Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
181-662 - Engineers Estimate- Mass Grade only
Zotec Development Erosion Control - Mass Grading Engineer's Estimate July 16, 2019 Item No.Item Description Unit Estimated Quantity Price Cost 1 Erosion Control Items Inlet protection EACH 8 $100.00 $800 Silt fence LF 2,900 $1.50 $4,350 Filter Sock LF 505 $2.00 $1,010 Construction Fence (around wetland) LF 815 $5.00 $4,075 Seeding Lump Sum 1 $4,500.00 $4,500 Straw mulching Lump Sum 1 $2,500.00 $2,500 Scour Protection / Check Dam Lump Sum 1 $2,000.00 $2,000 Concrete Washout Lump Sum 2 $5,000.00 $10,000 Construction entrance (stone) CYD 175 $20.00 $3,500 Dewatering (pump, dewatering bag, piping, etc) Lump Sum 1 $10,000.00 $10,000 Subtotal $42,735 Total Cost = $42,735