HomeMy WebLinkAboutC602 Storm PnPE
E
E E
E
E
E
E
E
E
E
E
E
EEEE
E
E
W(F)
W(F)
W(F)
W(F)
W(F)W(F)W(F)W(F)
W(F)
W(F)
W(F)
W(F)W(F)W(F)W(F)W(F)W(F)W(F)W(F)W(F)W(F)W(F)W(F)W(F)W(F)W(F)W(F)W(F)35,680 S.F.
FFE=900.50
MLAG/PAD=899.83
BUILDING #1
FFE=901.50
MLAG/PAD=900.83
FFE=901.50
MLAG/PAD=900.83
BUILDING #1
BUILDING #1
FFE=899.58FFE=899.
7
1 FFE=899.88FFE=899.63
SAN
DOLCE
D
R
I
V
EOCTAVE DRIVEOCTAVE DR
IVE
880885890895900905910915920925880885890895900905910915920925FINISHED GRADEEXISTING GRADEGRANULAR BACKFILLPROFILE LEGENDESANW(F)WENGINEERS 317 | 846 - 6611
800 | 452 - 6408
317 | 843 - 0546 fax
WEIHE
Land Surveying | Civil Engineering
Landscape Architecture
ALLAN H. WEIHE, P.E., L.S. - FOUNDER
10505 N. College Avenue
Indianapolis, Indiana 46280
weihe.netARIA APARTMENTS
APPRO
V
A
L
P
E
N
D
I
N
G
N
O
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
779 LENNOX COURTC602STORM SEWER PLAN & PROFILES PROJECT BENCHMARKDNR BM BOO 54, 1989IN BOONE COUNTY, CARMEL QUAD., IN THE NE ¼ OF SEC. 36,T. 18 N., R. 2 E., 2ND P.M.; ABOUT 1.0 MILE NORTHEAST OFZIONSVILLE; AT THE INTERSECTION OF DAUGHERTY DRIVEAND WEST 121ST STREET, IN THE NORTHEAST ¼ OF THEINTERSECTION, AT THE ENTRANCE TO THE EAGLE VILLAGESUBDIVISION; SET IN THE TOP OF A CONCRETE POST, 42.3FEET NORTHEAST OF AND ACROSS WEST 121ST STREETFROM A UTILITY POLE, 25.8 FEET NORTH OF THE CENTERLINEOF WEST 121ST STREET, 20.5 FEET WEST-NORTHWEST OF AMETAL TELEPHONE PEDESTAL, 20.2 FEET SOUTHWEST OF AWOOD FENCE END POST, 18.5 FEET EAST OF THE CENTERLINEOF DAUGHERTY DRIVE, 15.7 FEET NORTHWEST OF THE TOPOF THE CENTER OF A CMP CULVERT UNDER DAUGHERTYDRIVE, 15.4 FEET WEST OF THE SOUTHEAST CORNER OF ABRICK WALL, 10.1 FEET SOUTHWEST OF THE NORTHWESTCORNER OF A BRICK WALL, 5.8 FEET SOUTHWEST OF A METAL“DAUGHERTY DR” SIGN POST, LEVEL WITH THE GROUND; ADEPARTMENT OF NATURAL RESOURCES BRASS CONTROLSTATION TABLET, STAMPED "BOO 54 1989".ELEV.900.76 NAVD 88SITE TEMPORARY BENCHMARK1. CUT X ON THE NORTH BOLT OF A FIRE HYDRANT LOCATED47 FEET EAST OF THE NORTHWEST CORNER OF PARCEL I.ELEV.901.82 NAVD 882. RAILROAD SPIKE ON THE NORTH SIDE OF A UTILITY POLELOCATED ON THE EAST SIDE OF MICHIGAN ROAD 115 FEETNORTH AND 93 FEET EAST OF THE SOUTHEAST CORNEROF PARCEL I.ELEV.901.81 NAVD 88STORM SEWER NOTES1.THE CONTRACTOR SHALL ADHERE TO ALL TERMS AND CONDITIONS AS OUTLINED IN THE EPA ORAPPLICABLE STATE GENERAL N.P.D.E.S. PERMIT FOR STORMWATER DISCHARGE ASSOCIATED WITHCONSTRUCTION ACTIVITIES AND STORMWATER POLLUTION PREVENTION PLAN.2.REFER TO THE INDIANA DEPARTMENT OF TRANSPORTATION (INDOT) STANDARD SPECIFICATIONS,LATEST EDITION, FOR BASIC MATERIALS AND CONSTRUCTION METHODS. THE SECTIONS BELOW FORVARIOUS ITEMS ARE TO CLARIFY THE INTENT OF THE REQUIREMENTS FOR THIS PROJECT. PLEASENOTE THAT OTHER SECTIONS OF THE INDOT STANDARD SPECIFICATIONS MAY ALSO BE APPLICABLE.3.THE CONTRACTOR SHALL CONTACT APPLICABLE STATE UNDERGROUND LOCATION SERVICE AT LEAST72 HOURS PRIOR TO ANY WORK AND SHALL CONTACT THE OWNER AND/OR ENGINEER SHOULDUTILITIES APPEAR TO BE IN CONFLICT WITH THE PROPOSED IMPROVEMENTS. IT SHALL BE THERESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITHTHE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS.4.THE PLANS SHOW THE LOCATION OF ALL KNOWN UTILITIES LOCATED WITHIN THE LIMITS OFCONSTRUCTION ACCORDING TO INFORMATION PROVIDED BY THE VARIOUS UTILITY COMPANIES,PREVIOUS CONSTRUCTION PLANS AND AS EVIDENCED BY OBSERVATION OF ABOVE GROUNDCONDITIONS BY THE SURVEYOR. THE ACCURACY OF THIS INFORMATION IS NOT GUARANTEED.5.THE CONTRACTOR SHALL CONTACT ALL UTILITY COMPANIES TO LOCATE MAINS, CONDUITS, SERVICELINES, ETC. WITHIN THE CONSTRUCTION LIMITS. THE LOCATION AND PROTECTION OF UTILITYSTRUCTURES, THEIR SUPPORT AND MAINTENANCE DURING CONSTRUCTION (IN COOPERATION WITHAPPLICABLE UTILITY COMPANY) IS THE EXPRESSED RESPONSIBILITY OF THE CONTRACTOR.6.THE CONTRACTOR SHALL CONTACT ALL APPLICABLE UTILITIES AND VERIFY ANY AND ALL FEESASSOCIATED WITH THE INSTALLATION OF ALL UTILITIES.7.ALL CONSTRUCTION ON THIS SITE TO BE PERFORMED IN COMPLIANCE WITH O.S.H.A. STANDARDS FORWORKER SAFETY.8.ANY PART OF STORM SEWER TRENCHES RUNNING UNDER OR WITHIN 5' OF PAVEMENT TO BEBACKFILLED WITH GRANULAR MATERIAL.8.IT IS THE CONTRACTORS RESPONSIBILITY TO VERIFY LOCATION, SIZE, AND ELEVATION OF EXISTINGUTILITIES, STRUCTURES, PIPES, PAVEMENTS, ETC. AS RELATED TO THEIR WORK. NOTIFY ENGINEEROF ANY CONFLICT AND/OR DISCREPANCIES IN THE CONSTRUCTION DOCUMENTS.9.CLEARANCE BETWEEN STORM / SANITARY SEWER SYSTEMS AND DOMESTIC/FIRE LINE SERVICE,SHALL MAINTAIN 10' HORIZONTAL AND 18" VERTICAL.10.CONTRACTOR TO INSTALL CONCRETE CRADLES AT PIPE CROSSING WHEN THE VERTICAL SEPARATION(AS MEASURED FROM THE EXTERIOR OF THE PIPES) BETWEEN SANITARY SEWERS, WATER MAINS ANDSTORM SEWERS IS 18" OR LESS.11.SANITARY SEWER LINE IN PROXIMITY OF WATER LINE SHALL BE C900 WATER MAIN GRADE PVC.12.IF ANY EXISTING STRUCTURES TO REMAIN ARE DAMAGED DURING CONSTRUCTION, IT SHALL BE THECONTRACTOR'S RESPONSIBILITY TO REPAIR AND/OR REPLACE THE EXISTING STRUCTURE ASNECESSARY TO RETURN IT TO IT'S CONDITION PRIOR TO CONSTRUCTION.13.WHEN PERFORMING EXCAVATIONS DURING PERIODS OF WET WEATHER, PROVIDE ADEQUATEDEWATERING, DRAINAGE AND GROUND WATER MANAGEMENT TO CONTROL MOISTURE OF SOILS.14.COMPACTED "B" BORROW BACK FILL REQUIRED OVER ALL UTILITIES IN PAVED AREAS.15.ALL UTILITY STRUCTURES IN PAVED AREAS SHALL BE FLUSH WITH PAVEMENT AND SHALL HAVETRAFFIC BEARING RING AND COVERS.16.COORDINATE LOCATIONS AND CONNECTIONS OF BUILDING STORM LINES WITH PLUMBING DRAWINGS.17.FOLLOW ALL LOCAL AND STATE CODES IN REFERENCE TO STORM SEWER INSTALLATION.18.ALL EXISTING MANHOLE AND CATCH BASIN GRATES SHALL BE ADJUSTED TO NEW FINISH GRADEELEVATIONS.19.EXISTING PIPES WITHIN CONSTRUCTION LIMITS ARE TO BE CLEANED OUT TO REMOVE ALL SILT ANDDEBRIS.20.ALL STORM PIPE CONNECTIONS AT STRUCTURES SHALL BE GROUTED TO ASSURE CONNECTION ATSTRUCTURE IS WATERTIGHT.21.ALL STORM SEWER STRUCTURES IN PAVED AREAS SHALL BE FLUSH WITH PAVEMENT AND SHALL HAVETRAFFIC BEARING RING AND COVERS RATED FOR H20 LOADING.22.ALL STORM SEWER STRUCTURES SHALL HAVE A SMOOTH UNIFORM POURED MORTAR CHANNEL FROMINVERT IN TO INVERT OUT.23.NEW PIPES AND STRUCTURES WITHIN CONSTRUCTION LIMITS ARE TO BE CLEANED OUT TO REMOVEALL SILT AND DEBRIS PRIOR TO FINAL TURNOVER TO THE OWNER.24.IF HDPE PIPE IS SPECIFIED USE DUAL WALLED, HANCOR HQ, ADS N-12 PIPE OR APPROVED EQUAL.25.ALL FITTINGS AND ACCESSORIES INCLUDING BUT NOT LIMITED TO END CAPS, CLEANOUTS, REDUCERS,ETC., SHALL BE HDPE MATERIAL; IF SPECIFIED, COMPARABLE WITH STORAGE PIPES.26.PROVIDE BACKFILL WITH A MINIMUM OF 4" BEDDING MATERIAL OF #8 AGGREGATE COMPACTED IN 8"LIFTS TO 95% MAXIMUM DRY DENSITY.27.VERIFY EXISTING STORM INVERT ELEVATIONS PRIOR TO STARTING NEW STORM SEWER CONNECTION.NWESLEGEND: