Loading...
HomeMy WebLinkAboutC510 - Site Utility Plan - STORM SEWERS - SU1.1ATS SLDP ATS UP UP UP UP UP UP UP VE S T I B U L E B1 0 7 FI L M B1 0 8 EQ U I P . S T O R A G E B1 1 2 IC E R O O M B1 2 2 CL A S S R O O M B1 0 9 TA B L E S T O R A G E B1 2 6 ME E T I N G A R E A B1 0 1 HA L L W A Y A1 3 7 TR A I N I N G A1 2 9 VE S T I B U L E A1 2 7 FI R E P U M P A1 2 5 WO M E N ' S OF F I C I A L S / MA N A G E R S A1 2 6 CL A S S R O O M A1 2 2 CO R R I D O R A1 2 8 OF F I C E A1 3 8 IT / D A T A C L O S E T A1 3 5 EQ U I P M E N T A1 0 1 HA L L W A Y A1 0 5 CL A S S R O O M A1 0 6 CO A C H E S O F F I C E A1 0 7 LO C K E R S A1 0 9 BA T H R O O M A1 0 8 BA T H R O O M A1 1 2 SH O W E R S A1 1 3 EQ U I P M E N T A1 0 2 LA U N D R Y A1 0 3 LO C K E R R O O M A1 1 0 OF F I C E A1 1 7 VE S T I B U L E A1 1 1 WO M E N S / OF F I C I A L S A1 2 0 EL E C T R I C A L A1 1 4 CL I N I C A1 3 0 EL E V . E Q P T . A1 3 4 RE C O V E R Y A1 3 1 BA T H R O O M A1 3 9 BA T H R O O M A1 4 0 ST O . A1 2 1 CH A N G I N G R O O M A1 1 5 CO A C H E S A1 2 4 CO R R I D O R / HA L L W A Y A1 2 3 CO A C H E S ' LO C K E R B1 1 8 HE A D C O A C H OF F I C E B1 1 9 ?? WO M E N S / OF F I C I A L S BA T H R O O M A1 1 9 ST O R A G E B1 2 0 VE S T I B U L E B1 2 1 BA T H R O O M B1 1 6 CU S T O D I A L B1 2 3 SH O W E R S B1 1 5 HA L L W A Y B1 2 5 LO C K E R R O O M B1 1 4 ME C H A N I C A L B1 1 3 BA T H R O O M B1 1 0 BA T H R O O M B1 1 1 PA S S A G E B1 2 4 ME C H A N I C A L B1 0 2 FDC FDC DRY 15 12 14 12 15 11 21 8 ST-101 BMP W-1 2 1 13 3 17 19 16 6 14 3 3 10 18 12 19 18 9 3 3 15 14 16 19 16 3 15 ST-CO-2 ST-CO-1 ST-102 ST-103 ST-104-EX ST-202 ST-300 ST-301-EX ST-201 ST-203-EX 6 LF OF 6" PVC Pipe @ 0.60% 25 LF OF 6" PVC Pipe @ 0.60% 11 5 L F O F 1 2 " R C P @ 0 . 5 0 % 3 LF OF 6" PVC Pipe @ 0.60% 6 LF OF 12" PVC Pipe @ 0.50% 53 LF OF 1 2 " R C P @ 0 . 7 5 % 56 L F O F 1 2 " R C P @ 0 . 7 5 % 28 LF OF 12" PVC Pipe @ 0.50% 37 LF OF 12" HDPE Pipe @ 0.50% 11 LF OF 6" PVC Pipe @ 0.49% 4 5 28 25 24 26 25 25 26 24 25 29 24 30 31 25 25 25 26 26 25 26 25 26 25 26 25 25 25 24 29 24 26 30 24 25 25 25 26 27 ST-200 33 LF OF 12" HDPE Pipe @ 0.50% 25 24 26 25 23 23 20 22 32 7 3 3 3 6 6 34 34 33 34 33 33 33 35 35 35 ST-TD1 CO M M O N A R E A " N " COMMON AREA "L" ST-400 ST-401-EX 100% CONSTRUCTION DOCUMENTS COPYRIGHT 2024 BY FANNING/HOWEY ASSOCIATES, INC. WWW.FHAI.COM ARCHITECT CONSULTANT KEY PLAN BUILDING "A" BUILDING "B" A B SOUTH SUPPORT BUILDING GREYHOUND ACTIVITIES CENTER 5201 E Main Street, Carmel, IN 46033 317-844-9961 PROJECT NUMBER: 222154.00 PROJECT ISSUE DATE: 7.26.2024 DRAWN BY: ARS 317.848.0966 350 E NEW YORK ST. SUITE 300, INDIANAPOLIS IN 46204 PROJECT MANAGER: PMR 222154.00 CARMEL HIGH SCHOOL STADIUM GRANDSTAND RENOVATION PROJECT CARMEL CLAY SCHOOLS 2390 E. SMOKY ROW (HOME SIDE) 2450 E. SMOKY ROW (VISITOR SIDE) CARMEL, IN 46032 PLAN NORTH REV. NO.DESCRIPTION DATE 19700317 No. CITY SUBMITTAL 08-14-20241 20 6002040 INLETS, VALVES, AND MARKS MADE UPON THE GROUND BY ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR EXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIES SHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAY ALL CONSTRUCTION. THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES EVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES, SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUND CAUTION !! Know what's below. before you dig.Call R Call 811 or 1-800-382-5544 Before You Begin Any Digging Project. Call 48 hours or 2 working days before you dig. It's Fast, It's Easy and It's the Law in the state of Indiana! SU1.1 SITE UTILITY PLAN - STORM SEWERS LEGEND UTILITY KEYNOTES 1.NEW BUILDING STORM LATERAL @ INVERT ELEV. = 803.75'. COORDINATE PIPE LOCATION, SIZE, DEPTH AND MATERIAL WITH SHEET P2.01 2.NEW BUILDING STORM LATERAL @ INVERT ELEV. = 803.58'. COORDINATE PIPE LOCATION, SIZE, DEPTH AND MATERIAL WITH SHEET P2.01 3.STORM SEWER CLEANOUT, PER DETAIL J/SU2.2 4.K100 (4") ACO TRENCH DRAIN WITH ADA GRATE (26.25', 8 SECTIONS). 5.K1-906 IN-LINE CATCH BASIN 6.CONNECT (CORE) NEW 6" DIA. PVC TO EXISTING STORM INLET AT INVERT ELEV. = 802.00' 7.CORE EXISTING STORM STRUCTURE AT INVERT ELEV. = 802.86' 8.CORE EXISTING STORM STRUCTURE TO CONNECT NEW STORM PIPE AT INVERT ELEV. = 800.39' 9.ACO TRENCH DRAIN "TD-H1" WITH ADA GRATE (32.5', 10 SECTIONS) 10.ACO TRENCH DRAIN "TD-H2" WITH ADA GRATE (32.5', 10 SECTIONS) 11.REPLACE EXISTING BEEHIVE CASTING WITH FLAT GRATE 12.RAISE EXISTING STORM STRUCTURE WITH ADJUSTING RINGS 13.40' OF SLOTTED DRAIN 14.45' OF SLOTTED DRAIN 15.NEW CLEANOUT AT SLOTTED DRAIN - SEE DETAIL J/SU2.2 16.45' OF 6" PERFORATED HDPE PIPE UNDERDRAIN @ 0.20% SLOPE 17.40' OF 6" PERFORATED HDPE PIPE UNDERDRAIN @ 0.20% SLOPE 18.25' OF 6" PERFORATED HDPE PIPE UNDERDRAIN @ 0.20% SLOPE 19.TEE FITTING (HDPE) 20.CONNECT NEW PIPE TO EXISTING MANHOLE STRUCTURE @ INVERT ELEV. = 800.39' 21.NEW STORM WATER QUALITY UNIT "W-1". AQUA-SWIRL XC-12. SEE DETAIL K/SU2.2 22.30' OF 12" HDPE N-12 PIPE @ 0.50% SLOPE 23.32' OF 6" HDPE N-12 PIPE @ 2.00% SLOPE 24.HDPE FITTING CONNECTING FOOTING UNDERDRAINS TO 6" HDPE N-12 SOLID PIPE 25.4" DIA. PERFORATED HDPE N-12 PIPE FOUNDATION DRAIN SLOPED AT 0.20% SLOPE 26.FOOTING DRAIN AT HIGH POINT 27.8' OF 6" HDPE N-12 SOLID PIPE @ 2.00% SLOPE 28.CONNECT FOOTING UNDERDRAINS TO ACO TRENCHDRAIN INLET ON NORTH SIDE OF STRUCTURE. 29.6" DIA. PERFORATED HDPE N-12 PIPE FOUNDATION DRAIN @ 2.00% SLOPE. 30.30' OF 8" DIA. HDPE N-12 SOLID PIPE @ 2.00% SLOPE 31.CONNECT NEW FOOTING UNDERDRAIN SYSTEM TO STORM STRUCTURE AT INVERT ELEV. = 803.14' 32.CONNECT NEW FOOTING UNDERDRAIN SYSTEM TO STORM STRUCTURE AT INVERT ELEV. = 801.41' 33.FIELD VERIFY LOCATION AND DEPTH OF EXISTING ELECTRICAL LINE. SUPPORT/SHORE DURING CONSTRUCTION OF NEW UTILITY AS REQUIRED. 34.FIELD VERIFY LOCATION AND DEPTH OF EXISTING TELECOMM LINE. SUPPORT/SHORE DURING CONSTRUCTION OF NEW UTILITY AS REQUIRED. 35.CONTRACTOR TO CLEAN GRAVEL AND DEBRIS FROM THIS STORM PIPE. EXISTING COMMUNICATION LINE PROPOSED ELECTRICAL LINE PROPOSED FIRE PROTECTION LINE PROPOSED GAS LINE PROPOSED SANITARY SEWER LINE PROPOSED STORM SEWER LINE PROPOSED WATER LINE PROPOSED FIRE HYDRANT PROPOSED FIRE DEPARTMENT PROPOSED STORM STRUCTURE UTILITY LEGEND PROPOSED POST INDICATOR VALVE SEE SURVEY FOR ADDITIONAL EXISTING LEGEND ITEMS PROPOSED CLEANOUT CONNECTION APPROXIMATE LIMITS OF CONSTRUCTION HOME GRAND STAND FACILITY FFE = 806.36' HOME GRAND STAND GAC SSB DETENTION BASIN 1.SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL LEGEND. 2.TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWN WERE PROVIDED BY CEC CIVIL & ENVIRONMENTAL CONSULTANTS DATED MAY 17, 2022. THE ENGINEER MAKES NO GUARANTEES THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. 3.CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECT AREA INCLUDING UNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITE CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER. 4.SEE SHEET SU1.2 FOR NEW SANITARY SEWER LATERAL, FIRE PROTECTION, DOMESTIC WATER, GAS, ELECTRICAL/POWER AND TELECOMMUNICATION INFORMATION. 5.THE PROPOSED STORM SEWER SYSTEM FOR THIS PROJECT WILL BE PRIVATE OWNED. 6.NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT. 8.UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. UTILITY LINE RELOCATIONS REQUIRED FOR ROAD PROJECTS THAT RESULT IN A CONFLICT WITH PROPOSED DEVELOPMENT SHALL BE THE DEVELOPERS RESPONSIBILITY TO RESOLVE WITH THE UTILITY. EXISTING POLE LINES REQUIRED TO BE RELOCATED TO WITHIN ONE FOOT OF PROPOSED RIGHT-OF-WAY LINE. 9.DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL RESTORED/REPAIRED TO THE SATISFACTION OF THE CITY AT THE COMPLETION OF THE PROJECT. THE CONTRACTOR IS ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THE CITY PRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THE EXISTING CONDITION OF THE RIGHT-OF-WAY. SEE SHEET G0.1 FOR ADDITIONAL INFORMATION ON THE CITY OF CARMEL'S PAVING AND CURB POLICIES. 10.ALL PAVING WITHIN THE EXISTING AND PROPOSED CITY RIGHT -OF-WAY SHALL CONFORM TO THE REQUIREMENTS OF THE DEPARTMENT OF ENGINEERING. THE CONTRACTOR SHALL CONTACT THE DEPARTMENT OF ENGINEERING TO SCHEDULE A PRE-CONSTRUCTION MEETING TO REVIEW THE DEPARTMENT'S CONSTRUCTION REQUIREMENTS, STAFF NOTIFICATION REQUIREMENTS, REQUIRED INSPECTIONS FOR CERTAIN STAGES OF THE WORK AND TO REVIEW THE AUTHORITY OF THE DEPARTMENT AS IT RELATES TO WORK WITHIN THE EXISTING AND PROPOSED RIGHT-OF-WAY. 11.CONTRACTOR SHALL CALL CENTERPOINT ENERGY AT 1-800-990-1930 TO CREATE A WORK ORDER TO RELOCATE GAS SERVICE AND METER. GENERAL NOTES PR O P E R T Y L I N E EASE M E N T L I N E ADDENDUM NO. 2 08-23-20242 TAC COMMENTS 10-14-20243 TP TP TP TP T P TP TP TP TP TP TP TP TP T P TP TREE PROTECTION - PER DETAIL F/L1.2