Loading...
HomeMy WebLinkAboutC210 - Grading Plan - HOME GRANDSTAND - G2.1ST-201 TOR: 806.06 ATS SLDP ATS UP UP UP UP UP UP UP VE S T I B U L E B1 0 7 FI L M B1 0 8 EQ U I P . S T O R A G E B1 1 2 IC E R O O M B1 2 2 CL A S S R O O M B1 0 9 TA B L E S T O R A G E B1 2 6 ME E T I N G A R E A B1 0 1 HA L L W A Y A1 3 7 TR A I N I N G A1 2 9 VE S T I B U L E A1 2 7 FI R E P U M P A1 2 5 WO M E N ' S OF F I C I A L S / MA N A G E R S A1 2 6 CL A S S R O O M A1 2 2 CO R R I D O R A1 2 8 OF F I C E A1 3 8 IT / D A T A C L O S E T A1 3 5 EQ U I P M E N T A1 0 1 HA L L W A Y A1 0 5 CL A S S R O O M A1 0 6 CO A C H E S O F F I C E A1 0 7 LO C K E R S A1 0 9 BA T H R O O M A1 0 8 BA T H R O O M A1 1 2 SH O W E R S A1 1 3 EQ U I P M E N T A1 0 2 LA U N D R Y A1 0 3 LO C K E R R O O M A1 1 0 OF F I C E A1 1 7 VE S T I B U L E A1 1 1 WO M E N S / OF F I C I A L S A1 2 0 EL E C T R I C A L A1 1 4 CL I N I C A1 3 0 EL E V . E Q P T . A1 3 4 RE C O V E R Y A1 3 1 BA T H R O O M A1 3 9 BA T H R O O M A1 4 0 ST O . A1 2 1 CH A N G I N G R O O M A1 1 5 CO A C H E S A1 2 4 CO R R I D O R / HA L L W A Y A1 2 3 CO A C H E S ' LO C K E R B1 1 8 HE A D C O A C H OF F I C E B1 1 9 ?? WO M E N S / OF F I C I A L S BA T H R O O M A1 1 9 ST O R A G E B1 2 0 VE S T I B U L E B1 2 1 BA T H R O O M B1 1 6 CU S T O D I A L B1 2 3 SH O W E R S B1 1 5 HA L L W A Y B1 2 5 LO C K E R R O O M B1 1 4 ME C H A N I C A L B1 1 3 BA T H R O O M B1 1 0 BA T H R O O M B1 1 1 PA S S A G E B1 2 4 ME C H A N I C A L B1 0 2 FDC FDC DRY FDC FDC DRY TC 810.65 BC 810.15 810.73 TC 810.49 BC 809.99 TC 810.25 BC 809.75 TC 809.68 BC 809.68 TC 809.65 BC 809.65 TC 810.10 BC 809.60 TC 809.89 BC 809.39 TC 809.10 BC 809.10 TC 809.70 BC 809.70 TC 809.72 BC 809.22 TC 809.68 BC 809.18 TC 809.20 BC 809.20 TC 809.21 BC 809.21 TC 809.69 BC 809.19 TC 809.90 BC 809.40 TC 809.97 BC 809.47 TC 810.00 BC 809.50 TC 810.02 BC 809.52 810.54 810.50 810.44 810.40810.54 810.25 810.14810.14 810.30 809.32 806.25 806.20 806.29 806.29 806.36 806.29806.29 806.36 806.25 806.30 813.90 813.91 813.81813.81 813.81 816.13 816.23811.39 811.49 811.39 818.73818.73 809.85 809.80 810.23 818.73818.73 809.92 816.23 811.39811.39 811.49811.49 816.13816.13 813.81813.81 813.81 813.91813.95 807.08 813.91 813.91 806.75 806.30 806.30 806.27 806.29 806.20 806.20 809.95 809.68 809.69 810.02 806.22 806.20 806.08 806.01806.10 806.30 806.10 805.75 806.10 MEG 806.20 806.26 806.39806.39 806.84806.84 806.84 806.92 808.42 808.42 808.50 808.50 810.17 810.17810.17 810.13 810.10 810.11 810.10 810.09 810.11 810.13 806.36 MEG 806.20 806.20 813.95 806.36 813.91 816.13 810.45 806.33 810.60 810.68 806.20 809.73 810.10 810.30 810.20 810.73 810.11 813.95 810.70 808.99 806.10 806.01 810.07 810.08 810.28 806.10 806.30 806.10 806.30 806.10 MEG 806.20 MEG 806.15 MEG 806.21 MEG 806.15 MEG 806.31 806.07 806.23 806.17 806.33 MEG 806.26 MEG 806.27 MEG 806.39 MEG 806.32 MEG 806.36 806.24 806.28 806.26 806.30 MEG 806.34 MEG 806.35 MEG 806.37 MEG 806.31 MEG 806.35 ST-CO-2 ST-CO-1 ST-102 ST-103 ST-104-EX ST-202 ST-300 ST-301-EX ST-201 ST-203-EX 809.82 1 2 TC 810.12 BC 809.62 TC 809.69 BC 809.65 TC 809.83 BC 809.79 TC 810.31 MEG BC 809.81 MEG 810.22810.19 810.28 809.80 810.03 810.10 810.25 810.40 809.94 MEG 810.50 810.76 810.76 810.68 810.68810.59 MEG 810.52 810.63 MEG 810.43 809.44 809.64 809.66 806.21 805.76 806.21 811.49 816.23 809.97 810.10810.10 816.23 813.81 809.68 810.15 TC 810.39 MEG BC 809.89 MEG TC 810.41 MEG BC 809.91 MEG ST-101 BMP W-1 TC 809.60 BC 809.10 809.82 809.66TC 809.17 BC 809.17 TC 809.28 BC 809.28 TC 809.75 BC 809.75 TC 810.05 BC 809.55 810.27 809.92 3 3 3 ST-TD1 808.85 806.04 GRADING KEYNOTES 1.TOP OF NEW NORTH SPORTS LIGHT POLE FOUNDATION/PIER ELEVATION = 808.12'. 2.TOP OF NEW SOUTH SPORTS LIGHT POLE FOUNDATION/PIER ELEVATION = 809.12'. 3.CONTRACTOR TO CLEAN GRAVEL AND DEBRIS FROM THIS STORM PIPE. 1.SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL LEGEND. 2.TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWN WERE PROVIDED BY CEC CIVIL & ENVIRONMENTAL CONSULTANTS DATED MAY 17, 2022. THE ENGINEER MAKES NO GUARANTEES THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. 3.CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECT AREA INCLUDING UNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITE CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER. 4.NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT. 5.UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. UTILITY LINE RELOCATIONS REQUIRED FOR ROAD PROJECTS THAT RESULT IN A CONFLICT WITH PROPOSED DEVELOPMENT SHALL BE THE DEVELOPERS RESPONSIBILITY TO RESOLVE WITH THE UTILITY. EXISTING POLE LINES REQUIRED TO BE RELOCATED TO WITHIN ONE FOOT OF PROPOSED RIGHT-OF-WAY LINE. 6.DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL RESTORED/REPAIRED TO THE SATISFACTION OF THE CITY AT THE COMPLETION OF THE PROJECT. THE CONTRACTOR IS ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THE CITY PRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THE EXISTING CONDITION OF THE RIGHT-OF-WAY. SEE SHEET G0.1 FOR ADDITIONAL INFORMATION ON THE CITY OF CARMEL'S PAVING AND CURB POLICIES. 7.SEE STORM STRUCTURE TABLE ON SHEET SU1.2 FOR PIPE SIZES, MATERIAL AND INVERTS OF STORM SEWER. 8.ALL EXISTING PERIMETER ROAD DRAINAGE STRUCTURES AND BRIDGES ACROSS THE FRONTAGE OF THIS DEVELOPMENT ARE INDICATED ON THE PLANS. PROVISIONS HAVE BEEN MADE TO IMPROVE OR REPLACE ANY DRAINAGE STRUCTURES AND BRIDGES AS NECESSARY OR AS REQUEST BY THE CITY OT ACCOMMODATE THE PAVEMENT WIDENING, AUXILIARY LANES, MULTI-USE PATH, AND ANY OTHER REQUIRED IMPROVEMENTS TO THE PROPERTY OR THE ROADWAY. THE COST TO IMPROVE OR REPLACE ANY DRAIANGE STRUCTURES AND BRIDGES WILL BE BORNE BY THE DEVELOPER. 9.ALL PAVING WITHIN THE EXISTING AND PROPOSED CITY RIGHT -OF-WAY SHALL CONFORM TO THE REQUIREMENTS OF THE DEPARTMENT OF ENGINEERING. THE CONTRACTOR SHALL CONTACT THE DEPARTMENT OF ENGINEERING TO SCHEDULE A PRE-CONSTRUCTION MEETING TO REVIEW THE DEPARTMENT'S CONSTRUCTION REQUIREMENTS, STAFF NOTIFICATION REQUIREMENTS, REQUIRED INSPECTIONS FOR CERTAIN STAGES OF THE WORK AND TO REVIEW THE AUTHORITY OF THE DEPARTMENT AS IT RELATES TO WORK WITHIN THE EXISTING AND PROPOSED RIGHT-OF-WAY. GENERAL NOTES 100% CONSTRUCTION DOCUMENTS COPYRIGHT 2024 BY FANNING/HOWEY ASSOCIATES, INC. WWW.FHAI.COM ARCHITECT CONSULTANT KEY PLAN BUILDING "A" BUILDING "B" A B SOUTH SUPPORT BUILDING GREYHOUND ACTIVITIES CENTER 5201 E Main Street, Carmel, IN 46033 317-844-9961 PROJECT NUMBER: 222154.00 PROJECT ISSUE DATE: 7.26.2024 DRAWN BY: ARS 317.848.0966 350 E NEW YORK ST. SUITE 300, INDIANAPOLIS IN 46204 PROJECT MANAGER: PMR 222154.00 CARMEL HIGH SCHOOL STADIUM GRANDSTAND RENOVATION PROJECT CARMEL CLAY SCHOOLS 2390 E. SMOKY ROW (HOME SIDE) 2450 E. SMOKY ROW (VISITOR SIDE) CARMEL, IN 46032 PLAN NORTH REV. NO.DESCRIPTION DATE 19700317 No. CITY SUBMITTAL 08-14-20241 20 6002040 INLETS, VALVES, AND MARKS MADE UPON THE GROUND BY ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR EXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIES SHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAY ALL CONSTRUCTION. THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES EVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES, SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUND CAUTION !! Know what's below. before you dig.Call R Call 811 or 1-800-382-5544 Before You Begin Any Digging Project. Call 48 hours or 2 working days before you dig. It's Fast, It's Easy and It's the Law in the state of Indiana! G2.1 GRADING PLAN - HOME GRANDSTAND LEGEND HOME GRAND STAND FACILITY FFE = 806.36 MLAG = 806.99 MFPG = 807.99 GAC SSB DETENTION BASIN HOME GRAND STAND GRADING PLAN LEGEND EXISTING BUILDING PROPOSED BUILDING ADDITION 100% CLOGGED INLET GRATE PONDING PROPOSED CONTOUR W/ ELEVATION PROPOSED SPOT ELEVATION PROPOSED CURB ELEVATION MATCH EXISTING GRADE TOP OF CURB BOTTOM OF CURB EDGE OF PAVEMENT FLOWLINE TOP OF WALL EXISTING SPOT ELEVATION EXISTING CONTOUR W/ ELEVATION EXISTING STORM SEWER EXISTING SANITARY SEWER EXISTING WATER LINE EXISTING ELECTRIC LINE PROPOSED STORM SEWER PROPOSED STORM MANHOLE PROPOSED NYLOPLAST STRUCTURE PROPOSED STORM / SANITARY CLEANOUT PROPOSED SANITARY SEWER PROPOSED SANITARY MANHOLE APPROXIMATE LIMITS OF CONSTRUCTION TREE PROTECTION - PER DETAIL F/L1.2 MEG TC BC EP FL TW TC 810.43 BC 809.93 810.21 810 SEE SURVEY SHEET FOR ADDITIONAL LEGEND INFORMATION TP T P TP ADDENDUM NO. 2 08-23-20242 TAC COMMENTS 10-14-20243 TP TP TP TAC COMMENTS 11-01-20244