HomeMy WebLinkAboutC603 Storm PnPE E
EEEEEEEEEW(F)W(F)W(F)W(F)W(F)W(F)W(F)W(F)W(F)W(F)W(F)W(F)W(F)W(F)W(F)W(F)W(F)W(F)W(F)W(F)W(F)W(F)W(F)W(F)W(F
)EEEEEEEEEEEEEW(F)36,833± S.F.FFE=901.50MLAG/PAD=900.83BUILDING #3FFE=901.50MLAG/PAD=900.83BUILDING #136,833± S.F.FFE=901.50MLAG/PAD=900.83BUILDING #3FFE=899.33FFE=899.46SANSANW(F)
W(F)
W(F)
W(
F
)DOLCE DRIVEDOLCE DR
IVE VERDI DRIVEW(F)
W(F)
W(F)
STM
STMSTMSTMSTM
STMSTMSTM
STM
STM
STM880885890895900905910915920925880885890895900905910915920925FINISHED GRADEEXISTING GRADEGRANULAR BACKFILLPROFILE LEGENDESANW(F)WENGINEERS 317 | 846 - 6611
800 | 452 - 6408
317 | 843 - 0546 fax
WEIHE
Land Surveying | Civil Engineering
Landscape Architecture
ALLAN H. WEIHE, P.E., L.S. - FOUNDER
10505 N. College Avenue
Indianapolis, Indiana 46280
weihe.netARIA APARTMENTS
APPRO
V
A
L
P
E
N
D
I
N
G
N
O
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
779 LENNOX COURTC603STORM SEWER PLAN & PROFILES PROJECT BENCHMARKDNR BM BOO 54, 1989IN BOONE COUNTY, CARMEL QUAD., IN THE NE ¼ OF SEC. 36,T. 18 N., R. 2 E., 2ND P.M.; ABOUT 1.0 MILE NORTHEAST OFZIONSVILLE; AT THE INTERSECTION OF DAUGHERTY DRIVEAND WEST 121ST STREET, IN THE NORTHEAST ¼ OF THEINTERSECTION, AT THE ENTRANCE TO THE EAGLE VILLAGESUBDIVISION; SET IN THE TOP OF A CONCRETE POST, 42.3FEET NORTHEAST OF AND ACROSS WEST 121ST STREETFROM A UTILITY POLE, 25.8 FEET NORTH OF THE CENTERLINEOF WEST 121ST STREET, 20.5 FEET WEST-NORTHWEST OF AMETAL TELEPHONE PEDESTAL, 20.2 FEET SOUTHWEST OF AWOOD FENCE END POST, 18.5 FEET EAST OF THE CENTERLINEOF DAUGHERTY DRIVE, 15.7 FEET NORTHWEST OF THE TOPOF THE CENTER OF A CMP CULVERT UNDER DAUGHERTYDRIVE, 15.4 FEET WEST OF THE SOUTHEAST CORNER OF ABRICK WALL, 10.1 FEET SOUTHWEST OF THE NORTHWESTCORNER OF A BRICK WALL, 5.8 FEET SOUTHWEST OF A METAL“DAUGHERTY DR” SIGN POST, LEVEL WITH THE GROUND; ADEPARTMENT OF NATURAL RESOURCES BRASS CONTROLSTATION TABLET, STAMPED "BOO 54 1989".ELEV.900.76 NAVD 88SITE TEMPORARY BENCHMARK1. CUT X ON THE NORTH BOLT OF A FIRE HYDRANT LOCATED47 FEET EAST OF THE NORTHWEST CORNER OF PARCEL I.ELEV.901.82 NAVD 882. RAILROAD SPIKE ON THE NORTH SIDE OF A UTILITY POLELOCATED ON THE EAST SIDE OF MICHIGAN ROAD 115 FEETNORTH AND 93 FEET EAST OF THE SOUTHEAST CORNEROF PARCEL I.ELEV.901.81 NAVD 88WSNESTORM SEWER NOTES1.THE CONTRACTOR SHALL ADHERE TO ALL TERMS AND CONDITIONS AS OUTLINED IN THE EPA OR APPLICABLE STATEGENERAL N.P.D.E.S. PERMIT FOR STORMWATER DISCHARGE ASSOCIATED WITH CONSTRUCTION ACTIVITIES ANDSTORMWATER POLLUTION PREVENTION PLAN.2.REFER TO THE INDIANA DEPARTMENT OF TRANSPORTATION (INDOT) STANDARD SPECIFICATIONS, LATEST EDITION,FOR BASIC MATERIALS AND CONSTRUCTION METHODS. THE SECTIONS BELOW FOR VARIOUS ITEMS ARE TO CLARIFYTHE INTENT OF THE REQUIREMENTS FOR THIS PROJECT. PLEASE NOTE THAT OTHER SECTIONS OF THE INDOTSTANDARD SPECIFICATIONS MAY ALSO BE APPLICABLE.3.THE CONTRACTOR SHALL CONTACT APPLICABLE STATE UNDERGROUND LOCATION SERVICE AT LEAST 72 HOURSPRIOR TO ANY WORK AND SHALL CONTACT THE OWNER AND/OR ENGINEER SHOULD UTILITIES APPEAR TO BE INCONFLICT WITH THE PROPOSED IMPROVEMENTS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TORELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS.4.THE PLANS SHOW THE LOCATION OF ALL KNOWN UTILITIES LOCATED WITHIN THE LIMITS OF CONSTRUCTIONACCORDING TO INFORMATION PROVIDED BY THE VARIOUS UTILITY COMPANIES, PREVIOUS CONSTRUCTION PLANSAND AS EVIDENCED BY OBSERVATION OF ABOVE GROUND CONDITIONS BY THE SURVEYOR. THE ACCURACY OF THISINFORMATION IS NOT GUARANTEED.5.THE CONTRACTOR SHALL CONTACT ALL UTILITY COMPANIES TO LOCATE MAINS, CONDUITS, SERVICE LINES, ETC.WITHIN THE CONSTRUCTION LIMITS. THE LOCATION AND PROTECTION OF UTILITY STRUCTURES, THEIR SUPPORTAND MAINTENANCE DURING CONSTRUCTION (IN COOPERATION WITH APPLICABLE UTILITY COMPANY) IS THEEXPRESSED RESPONSIBILITY OF THE CONTRACTOR.6.THE CONTRACTOR SHALL CONTACT ALL APPLICABLE UTILITIES AND VERIFY ANY AND ALL FEES ASSOCIATED WITHTHE INSTALLATION OF ALL UTILITIES.7.ALL CONSTRUCTION ON THIS SITE TO BE PERFORMED IN COMPLIANCE WITH O.S.H.A. STANDARDS FOR WORKERSAFETY.8.ANY PART OF STORM SEWER TRENCHES RUNNING UNDER OR WITHIN 5' OF PAVEMENT TO BE BACKFILLED WITHGRANULAR MATERIAL.8.IT IS THE CONTRACTORS RESPONSIBILITY TO VERIFY LOCATION, SIZE, AND ELEVATION OF EXISTING UTILITIES,STRUCTURES, PIPES, PAVEMENTS, ETC. AS RELATED TO THEIR WORK. NOTIFY ENGINEER OF ANY CONFLICT AND/ORDISCREPANCIES IN THE CONSTRUCTION DOCUMENTS.9.CLEARANCE BETWEEN STORM / SANITARY SEWER SYSTEMS AND DOMESTIC/FIRE LINE SERVICE, SHALL MAINTAIN 10'HORIZONTAL AND 18" VERTICAL.10.CONTRACTOR TO INSTALL CONCRETE CRADLES AT PIPE CROSSING WHEN THE VERTICAL SEPARATION (ASMEASURED FROM THE EXTERIOR OF THE PIPES) BETWEEN SANITARY SEWERS, WATER MAINS AND STORM SEWERSIS 18" OR LESS.11.SANITARY SEWER LINE IN PROXIMITY OF WATER LINE SHALL BE C900 WATER MAIN GRADE PVC.12.IF ANY EXISTING STRUCTURES TO REMAIN ARE DAMAGED DURING CONSTRUCTION, IT SHALL BE THE CONTRACTOR'SRESPONSIBILITY TO REPAIR AND/OR REPLACE THE EXISTING STRUCTURE AS NECESSARY TO RETURN IT TO IT'SCONDITION PRIOR TO CONSTRUCTION.13.WHEN PERFORMING EXCAVATIONS DURING PERIODS OF WET WEATHER, PROVIDE ADEQUATE DEWATERING,DRAINAGE AND GROUND WATER MANAGEMENT TO CONTROL MOISTURE OF SOILS.14.COMPACTED "B" BORROW BACK FILL REQUIRED OVER ALL UTILITIES IN PAVED AREAS.15.ALL UTILITY STRUCTURES IN PAVED AREAS SHALL BE FLUSH WITH PAVEMENT AND SHALL HAVE TRAFFIC BEARINGRING AND COVERS.16.COORDINATE LOCATIONS AND CONNECTIONS OF BUILDING STORM LINES WITH PLUMBING DRAWINGS.17.FOLLOW ALL LOCAL AND STATE CODES IN REFERENCE TO STORM SEWER INSTALLATION.18.ALL EXISTING MANHOLE AND CATCH BASIN GRATES SHALL BE ADJUSTED TO NEW FINISH GRADE ELEVATIONS.19.EXISTING PIPES WITHIN CONSTRUCTION LIMITS ARE TO BE CLEANED OUT TO REMOVE ALL SILT AND DEBRIS.20.ALL STORM PIPE CONNECTIONS AT STRUCTURES SHALL BE GROUTED TO ASSURE CONNECTION AT STRUCTURE ISWATERTIGHT.21.ALL STORM SEWER STRUCTURES IN PAVED AREAS SHALL BE FLUSH WITH PAVEMENT AND SHALL HAVE TRAFFICBEARING RING AND COVERS RATED FOR H20 LOADING.22.ALL STORM SEWER STRUCTURES SHALL HAVE A SMOOTH UNIFORM POURED MORTAR CHANNEL FROM INVERT IN TOINVERT OUT.23.NEW PIPES AND STRUCTURES WITHIN CONSTRUCTION LIMITS ARE TO BE CLEANED OUT TO REMOVE ALL SILT ANDDEBRIS PRIOR TO FINAL TURNOVER TO THE OWNER.24.IF HDPE PIPE IS SPECIFIED USE DUAL WALLED, HANCOR HQ, ADS N-12 PIPE OR APPROVED EQUAL.25.ALL FITTINGS AND ACCESSORIES INCLUDING BUT NOT LIMITED TO END CAPS, CLEANOUTS, REDUCERS, ETC., SHALLBE HDPE MATERIAL; IF SPECIFIED, COMPARABLE WITH STORAGE PIPES.26.PROVIDE BACKFILL WITH A MINIMUM OF 4" BEDDING MATERIAL OF #8 AGGREGATE COMPACTED IN 8" LIFTS TO 95%MAXIMUM DRY DENSITY.27.VERIFY EXISTING STORM INVERT ELEVATIONS PRIOR TO STARTING NEW STORM SEWER CONNECTION.LEGEND: