HomeMy WebLinkAboutTom Wood Subaru Annex Full SetVAN
PROPOSED BUILDING ADDITIONFFE=757.70 (MATCH EXISTING)
VAN
NORTH
TITLE SHEETC000JARBEBNTS
01
8
A
B
3 4 5 6 7 12
C
D
E
F
G
H
8 3 4 5 6 7 12
A
B
C
D
E
F
G
H DESCRIPTIONDATENOREVISION RECORDDATE:DWG SCALE:DRAWN BY:CHECKED BY:APPROVED BY:PROJECT NO:SHEET OF
DRAWING NO.:318-454MAY 5, 2022DRAFT11GIBSON COMMERCIAL CONSTRUCTIONTOM WOOD POWERSPORTS3400 E. 96TH STREETCARMEL, INDIANA 46032530 E. Ohio Street · Suite G - Indianapolis, IN 46204317-655-7777 · 877-746-0749www.cecinc.comPROF
ESSIONAL E N G INEERINDIA N AAARONC. H
U
RTPE10300058
STATE OF
-oN
R E G ISTERE
D
* HAND SIGNATURE ON FILEADDITIONAL CITY OF CARMEL NOTES:
TOM WOOD MOTORSPORTS
3400 E. 96TH STREET
CARMEL, INDIANA 46032
ADLS SUBMITTAL - CYCLE 4
MAY 5, 2022
SITE
PRIORITY WAY W. DROPERATING AUTHORITY
CITY OF CARMELPARKING DATA:
ZONING DATA: ADJACENT ZONING CLASSIFICATIONS:
ZONING DATA: EXISTING ZONING CLASSIFICATION:
SITE DATA:
SITE DATA:
BUILDING DATA:
LOT COVERAGE
E 96TH STREET ENTERPRISEDRIVEKEYSTONE PKWYFLOOD INFORMATION NOTE:ARONSON RDOWNER
TOM WOOD SUBARU
3300 E. 96TH STREET
CARMEL, INDIANA 46032
PH: (317) 805-7775
CONTRACTOR
GIBSON COMMERCIAL
CONSTRUCTION
3024 RIDGEVIEW DRIVE
INDIANAPOLIS, INDIANA 46226
PH: (317) 213-0819
CONTACT: JAKE GIBSON
EMAIL: jgibson@gibsoncommercial.com
ARCHITECT
US ARCHITECTS
9200 W. SMITH STREET
YORKTOWN, INDIANA 47396
PH:(765) 405-1220
CONTACT: KARL FETTIG
EMAIL: kfettig@usarchitectsmuncie.com
CIVIL ENGINEER
CIVIL & ENVIRONMENTAL
CONSULTANTS, INC.
530 E. OHIO ST., STE. G
INDIANAPOLIS, IN 46204
PH: (317) 655-7777
CONTACT: AARON HURT
EMAIL: ahurt@cecinc.com
SURVEYOR
CIVIL & ENVIRONMENTAL
CONSULTANTS, INC.
530 E. OHIO ST., STE. G
INDIANAPOLIS, IN 46204
PH: (317) 655-7777
CONTACT: ANTHONY SYERS
EMAIL: asyers@cecinc.com
PROJECT TEAM:
GAS
TELEPHONE
STREETS
STORM SEWER
WATER
ELECTRIC
SANITARY SEWER
LIST OF CONTACTS:
HORIZONTAL & VERTICAL DATUM:
UTILITY NOTE:
LOCATION MAP
SITE
U.S.G.S. MAP
NORTH
SITE MAP
DRAWING INDEX
SHEET NO.SHEET TITLE DRAWING
NO.
01 TITLE SHEET C000
02 EXISTING CONDITIONS & PRE-DEVELOPMENT STORMWATER PREVENTION PLAN C100
03 DEMOLITION PLAN C101
04 SITE LAYOUT PLAN C200
05 GRADING PLAN C300
06 SITE LANDSCAPE PLAN C700
07 SITE DETAILS C800
08 SITE DETAILS C801
09 STORMWATER POLLUTION & PREVENTION PLAN C900
10 STORMWATER POLLUTION & PREVENTION PLAN DETAILS C901
11 STORMWATER POLLUTION & PREVENTION PLAN NOTES C902
05/11/22
ENTERPRISE DRIVE96TH STREET
ADJOINER
ADJOINER
SUBJECT PARCEL
ADJOINERADJOINER PROPOSED LEGEND:
HORIZONTAL & VERTICAL DATUM:
UTILITY NOTE:
NORTH
8
A
B
3 4 5 6 7 12
C
D
E
F
G
H
8 3 4 5 6 7 12
A
B
C
D
E
F
G
H DESCRIPTIONDATENOREVISION RECORDDATE:DWG SCALE:DRAWN BY:CHECKED BY:APPROVED BY:PROJECT NO:SHEET OF
DRAWING NO.:318-454MAY 5, 2022DRAFT11GIBSON COMMERCIAL CONSTRUCTIONTOM WOOD POWERSPORTS3400 E. 96TH STREETCARMEL, INDIANA 46032530 E. Ohio Street · Suite G - Indianapolis, IN 46204317-655-7777 · 877-746-0749www.cecinc.comPROF
ESSIONAL E N G INEERINDIA N AAARONC. H
U
RTPE10300058
STATE OF
-oN
R E G ISTERE
D
* HAND SIGNATURE ON FILEEXISTING CONDITIONS &PRE-DEVELOPMENT STORMWATERPREVENTION PLANC100JARBEB1" = 20'02
GENERAL NOTES
ADDITIONAL CITY OF CARMEL NOTES:
05/11/22
ENTERPRISE DRIVE96TH STREET
ADJOINER
ADJOINER
SUBJECT PARCEL
ADJOINERADJOINER DEMOLITION LEGEND:
1
2
3
4
5
6
7
8
DEMOLITION ITEMS:
NORTH
8
A
B
3 4 5 6 7 12
C
D
E
F
G
H
8 3 4 5 6 7 12
A
B
C
D
E
F
G
H DESCRIPTIONDATENOREVISION RECORDDATE:DWG SCALE:DRAWN BY:CHECKED BY:APPROVED BY:PROJECT NO:SHEET OF
DRAWING NO.:318-454MAY 5, 2022DRAFT11GIBSON COMMERCIAL CONSTRUCTIONTOM WOOD POWERSPORTS3400 E. 96TH STREETCARMEL, INDIANA 46032530 E. Ohio Street · Suite G - Indianapolis, IN 46204317-655-7777 · 877-746-0749www.cecinc.comPROF
ESSIONAL E N G INEERINDIA N AAARONC. H
U
RTPE10300058
STATE OF
-oN
R E G ISTERE
D
* HAND SIGNATURE ON FILEDEMOLITION PLANC101JARBEB1" = 20'03
GENERAL DEMOLITION NOTES:
SWPP NOTE:
05/11/22
ENTERPRISE DRIVE96TH STREET
PROPOSED BUILDING ADDITION
FFE=757.70 (MATCH EXISTING)
VAN
PROPOSED SITE KEY NOTES:
SITE LEGEND:
NORTH
GENERAL SITE NOTES:
GENERAL SITE LAYOUT NOTES:
8
A
B
3 4 5 6 7 12
C
D
E
F
G
H
8 3 4 5 6 7 12
A
B
C
D
E
F
G
H DESCRIPTIONDATENOREVISION RECORDDATE:DWG SCALE:DRAWN BY:CHECKED BY:APPROVED BY:PROJECT NO:SHEET OF
DRAWING NO.:318-454MAY 5, 2022DRAFT11GIBSON COMMERCIAL CONSTRUCTIONTOM WOOD POWERSPORTS3400 E. 96TH STREETCARMEL, INDIANA 46032530 E. Ohio Street · Suite G - Indianapolis, IN 46204317-655-7777 · 877-746-0749www.cecinc.comPROF
ESSIONAL E N G INEERINDIA N AAARONC. H
U
RTPE10300058
STATE OF
-oN
R E G ISTERE
D
* HAND SIGNATURE ON FILESITE LAYOUT PLANC200JARBEB1" = 20'04
PARKING DATA:
ZONING DATA: ADJACENT ZONING CLASSIFICATIONS:
ZONING DATA: EXISTING ZONING CLASSIFICATION:
SITE DATA:
SITE DATA:
BUILDING DATA:
LOT COVERAGE
05/11/22
ENTERPRISE DRIVE96TH STREET
PROPOSED BUILDING ADDITION
FFE=757.70 (MATCH EXISTING)
VAN
PROPOSED SITE KEY NOTES:
SITE LEGEND:
NORTH
GENERAL SITE NOTES:
GENERAL SITE LAYOUT NOTES:
8
A
B
3 4 5 6 7 12
C
D
E
F
G
H
8 3 4 5 6 7 12
A
B
C
D
E
F
G
H DESCRIPTIONDATENOREVISION RECORDDATE:DWG SCALE:DRAWN BY:CHECKED BY:APPROVED BY:PROJECT NO:SHEET OF
DRAWING NO.:318-454MAY 5, 2022DRAFT11GIBSON COMMERCIAL CONSTRUCTIONTOM WOOD POWERSPORTS3400 E. 96TH STREETCARMEL, INDIANA 46032530 E. Ohio Street · Suite G - Indianapolis, IN 46204317-655-7777 · 877-746-0749www.cecinc.comPROF
ESSIONAL E N G INEERINDIA N AAARONC. H
U
RTPE10300058
STATE OF
-oN
R E G ISTERE
D
* HAND SIGNATURE ON FILESITE LAYOUT PLANC200JARBEB1" = 20'04
PARKING DATA:
ZONING DATA: ADJACENT ZONING CLASSIFICATIONS:
ZONING DATA: EXISTING ZONING CLASSIFICATION:
SITE DATA:
SITE DATA:
BUILDING DATA:
LOT COVERAGE
05/11/22
ENTERPRISE DRIVE96TH STREET
PROPOSED BUILDING ADDITION
FFE=757.70 (MATCH EXISTING)
VAN
MLAG = 755.59
MFPG = 755.59
GRADING LEGEND:
NORTH
8
A
B
3 4 5 6 7 12
C
D
E
F
G
H
8 3 4 5 6 7 12
A
B
C
D
E
F
G
H DESCRIPTIONDATENOREVISION RECORDDATE:DWG SCALE:DRAWN BY:CHECKED BY:APPROVED BY:PROJECT NO:SHEET OF
DRAWING NO.:318-454MAY 5, 2022DRAFT11GIBSON COMMERCIAL CONSTRUCTIONTOM WOOD POWERSPORTS3400 E. 96TH STREETCARMEL, INDIANA 46032530 E. Ohio Street · Suite G - Indianapolis, IN 46204317-655-7777 · 877-746-0749www.cecinc.comPROF
ESSIONAL E N G INEERINDIA N AAARONC. H
U
RTPE10300058
STATE OF
-oN
R E G ISTERE
D
* HAND SIGNATURE ON FILEGRADING PLANC300JARBEB1" = 20'05
ADDITIONAL CITY OF CARMEL NOTES:
GENERAL GRADING NOTES:
”
05/11/22
ENTERPRISE DRIVE96TH STREET
PROPOSED BUILDING ADDITION
FFE=757.70 (MATCH EXISTING)
VAN
FN
TM
1
FN
TM
3
FN
CA
3
FN
CE
5
FN
HH
6
FN
JV
4
FN
JV
4
FN
CE
2
FN
DL
2
FN
DL
2
FN
DL
3
FN
CA
5
FN
CA
5
IN
JV
4
IN
CA
5
IN
CA
5
FN
HH
9
IN
SO
7
IN
RH
7
IN
AM
1
IN
RH
9
IN
TM
4
IN
TM
4
IN
AN
5
NORTH
8
A
B
3 4 5 6 7 12
C
D
E
F
G
H
8 3 4 5 6 7 12
A
B
C
D
E
F
G
H
DESCRIPTIONDATENOREVISION RECORDDATE:DWG SCALE:DRAWN BY:CHECKED BY:APPROVED BY:PROJECT NO:SHEET OF
DRAWING NO.:318-454MAY 5, 2022DRAFT11GIBSON COMMERCIAL CONSTRUCTIONTOM WOOD POWERSPORTS3400 E. 96TH STREETCARMEL, INDIANA 46032530 E. Ohio Street · Suite G - Indianapolis, IN 46204317-655-7777 · 877-746-0749www.cecinc.comPROF
ESSIONAL E N G INEERINDIA N AAARONC. H
U
RTPE10300058
STATE OF
-oN
R E G ISTERE
D
* HAND SIGNATURE ON FILESITE LANDSCAPE PLANC700BRFBEB1" = 20'06
GENERAL LANDSCAPE NOTES:
ADDITIONAL CITY OF CARMEL LANDSCAPE NOTES:
DESCRIPTIONSYMBOL FN
AR
1 PLANT QUANTITY
PLANT TYPE
REQ. LOCATION
FOUNDATION REQUIRED PLANTINGSFN
OVERALL PLANTING SCHEDULE
PERENNIALS/ GRASSES SCHEDULE
Tree/ SHRUB SCHEDULE
DETAIL 700 - STONE MULCH DETAIL
05/11/22
SITE DETAILSC800JARBEBNTS
01
8
A
B
3 4 5 6 7 12
C
D
E
F
G
H
8 3 4 5 6 7 12
A
B
C
D
E
F
G
H DESCRIPTIONDATENOREVISION RECORDDATE:DWG SCALE:DRAWN BY:CHECKED BY:APPROVED BY:PROJECT NO:SHEET OF
DRAWING NO.:318-454MAY 5, 2022DRAFT11GIBSON COMMERCIAL CONSTRUCTIONTOM WOOD POWERSPORTS3400 E. 96TH STREETCARMEL, INDIANA 46032530 E. Ohio Street · Suite G - Indianapolis, IN 46204317-655-7777 · 877-746-0749www.cecinc.comPROF
ESSIONAL E N G INEERINDIA N AAARONC. H
U
RTPE10300058
STATE OF
-oN
R E G ISTERE
D
* HAND SIGNATURE ON FILEDETAIL 210 - LAP JOINT DETAILDETAIL 209 - PAVEMENT SAWCUT
DETAIL 203 - CONCRETE JOINT DETAILS
DETAIL 205 - ASPHALT PAVEMENT SECTION
DETAIL 206 - CURB JOINT DETAIL
DETAIL 201 - BIKE RACK
DETAIL 202 - BICYCLE HOOP DETAIL
DETAIL 208 - SIDEWALK ADJACENT TO CURB DETAIL
DETAIL 207 - CONCRETE SIDEWALK DETAILDETAIL 204 - STRAIGHT CONC. CURB DETAIL
05/11/22
SITE DETAILSC801JARBEBNTS
01
8
A
B
3 4 5 6 7 12
C
D
E
F
G
H
8 3 4 5 6 7 12
A
B
C
D
E
F
G
H DESCRIPTIONDATENOREVISION RECORDDATE:DWG SCALE:DRAWN BY:CHECKED BY:APPROVED BY:PROJECT NO:SHEET OF
DRAWING NO.:318-454MAY 5, 2022DRAFT11GIBSON COMMERCIAL CONSTRUCTIONTOM WOOD POWERSPORTS3400 E. 96TH STREETCARMEL, INDIANA 46032530 E. Ohio Street · Suite G - Indianapolis, IN 46204317-655-7777 · 877-746-0749www.cecinc.comPROF
ESSIONAL E N G INEERINDIA N AAARONC. H
U
RTPE10300058
STATE OF
-oN
R E G ISTERE
D
* HAND SIGNATURE ON FILEDETAIL 215 - CONCRETE WHEEL STOP
DETAIL 216 - ADA ACCESSIBLE PARKING STALLS
DETAIL 214 - SIGNAGE DETAIL
DETAIL 217 - PAINTED ADA ACCESSIBLE SYMBOL DETAIL
NOT TO SCALE
ARMOR-TILE TACTILE SYSTEM
DETAIL 213 - DETECTABLE WARNING STRIP DETAIL
DETAIL 211 - TREE PLANTING DETAIL
DETAIL 212 - SHRUB PLANTING DETAIL ”DETAIL 218 - PERMEABLE PAVER SECTION
Maximum Slope = 0.5%
( Preferably Flat )
05/11/22
PROPOSED LEGEND:
PROPOSED BUILDING ADDITION
FFE=757.70 (MATCH EXISTING)
VAN ENTERPRISE DRIVE96TH STREET
ADJOINER
ADJOINER
ADJOINERADJOINERNORTH
8
A
B
3 4 5 6 7 12
C
D
E
F
G
H
8 3 4 5 6 7 12
A
B
C
D
E
F
G
H DESCRIPTIONDATENOREVISION RECORDDATE:DWG SCALE:DRAWN BY:CHECKED BY:APPROVED BY:PROJECT NO:SHEET OF
DRAWING NO.:318-454MAY 5, 2022DRAFT11GIBSON COMMERCIAL CONSTRUCTIONTOM WOOD POWERSPORTS3400 E. 96TH STREETCARMEL, INDIANA 46032530 E. Ohio Street · Suite G - Indianapolis, IN 46204317-655-7777 · 877-746-0749www.cecinc.comPROF
ESSIONAL E N G INEERINDIA N AAARONC. H
U
RTPE10300058
STATE OF
-oN
R E G ISTERE
D
* HAND SIGNATURE ON FILESTORMWATER POLLUTION &PREVENTION PLANC900BEBACH1" = 20'09
GENERAL NOTES
ADDITIONAL CITY OF CARMEL NOTES:
SOIL MAP
SOILS MAP LEGEND
05/11/22
8
A
B
3 4 5 6 7 12
C
D
E
F
G
H
8 3 4 5 6 7 12
A
B
C
D
E
F
G
H DESCRIPTIONDATENOREVISION RECORDDATE:DWG SCALE:DRAWN BY:CHECKED BY:APPROVED BY:PROJECT NO:SHEET OF
DRAWING NO.:318-454MAY 5, 2022DRAFT11GIBSON COMMERCIAL CONSTRUCTIONTOM WOOD POWERSPORTS3400 E. 96TH STREETCARMEL, INDIANA 46032530 E. Ohio Street · Suite G - Indianapolis, IN 46204317-655-7777 · 877-746-0749www.cecinc.comPROF
ESSIONAL E N G INEERINDIA N AAARONC. H
U
RTPE10300058
STATE OF
-oN
R E G ISTERE
D
* HAND SIGNATURE ON FILESTORMWATER POLLUTION &PREVENTION PLAN DETAILSC901BEBACHAS SHOWN10
DETAIL 902 - TEMPORARY CONSTRUCTION ENTRANCE
DETAIL 907 - SILT FENCE
INSTALLATION DETAIL
DETAIL 904 - EROSION CONTROL INLET PROTECTION
FOR CURB INLET AND CATCH BASINS
DETAIL 901 - NON-PAVED AREA CATCH
BASIN INLET PROTECTION DETAIL
PLAN
SECTION B-B
NOT TO SCALE
DETAIL 906 - CONCRETE WASHOUT BMP
DETAIL 905 - BELOW GRATE INLET PROTECTION
DETAIL 903 - FILTER SOCK
PERMANENT SEEDING DATES
LAWNS AND HIGH MAINTENANCE AREAS
STEEP BANKS AND CUTS
LEVEL AND SLOPING, OPEN AREAS
TEMPORARY SEEDING
PERMANENT SEEDING
TEMPORARY SEEDING DATES
05/11/22
8
A
B
3 4 5 6 7 12
C
D
E
F
G
H
8 34 56 7 12
A
B
C
D
E
F
G
H DESCRIPTIONDATENOREVISION RECORDDATE:DWG SCALE:DRAWN BY:CHECKED BY:APPROVED BY:PROJECT NO:SHEET OF
DRAWING NO.:318-454MAY 5, 2022DRAFT11GIBSON COMMERCIAL CONSTRUCTIONTOM WOOD POWERSPORTS3400 E. 96TH STREETCARMEL, INDIANA 46032530 E. Ohio Street · Suite G - Indianapolis, IN 46204317-655-7777 · 877-746-0749www.cecinc.comPROF
ESSIONAL E N G INEERINDIA N AAARONC. H
U
RTPE10300058
STATE OF
-oN
R E G ISTERE
D
* HAND SIGNATURE ON FILESTORMWATER POLLUTION &PREVENTION PLAN NOTESC902BEBACHN/A11
(13) MATERIAL HANDLING AND SPILL PREVENTION
(4) POST CONSTRUCTION STORMWATER QUALITY
(3) STORMWATER QUALITY IMPLEMENTATION
(1) POTENTIAL LANDUSE POLLUTANTS
EROSION CONTROL MAINTENANCE REQUIREMENTS
K. MONITORING AND MAINTENANCE GUIDELINES
(2) LOCATION, DIMENSIONS, SPECIFICATIONS, AND CONSTRUCTION
DETAILS OF EACH STORMWATER QUALITY MEASURE
(10) LOCATION OF PROPOSED SOIL STOCKPILES
(12) EROSION CONTROL MEASURES FOR INDIVIDUAL BUILDING LOTS
SWPPP FOR POST CONSTRUCTION- CITY OF CARMEL
(3) ESTIMATED PEAK DISCHARGE
(7) POTENTIAL CONSTRUCTION POLLUTANTS
(2) RECEIVING WATERS
(1) HYDROLOGIC UNIT CODE
SWPPP FOR CONSTRUCTION SITES- CITY OF CARMEL
(5) LOCATION WHERE STORMWATER MAY BE DIRECTLY
DISCHARGED INTO GROUNDWATER
(4) LOCATION WHERE SPECIFIC POINTS OF STORMWATER
DISCHARGE LEAVING THE SITE
(8) TEMPORARY & PERMANENT STORMWATER QUALITY MEASURES
C. CONCENTRATED FLOW SEDIMENT CONTROL
B. SHEET FLOW SEDIMENT CONTROL
A. CONSTRUCTION ENTRANCE INFORMATION
(11-B) PERMANENT SURFACE STABILIZATION
(11-A) TEMPORARY SURFACE STABILIZATION
DESCRIPTION MEASURES:
D. INLET PROTECTION LOCATIONS AND SPECS.
E. RUNOFF CONTROL MEASURES
F. OUTLET PROTECTION SPECIFICATIONS
G. GRADE STABILIZATION MEASURES
H. STORMWATER QUALITY DETAILS
I. TEMPORARY SURFACE STABILIZATION
J. PERMANENT SURFACE STABILIZATION
(9) GENERAL CONSTRUCTION SEQUENCE
(5) POST CONSTRUCTION MAINTENANCE GUIDELINES
(14) CONTACT INFORMATION
(6) SOIL MAP
EROSION CONTROL RESPONSIBLE PERSON:
05/11/22