E.15' D.&U.E.15' D.&U.E.30' R.D.E.10' D .&U .E. 10' D&U.E.6' B.L.6' B.L.6' B.L.6' B.L.6' B.L.6' B.L.6' B.L.SEA BIRD WA Y SIGILARY WAYEXISTING HAMLET BMP DRY DETENTION BASIN 2 YEAR=852.14 10 YEAR=853.10 100 YEAR=854.63 TOP OF BANK=854.8 EX. MH. #JG837 T.C.=857.18 ADJUST TC=858.10 8" S.D.R. 35 P.V.C S INV.=841.28 10" S.D.R. 35 P.V.C E INV.=841.08 EX. 10' PATHEX. 10' PATH854.85854.40 85 5 . 1 1 855.52855.07854.70854.55 854.258 5 4 .10855. 18 856.09 Z ZSF SF SF SF SF SFSFSFSFSFSFSF SF SF SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSF SF SF SF EX. 50' 1/2 R/W EX. 58' R/W50' R/W CONSTRUCTION DUMPSTER CONCRETE WASH OUT AREA FUEL OIL TAN (DOUBLE WALL) PORT-O-LET EARTHWORK CONTRACTOR SHALL INSTALL 20' x 150' MIN. STONE ACCESS DRIVE PRIOR TO CONSTRUCTION. POSTING SIGN LOCATION DATEMARKREVISIONSBYCERTIFIED:S & A JOB NO. SHEET NO. DRAWN BY:CHECKED BY:THIS DRAWING IS NOT INTENDED TO BE REPRESENTED AS A RETRACEMENT OR ORIGINAL BOUNDARY SURVEY, A ROUTE SURVEY OR A SURVEYOR LOCATIONREPORT.S T O E P P E L W E R T HA L W A Y S O N7965 East 106th Street, Fishers, IN 46038-2505phone: 317.849.5935 fax: 317.849.5942INTIAL STORM WATER POLL. & PREV. PLANC300 40'20'40'0 1" = 40 FT 60160HAM-S2THE HAMLET at JACKSONS GRANTADG BAH CARMELHAMILTON COUNTY, INDIANA01/16/19DP IT E S G E E O TS R P RTE WLE D E HVADIRJ .ADNINAI EEG NIRENOILA NS FEPRO STATE OF S SECTION 2File Name:S:\60160HAM-S2\DWG\C300 Storm Water Poll. & Prev. Plan.dwg - C300Modified / By:July 1, 2019 1:53:36 PM / kmitchellPlotted / By:July 1, 2019 2:10:54 PM / Kenny Mitchell03/12/19JAWREVISED PER TAC COMMENTSAPPROVAL PENDING - NOT FOR CONSTRUCTION07/01/19KJJMMOVED SANITARY STRUCTURE #JGH202PERSON ONSITE RESPONSIBLE FOR EROSION CONTROL: DOUG WAGNER PHONE: (317) 770-1818 LEGEND Denotes Silt Fence Denotes Construction Limits Temporary "Coconut Fiber Mat" or Below Grade " Drop Inlet Protection Basket" Temporary "Drop Inlet Protection Basket", "Sediment Control Devices" SF SF SF NO EARTH DISTURBING ACTIVITIES MAY TAKE PLACE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT. ANY DISCHARGE OF CONTAMINATED WATER DUE TO DEWATERING SHALL OUTLET THROUGH EXISTING VEGETATION OR FILTER BAGS THAT WILL NOT ADVERSELY IMPACT STORM WATER QUALITY. NOTE: 1. ANY ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED IN THE FIELD BY THE INSPECTOR. 2. IF SITE REMAINS INACTIVE FOR A PERIOD OF 2 WEEKS, THEN STABILIZATION IS REQUIRED TO TAKE PLACE IN THE FORM OF TEMPORARY SEEDING, MULCH, OR SPRAY ON POLYMER. CONSTRUCTION SEQUENCE 1.The contractor shall schedule a Pre-construction meeting with the City of Carmel prior to any constructing on the site being started. The contractor and/or developer shall notify IDEM and the City of Carmel 48 hours prior to start of construction. 2.Following the required pre-construction meeting the contractor shall construct the “posting information center” on the Northeast side of the proposed construction entrance. The location of the posting information center is shown on Sheet C300&C301. The posting information center is the location where a copy of the approved IDEM Rule 5 Permit, Approved SWPP Plan, signed O&M Manual and Maintenance Logs are to be located. The contractor shall proceed to construct the construction entrance after all posting requirements have been met. 3.Immediately following the installation of the construction entrance, the contractor shall construct the maintenance and refueling area. Please refer to the maintenance and refueling area detail on Sheet C304. 4.After the maintenance and refueling area is constructed, the contractor shall construct the concrete washout area per the specifications on Sheet C304. Concrete washout shall not be required if concrete truck is equipped with self-contained chute system, similar to system provided by Enviroguard, or approved equal. 5.Prior to any earth moving the contractor shall install all silt fence as shown on Sheet C300-C302. The details and specifications for silt fence installation are located on Sheet C304. 6.The contractor shall protect all existing inlets with drop inlet protection baskets and/or fiber mats as shown on Sheet C300-C302. The details and specifications for the drop inlet baskets and fiber mats on Sheet C304. 7.When the “existing” site/construction limits are completely stabilized, the contractor shall proceed to grade the site. The material to grade the site shall be excavated per the proposed cut & fills as shown on Sheet C200-C201. 8.Contractor shall cut proposed swales. 9.Upon completion of swales the contractor shall install the proposed erosion control blanket in all swales as shown on Sheet C302. The details and specifications for the erosion control blanket can be found on Sheet C305. 10.The proposed storm sewer and sanitary sewer shall be installed concurrently with each other when crossings are encountered. 11.The contractor shall prepare the sub-grade for the proposed road system. If lime stabilization is the method chosen, dust shall be kept to a minimum. Dust shall be removed from the construction vehicles prior to leaving the site. 12.Contractor shall install all concrete curb. 13.Contractor shall install water main. The trench area shall be seeded and mulched immediately following the installation of the water main. 14.Contractor shall have all other appropriate utilities installed. It is ultimately the responsibility of the contractor to ensure that the trench area is seeded and mulched immediately following the installation of each utility. 15.Contractor shall install all asphalt pavement. 16.The contractor shall permanent seed all areas between the back of curb and the constructed pads and all other areas that are illustrated on Sheets C302. The seed mixture and rate can be found on Sheet C304. 17.The contractor shall schedule a site inspection with the City of Carmel to ensure that the site is stabilized. After the inspector approves the site conditions the contractor shall remove all temporary erosion control practices. 18.The post-construction erosion control practices then become the responsibility of the developer of this project. 19.The developer of this project shall continue to monitor this site for good house keeping on the post-construction BMP's until a NOT is filed with IDEM. 20.The O&M Manual for this project will have to be transferred to the HOA before the NOT can be released for this project.